Farm-In Joint Venture Agreements adjacent to Yinnetharra
Released
Released
Announcement PDF
ASX ANNOUNCEMENT
11 March 2024
Farm-In Joint Venture Agreements executed at Yinnetharra
to grow prospective tenure
Highlights:
•
Binding Farm-in Joint venture Agreements executed with both Voltaic Strategic Resources Ltd (ASX:
VSR) and Reach Resources Limited (ASX: RR1) to Earn-In ownership of tenement packages in the
exciting Yinnetharra region.
•
The tenement packages in total cover an additional 413km2 and are located adjacent to and along
strike from the emerging resource already defined at Malinda, within the 100% owned Yinnetharra
Lithium Project.
•
As a result of these transactions Delta’s footprint in the emerging Gascoyne lithium province has
increased by over 30% to 1,769km2.
•
Earn-in Agreements for up to 80% of the following tenement packages:
o
Voltaic’s Ti Tree Project (243km2) which overlays extensive Leake Springs mafic-sediment
package that hosts mineralised pegmatites at Delta’s Malinda Lithium deposit (25.7Mt @
1.0% Li2O)1.
o
Reach Resources’ Morrissey Hill and Camel Hill (170km2) Projects, which overlays extensive
Lithium prospective host stratigraphy and Lithium soil anomalies.
Delta Lithium Limited (ASX: DLI) (“Delta” or the “Company”), is pleased to announce the execution of
binding Farm in Joint Venture Agreements with both Voltaic Strategic Resources Ltd (ASX: VSR) and Reach
Resources Limited (ASX: RR1) for tenements surrounding the Yinnetharra project area in the Gascoyne
region of Western Australia.
For ~$4.5 million upfront, Delta has secured the right to earn-in to three projects that are adjacent to the
existing Yinnetharra Lithium Project. Earn-ins for equity positions of up to 80% in each project can be
achieved with various deferred spending commitments.
Commenting on the transactions Managing Director, James Croser said;
“Delta is pleased to enter this strategic collaboration concurrently with Voltaic Strategic Resources and
Reach Resources, simultaneously gaining access to the expanded prospective stratigraphy in addition to
our existing Yinnetharra tenure, that has already delivered an impressive maiden resource at Malinda. The
combined land package significantly boosts the potential for a long-life lithium operation in the region. Both
Voltaic and Reach shareholders are poised to directly benefit from Delta’s existing on-site presence at
Yinnetharra and the expertise that our team will apply to our expanded footprint starting immediately.
“With such a dominant footprint in the region, particularly across the highly prospective Leake Springs
metamorphic unit adjacent to the Thirty Three suite granite, this deal increases the likelihood of a regional
scale project which all shareholders can now benefit from. We look forward to working with our new partners
and delivering on this potential.”
1.
Refer ASX Announcement 27 December 2023 titled ‘Yinnetharra Lithium Project Maiden Mineral Resource Estimate’
ASX ANNOUNCEMENT
11 March 2024
Yinnetharra Expansion
Delta has signed binding agreements with both Voltaic Strategic Resources Ltd (ASX: VSR) and Reach
Resources Limited (ASX: RR1) to secure access to the following project areas. Each agreement has two
stages that allow for Delta to earn-in to up 80% of the mineral rights within the projects.
Figure 1: Expanded Delta Lithium footprint in the Yinnetharra region
Voltaic Strategic Resources
The agreement with VSR includes the Ti Tree Project area, located to the south of the existing Yinnetharra
Project and approximately 10km south-east of the Malinda Resource. The tenement covers 243km2 and
overlays extensive Leake Spring mafic-sediment package, similar to the geological setting that hosts the
Malinda Resource. The details of the agreement are summarised in the two stages below.
Stage 1
1.
DLI to pay VSR $1.25M cash upon commencement.
2.
DLI can earn-in 51% of the Project by spending $3M over initial 2 years from commencement.
3.
DLI to manage the Project, in consultation with VSR.
ASX ANNOUNCEMENT
11 March 2024
4.
DLI may withdraw from the project at any time during the Stage 1 Earn-in Phase with 0%
interest, however DLI must incur a minimum expenditure of $1M before withdrawing from
Stage 1.
5.
Cash/shares at DLI's election to VSR to the value of $500,000 in DLI upon satisfying the
Stage 1 51% Participating Interest requirements.
Stage 2
6.
DLI can earn a further 29%, taking equity to 80% upon further spend of $6.25M over the next
2 years or delivery of MRE >10Mt @ 0.8% Li2O (at 0.5% cutoff).
7.
On completion of Stage 2, VSR can elect to either maintain its 20% by co-contributing; or
dilute its 20% interest. DLI and VSR may agree to the purchase by DLI of VSR's 20% interest
for a fair market value as agreed.
8.
If VSR dilutes to <5% Participating Interest, DLI will have the option to purchase VSR's
interest at fair market value (as agreed or determined by an expert).
9.
Cash/shares at DLI's election to VSR to the value of $1,000,000 in DLI upon satisfying the
Stage 2 80% Participating Interest requirements.
10. The Deal is subject to usual warranties relating to an agreement of this nature.
Reach Resources
The agreement with RRL includes two project areas, the Morrissey Hill Project and the Camel Hill Project.
Morrissey Hill is located approximately 8km south-west of Malinda and 12km south-east of the Jameson
Prospect. Camel Hill is located due south and directly adjacent to the Ti Tree Project area which is subject
to the agreement with VSR.
Morrissey Hill and Camel Hill 170km2. Both have demonstrated prospectivity as indicated by strong Li soil
geochemical anomalies, extensive host stratigraphy and extensive historical mines for lithium related
minerals.
The details of the agreement with Reach are summarised in the two stages below.
Stage 1
1.
DLI to pay RRL $3.2M cash upon commencement.
2.
DLI to manage the Project, with an agreed reporting framework, and in consultation with RRL.
3.
DLI can earn 51% of the Project by spending $3M on exploration over initial 2 years from
commencement, with at least 50% of expenditure to be attributed to drilling.
Stage 2
4.
DLI can earn a further 29%, taking equity to 80%, upon further spend of $6M over the next 2
years from Stage 1 completion, with at least 50% of expenditure to be attributed to drilling.
5.
On completion of Stage 2, RRL can elect to either maintain its 20% by co-contributing; or dilute
its 20% interest. DLI and RRL may agree to the purchase by DLI of RRL's 20% interest for a
fair market value as agreed by the parties negotiating in good faith.
6.
Cash/shares at DLI's election to RRL to the value of approximately $10M in DLI upon
discovering a mineral resource estimate (as that term is defined in the JORC Code) of equal to
or greater than 7.5Mt at 0.8% Li2O (at a 0.5% cut off grade).
7.
The Deal is subject to usual warranties relating to an agreement of this nature.
ASX ANNOUNCEMENT
11 March 2024
These agreements have significantly increased Delta’s footprint in the region by 30.5%. Our team of expert
geologists strongly believes that the broader Yinnetharra region has potential to become a new Western
Australian lithium province. These agreements provide Delta with important potential growth avenues for
the future.
The next steps for these projects involves detailed planning of explorations activities. This will contribute to
the minimum spend requirements for each agreement but also prioritise targets for upcoming drilling
programs.
ENDS
Release authorised by the Board of Delta Lithium Limited.
For further information, please contact:
Delta Lithium
James Croser, Managing Director
Peter Gilford, CFO & Company Secretary
+61 8 6109 0104
info@deltalithium.com.au
Investor/Media Enquiries
Citadel-MAGNUS
Michael Weir +61 402 347 032
Jono van Hazel +61 411 564 969
About Delta Lithium
Delta Lithium (ASX: DLI) is an exploration and development company focused on bringing high-quality, lithium-bearing pegmatite deposits, located
in Western Australia, into production. With current global JORC compliant resources of 40.4Mt@1.1%Li2O, strong balance sheet and an
experienced team driving the exploration and development workstreams, Delta Lithium is rapidly advancing its Lithium Projects. The Mt Ida Lithium
Project holds a critical advantage over other lithium developers with existing Mining Leases and an approved Mining Proposal. Delta Lithium is
pursuing a development pathway to unlock maximum value for shareholders.
Delta Lithium also holds the highly prospective Yinnetharra Lithium Project that is already showing signs of becoming one of Australia’s most
exciting lithium regions. The Company is continuing exploration activities at Yinnetharra, and an extensive multi-rig campaign will be ongoing
throughout 2024 to test additional targets and build on the Maiden Resource released in December 2023.
Competent Person's Statement
Information in this Announcement that relates to exploration results is based upon work undertaken by Mr. Charles Hughes, a Competent Person
who is a Member of the Australasian Institute of Mining and Metallurgy (AUSIMM). Mr. Hughes has sufficient experience that is relevant to the style
of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a ‘Competent Person’ as defined
in the 2012 Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’ (JORC Code). Mr. Hughes
is an employee of Delta Lithium Limited and consents to the inclusion in this announcement of the matters based on his information in the form and
context in which it appears.
Refer to www.deltalithium.com.au for past ASX announcements.
Past Exploration results and Mineral Resource Estimates reported in this announcement have been previously prepared and disclosed by Delta
Lithium in accordance with JORC 2012. The Company confirms that it is not aware of any new information or data that materially affects the
information included in these market announcements. The Company confirms that the form and content in which the Competent Person's findings
are presented here have not been materially modified from the original market announcement, and all material assumptions and technical
parameters underpinning Mineral Resource Estimates in the relevant market announcement continue to apply and have not materially changed.
Refer to www.deltalithium.com.au for details on past exploration results and Mineral Resource Estimates.
Disclaimer
This release may include forward-looking and aspirational statements. These statements are based on Delta Lithium management’s expectations
and beliefs concerning future events as of the time of the release of this announcement. Forward-looking and aspirational statements are necessarily
subject to risks, uncertainties and other factors, some of which are outside the control of Delta Lithium, which could cause actual results to differ
materially from such statements. Delta Lithium makes no undertaking to subsequently update or revise the forward looking or aspirational statements
made in this release to reflect events or circumstances after the date of this release, except as required by applicable laws and the ASX Listing
Refer to www.deltalithium.com.au for past ASX announcements.
ASX ANNOUNCEMENT
11 March 2024
Delta Lithium Group Mineral Resource estimate
Cut-off
Resource category
Mt Ida
Ta2O5
grade
Tonnes
Grade
Li2O
Grade
(Li2O%)
(Mt)
(% Li2O)
(Kt)
(Ta2O5 ppm)
-
-
-
-
6.7
1.0
65
51
19.0
1.0
181
67
Total Resource
25.7
1.0
246
62
Measured
-
-
-
-
7.8
1.3
104
224
6.8
1.1
76
154
14.6
1.2
180
191
Total Measured
-
-
-
-
Total Indicated
14.5
1.2
169
144
Total Inferred
25.8
1.0
257
90
Total
40.4
1.1
426
109
Measured
Yinnetharra
Li2O
Indicated
Inferred
Indicated
Inferred
Total Resource
0.5
0.5
Notes:
Tonnages and grades have been rounded to reflect
estimate. Inconsistencies in the totals are due to rounding.
the
relative
uncertainty
of
the
Share your feedback
Discover