Mt Ida Lithium Mineral Resource Estimate Update
Released
Released
Announcement PDF
ASX ANNOUNCEMENT
3 October 2023
`
Mt Ida Lithium Project Mineral Resource Estimate upgrade
Highlights:
The Mt Ida Lithium Project in the Goldfields region of Western Australia remains on track for approval
to commence mining operations later this year.
Delta Lithium is pleased to report an upgraded Mineral Resource Estimate (MRE) for lithium:
o
Updated combined Inferred and Indicated Mineral Resource Estimate of:
14.6Mt @ 1.2% Li2O (at a 0.55% Li2O cut off)*
o
136% Increase in Indicated Mineral Resources to 7.8Mt @ 1.3% Li2O
o
15% Increase in combined Indicated and Inferred Mineral Resources from 12.7Mt to 14.6 Mt
o
21% Increase in global contained Li2O to 180,000 tonnes
o
98% Increase in global Mineral Resource Estimate for the Sister Sam pegmatite to 9.3Mt @
1.3% Li2O
The large increase in Indicated Mineral Resources positions the Company well to complete Scoping
Studies and undertake detailed feasibility studies on the longer term concentrate project at Mt Ida
with design and engineering works already underway
The increase in global contained lithia positions the Company for a potential 10 year plus mining
operation
The large increase in contained metal for the Sister Sam pegmatite will allow the Company to
consider a less capital intensive mining option than previously envisaged
Drilling continues at Mt Ida with three RC rigs undertaking lithium and gold grade control drilling and
exploration and two diamond rigs undertaking geotechnical, metallurgical and Mineral Resource infill
drilling.
A Maiden Independent Mineral Resource Estimate for gold at Mt Ida is being finalised, will be
reported in the coming days and is expected to compliment the upgraded lithium MRE and lithium
strategy at Mt Ida.
*See Table 1 below for full breakdown of MRE
Delta Lithium Limited (ASX:DLI) (“Delta” or the “Company”), is pleased to announce an updated MRE
for its 100% owned Mt Ida Lithium Project in the Goldfields region of Western Australia.
An independent MRE update has been prepared by Snowden Optiro for the Mt Ida Lithium Project.
Commenting on the results Managing Director, James Croser says;
'What a fantastic result for the development of our Mt Ida Lithium Project and a true credit to the teamwork
and tenacity of Delta’s staff over the last 12 months since our maiden Mineral Resource.
The objective of this resource update was to provide a higher level of confidence in the mineralisation at Mt
Ida, particularly Sister Sam and Timoni, and thus enable confirmation of an economic lithium project. We’ve
done just that, more than doubling the Indicated Mineral Resource and confirming continuity and grade
where it matters in the potential early years of a mine, while also growing the contained llithia in the deposit
by 20%.
ASX ANNOUNCEMENT
2 October 2023
The Company is now able to undertake detailed engineering and design, on a larger indicated lithium
resource, and the Delta team have commenced activities to deliver this next milestone. We believe Mt Ida
has great potential to support a mine life of greater than ten years and deliver great value for shareholders.’
The Mineral Resource Estimate
The updated independent Lithium Mineral Resource Estimate was prepared by Snowden Optiro on the Sister Sam,
Timoni and Sparrow pegmatites at the Company’s wholly owned Mt Ida Lithium Project in the Eastern Goldfields
Region of Western Australia.
Compared with the maiden MRE reported in October 20221 this resource update has seen modest increases in tonnes,
grade and contained lithia with significant increases in higher confidence resources.
Table 1: Mineral Resource Estimate for Mt Ida Lithium Project.
Mt Ida Lithium September 2023
Cut-off
Resource category
Tonnes
Grade
Li2O
Grade
(Li2O%)
(Mt)
(% Li2O)
(Kt)
(Ta2O5 ppm)
-
-
-
-
1.3
1.0
14
189
1.2
0.9
11
144
Total Resource
2.5
1.0
25
167
Measured
-
-
-
-
1.5
1.2
18
206
1.3
1.1
14
156
Total Resource
2.7
1.2
32
183
Measured
-
-
-
-
5.0
1.4
72
238
4.3
1.2
50
156
9.3
1.3
123
200
Total Measured
-
-
-
-
Total Indicated
7.8
1.3
104
224
Total Inferred
6.8
1.1
76
154
Total
14.6
1.2
180
191
Indicated
Inferred
0.55
Indicated
Timoni
Inferred
0.55
Indicated
Sister Sam
Ta2O5
grade
Measured
Sparrow
Li2O
Inferred
Total Resource
0.55
Notes:
Tonnages and grades have been rounded to reflect the relative uncertainty of the estimate. Inconsistencies in the
totals are due to rounding.
1
Red Dirt Metals (2022). Maiden Lithium Mineral Resource Estimate at Mt Ida. ASX announcement 19 October 2022.
ASX ANNOUNCEMENT
2 October 2023
The Mineral Resource is reported above a range of cut-off grades below in Table 2.
Table 2; Mt Ida Lithium Project; global Mineral Resource reported by Li2O % cut-off grades.
Cut-off Li2O %
Million tonnes
Li2O %
Ta2O5 ppm
0.3
16.3
1.1
183
0.4
15.5
1.2
187
0.5
15.0
1.2
189
0.6
14.3
1.2
192
0.7
13.0
1.3
195
0.8
11.6
1.4
199
0.9
9.9
1.5
200
In compliance with ASX Listing Rule 5.8.1, Appendix 1 and JORC Table 1 contain all the geological and estimation
criteria utilised in the estimation of the Mt Ida Lithium Mineral Resource.
Figure 1: 3D view of drillholes and classified block models at Mt Ida with Indicated (RED) and Inferred (GREEN) Mineral
Resource categories looking to the south east
ASX ANNOUNCEMENT
2 October 2023
Figure 2; Plan views with geology with projections to surface of Mineral Resource wireframes and block models with Mineral
Resource outlines on the left and magnetics on the right
Next steps for the Mt Ida Lithium Project
Grade control drilling is underway for Mt Ida with a focus on the shallow portion of the Sister Sam lithium
mineralisation as well as the adjacent gold mineralisation, to enable detailed open pit design that is able to feed
into operational planning.
Resource drilling is underway using diamond drill rigs with the objective of converting the remaining Inferred Mineral
Resoures above the 0m RL elevation for a further lithium Mineral Resource update in December 2023.
Metallurgical drilling is ongoing with advanced DFS level metallurgical variability studies utilising >12 tonnes of core
underway.
Geotechnical work is ongoing for potential underground and open pit mining ground control and planning purposes.
Advanced mineralogical work is underway with the objective of providing geometallurgial parameters for resource
blocks in an upcoming Lithium Mineral Resource update scheduled to be delivered in December 2023.
Re-assay of historical pulps and coarse material that produced substandard QAQC results from SGS laboratories is
underway with the objective of positioning the project for potential Measured Resources in a Mineral Resource
estimate update in December 2023.
A Feasibility Study is underway for the longer term lithium concentrate project, with a scoping study on the potential
DSO operation due to be reported in the coming months.
Mining Projects teams are on site at Mt Ida with a Camp rebuild and expansion underway to provide accommodation
for commencement of mining operations.
A maiden gold Mineral Resource estimate is due in the coming days, with significant potential to add gold production
to the early works soon to be commenced on site.
ENDS
ASX ANNOUNCEMENT
2 October 2023
Release authorised by the Board of Delta Lithium Limited.
For further information, please contact:
Delta Lithium
James Croser, Managing Director
+61 8 6109 0104
info@deltalithium.com.au
Investor/Media Enquiries
Citadel-MAGNUS
Michael Weir +61 402 347 032
Jono van Hazel +61 411 564 969
About Delta Lithium
Delta Lithium (ASX: DLI) is an exploration and development company focused on bringing high-quality, lithium-bearing pegmatite deposits, located
in Western Australia, into production. With a strong balance sheet and an experienced team driving the exploration and develop- ment workstreams,
Delta Lithium is rapidly advancing its Mt Ida Lithium Project towards production. The Mt Ida Lithium Project holds a critical advantage over other lithium
developers with existing Mining Leases and heritage agreements in place. To capitalise on the prevailing buoyant lithium market, Delta Lithium is
pursuing a rapid development pathway to unlock maximum value for shareholders.
Delta Lithium also holds the highly prospective Yinnetharra Lithium Project that is already showing signs of becoming one of Australia’s most exciting
lithium regions. The Company is currently undergoing an extensive 400 drill hole campaign to be completed throughout 2023.
Competent Person's Statement
Information in this Announcement that relates to exploration results is based upon work undertaken by Mr. Charles Hughes, a Competent Person
who is a Member of the Australasian Institute of Mining and Metallurgy (AusIMM). Mr. Hughes has sufficient experience that is relevant to the style
of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a ‘Competent Person’ as defined
in the 2012 Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’ (JORC Code). Mr. Hughes
is an employee of Delta Lithium Limited and consents to the inclusion in this announcement of the matters based on his information in the form and
context in which it appears.
The information in this report which relates to Mineral Resources for the Sister Sam, Timoni and Sparrow deposits at the Mt Ida Lithium Project was
prepared by Ms Susan Havlin and reviewed by Dr Andrew Scogings, both employees of Snowden Optiro. Ms Havlin is a Member and Chartered
Professional of the Australasian Institute of Mining and Metallurgy and Dr Scogings is a Member of the Australian Institute of Geoscientists (RPGeo
industrial minerals) and they have sufficient experience relevant to the style of mineralisation, the type of deposit under consideration and to the
activity undertaken to qualify as Competent Persons as defined in the 2012 edition of the ‘Australasian Code for Reporting of Exploration Results,
Mineral Resources and Ore Reserves’. Ms Havlin and Dr Scogings consent to the inclusion of the information in the release in the form and context
in which it appears.
Refer to www.deltalithium.com.au for past ASX announcements.
Bibliography
Red Dirt Metals (2022). Maiden Lithium Mineral Resource Estimate at Mt Ida. ASX announcement 19 October 2022.
Red Dirt Metals (2023). Further excellent Lithium Results From Mt Ida Drilling. ASX announcement 13 April 2023.
Delta Lithium (2023). Drilling update for Mt Ida Lithium. ASX announcement 8 August 2023.
ASX ANNOUNCEMENT
2 October 2023
Appendix 1; Section 5.8 Geological Interpretation and Estimation Parameters
The following is a material information summary relating to the Mineral Resource estimate, consistent with ASX Listing
Rule 5.8.1 requirements. Further details are provided in the JORC Code Table 1 (Annexure 4).
Location, geology and geological interpretation
Delta’s Mt Ida Lithium Project (Mt Ida or the Project) is located 350 km northwest of Kalgoorlie in the Eastern Goldfields
region of Western Australia. Project tenements are 100% owned by wholly owned subsidiaries of Delta Lithium Ltd
and cover approximately 170km2 of the Mt Ida-Ularring Greenstone Belt, with multiple granted prospecting,
exploration, and mining licences. The majority of the Mineral Resources are located within M29/002 and M29/165.
The Project is situated in the Archaean Mt Ida-Ularring Greenstone Belt within the Kalgoorlie Terrane of the Yilgarn
Craton. Lithium mineralisation is hosted within shallow to moderate north-west dipping pegmatites which intrude a
thick package of upper greenschist-lower amphibolite facies with metamorphosed, steeply south-west dipping, mafic
volcanics and intrusives. Pegmatites within the area of interest are preferentially hosted within a thick anorthositeleucogabbro unit. This has occurred due to the brittle nature of the coarse-grained stratigraphy which has allowed
existing structures to be exploited and hydraulically fractured creating optimal conditions for pegmatite development
and subsequent emplacement.
The area has undergone strong folding and deformation with two large anticlines present within the area; the Mt Ida
Anticline and the Kurrajong Anticline with major shear zones located between the anticlines and a noticeable absence
of a syncline. It is this complex structural history that, particularly along the Timoni trend that has resulted in the GoldCopper endowment we see today. There is a distinct interaction between these Gold related shear structures and the
pegmatites which has permitted development in certain areas while hindering it in others.
Lithium mineralisation has been identified at three deposits: Sister Sam, Timoni and Sparrow. The mineralisation is
hosted within pegmatites that exhibit the following characteristics:
Preferentially emplaced in anorthosite-leucogabbro lithologies adjacent to a major series of shear zones.
Shallow to moderate north-westerly dips, increasing to almost vertical at the deepest extents of the Sister Sam
and Timoni deposits.
Pegmatite bodies have been intersected to around 1,000 m down dip and extend to about 150 m along strike.
Range in thickness from from about 2 to 35 m
Lithium-bearing minerals include spodumene, lepidolite and trilithionite
Gangue minerals are mainly quartz and albite, with some microcline and muscovite
Pegmatite mineralisation wireframes were interpreted using Leapfrog Geo 3D software, with graphical selection of
intervals used to form vein models of the mineralised pegmatites for all projects. Continuity and plunge orientations
were established by applying the structural measurements collected from oriented diamond core, surface mapping,
regional interpretation of the structural setting and exploratory data analysis. Weathering surfaces were interpreted
using regolith logging data.
Drilling techniques
The drilling database (Table 6) used to define the Mineral Resource comprises 148 reverse circulation (RC) drillholes
for a total of 19,502 m, 94 RC holes with diamond tails (RCD) for a total of 36,310.58 m and 60 diamond holes (DD)
for a total of 9,209.53 m (Table 3). Aircore (AC), and rotary air-blast (RAB) drillholes were used to aid in geological
interpretation; however, samples collected by AC and RAB were not used in the MRE.
RC drilling used a 143 mm face-sampling hammer bit. Diamond core was drilled using HQ2 and NQ2 bits. Drilling is
generally spaced at 40 m by 40 m out to 80 m by 80 m.
Data from 11 holes were used in the MRE that were not drilled by Delta. Data from these drillholes have been reviewed
against data from twin and proximal drillholes for validation and to confirm that there is no bias.
ASX ANNOUNCEMENT
2 October 2023
Company
Year
Drill type
Hamill
2002
RC
5
1,204.00
2003
RC
3
640.00
2004
RC
1
258.00
Lamancha
2006
DD
1
298.03
OBM
2020
RCD
1
381.50
RC
36
6,463.00
IGL
2021
Delta
2022
2023
Number of drillholes
Metres drilled
RCD
2
795.90
RC
7
1,514.00
RCD
62
23,100.15
DD
27
4,087.53
RC
96
9,423.00
RCD
52
27,494.58
DD
32
4,823.97
325
80,483.66
Total
Table 3 Drilling history at the Mt Ida Lithium deposit - within resource area
Sampling and assaying
RC samples were passed through an in-line cone splitter and 2-3 kg samples collected from 1m intervals. Delta
diamond core was logged in detail, with observations based on lithological boundaries. Half core samples were taken,
generally on 1m intervals or on geological boundaries where appropriate (minimum of 0.3 m to maximum of 1.1 m).
Samples were analysed, by Nagrom, SGS and ALS laboratories in Perth, for lithium, tantalum, iron and other elements
using a four-acid digest (hydrofluoric, nitric, perchloric and hydrochloric acids), suitable for silica-based samples with
an ICP-MS or ICP-OES finish and peroxide fusion and ICP-MS and OES fininsh.
Field blanks and industry certified standards were inserted by Delta at a rate of 1 per 20 samples and field duplicates
for RC were collected by Delta at a rate of 1 every 60 samples. No drill core duplicates have been completed at this
stage. Laboratory Certified Reference Materials (CRMs) and/or in-house controls, blanks, splits and replicates were
analysed with each batch of samples by the laboratory. Selected samples were re-analysed to confirm anomalous
results.
Mineralogy
Drill samples have been analysed by methods such as thin section (petrography), X-Ray Diffraction (XRD),
Quantitative Evaluation of Minerals by Scanning Electron Microscope (QEMSCAN) and Tescan Integrated Mineral
Analyser (an SEM method known as TIMA) in addition to visual logging of lithium-bearing and other pegmatite
minerals. For example, preliminary TIMA results for sixteen pegmatite samples from the Sister Sam deposit indicate
that spodumene, quartz, albite and Li-bearing mica (lepidolite and trilithionite) are the major mineral components of
the analysed samples. Lithium deportment (the mass percentage of lithium in each of the three main lithium mineral
groups) indicated that ~23-95% of total lithium is within spodumene and that micaceous minerals accounted for most
of the balance of lithium. Minor traces of other lithium minerals petalite and bityite were noted.
Metallurgy
Extraction of lithium minerals is an important consideration when considering lithium pegmatite Mineral Resources, as
different minerals have distinct lithium contents and behave differently during processing. For example pure
spodumene is expected to contain ~8% Li2O, compared with lithium micas which may contain ~3-7% Li2O depending
on the mineral species. Metallurgical testwork on drill samples to date indicates that flotation resulted in ~76-86% Li2O
total recoveries across two concentrates: spodumene (~5.6-6.5% Li2O) and mica (~2-3.4% Li2O). The total recovery
assumes that the mica and spodumene flotation concentrates are a saleable product and that there are reasonable
prospects of eventual economic extraction of both types of concentrate.
Bulk density
Bulk density was measured from 2,896 core samples (including 201 samples of mineralised pegmatite) from diamond
ASX ANNOUNCEMENT
2 October 2023
drillholes using Archimedes measurements. The majority of the measurements are from fresh rock. Dry bulk density
factors, assigned by rock type and weathering, have been applied to generate resource tonnages.
Estimation methodology
Grade estimation was into parent blocks of 20 m(E) x 20 m(N) x 5 m(RL). Block dimensions were selected from kriging
neighbourhood analysis and reflect the variability of the deposit as defined by the current drill spacing. Sub-cells, to a
minimum dimension of 1 m(E) x 1 m(N) x 1 m(RL), were used to represent volume. Assay data was selected within
the pegmatite mineralisation wireframes and composited to one metre lengths with no top‐cuts applied, as no outliers
were noted. Block grade estimation of lithium oxide (Li2O), tantalum pentoxide (Ta2O5) and ferric oxide (Fe2O3) grades
by domain was completed using ordinary kriging (OK) into parent block cells. Li2O, Ta2O5 and Fe2O3 are not correlated
and were estimated independently. Variogram analyses were undertaken to determine the grade continuity and the
kriging estimation parameters used for the OK. Hard grade boundaries were applied to the estimation of each domain.
Cut-off grades
The Mineral Resource estimates for the Mt Ida Lithium deposit have been reported above a cut-off grade of 0.55%
Li2O to represent the portion of the Mineral Resource that may be considered for eventual economic extraction by
combined open pit and potential underground methods. This cut-off grade is commensurate with cut-off grades applied
for reporting of lithium Mineral Resources hosted in spodumene-rich pegmatites elsewhere in Australia.
Mining factors
The Mineral Resource has been reported under conditions where the Company believes there are reasonable
prospects of eventual economic extraction through a combination of open pit and potential underground mining
methods. The lithium mineralisation at the Mt Ida Project extends from surface and it is expected that this will be
suitable for open pit mining. High grade mineralisation is present at depth, and it is expected that this will be suitable
for potential underground mining.
The recovery of economic material to saleable products spodumene and lithium mica is expected to be through the
application of industry standard process routes for lithium deposits; of crushing ‘ore’ to 3.35 mm, running this material
through a Dense Media Separation plant to recover as much coarse spodumene as possible, grinding the remainder
of the product to 105 microns and then flotation to create spodumene and lithium mica concentrates.
The Mt Ida Lithium Project is located in a well-established mining region and in close proximity to existing transport,
energy and camp infrastructure. Based on these assumptions, it is considered that there are no mining factors which
are likely to affect the assumption that the deposit has reasonable prospects for eventual economic extraction.
Metallurgical factors or assumptions
An approximate metallurgical recovery of 75% has been assumed in determining reasonable prospects of eventual
economic extraction, based on the range of 75-85% metallurgical recoveries received so far from metallurgical test
work undertaken on core samples from the Mt Ida Lithium Project. It is assumed that approximately 60-65% of lithia
will be recovered to a spodumene concentrate and 35-40% of lithia is recovered in a mica concentrate
Mineral Resource classification
The Mineral Resource has been classified following the guidelines of the Australasian Code for Reporting of
Exploration Results, Mineral Resources and Ore Reserves, 2012 (the JORC Code). The Mineral Resource has been
classified as Indicated and Inferred on the basis of confidence in geological, grade and mineralogical continuity and
by taking into account the quality of the sampling and assay data, and confidence in estimation of Li2O content. The
classification criteria were assigned based on the robustness of the grade estimate as determined from the drillhole
spacing, geological (including mineralogy) confidence and grade continuity.
The Sister Sam, Timoni and Sparrow’s Indicated Mineral Resources are supported by drilling with a nominal 40 m by
20 m to 80 m by 40 m spacing and where geological and grade continuity is demonstrated. Inferred Mineral Resources
are defined where drilling is at a wider spacing than used for definition of Indicated Mineral Resources.
ASX ANNOUNCEMENT
2 October 2023
Appendix 2; JORC Code, 2012 Edition
The following table provides a summary of important assessment and reporting criteria used for the reporting of the Mt Ida Lithium
Project Mineral Resource in accordance with the Table 1 checklist in The Australasian Code for the Reporting of Exploration
Results, Mineral Resources and Ore Reserves (The JORC Code, 2012 Edition) on an ‘if not, why not’ basis.
Table 1; Section 1: Sampling Techniques and Data
Criteria
Sampling
techniques
Drilling
techniques
Explanation
Nature and quality of sampling (eg cut
channels, random chips, or specific
specialised industry standard
measurement tools appropriate to the
minerals under investigation, such as
down hole gamma sondes, or handheld
XRF instruments, etc). These examples
should not be taken as limiting the broad
meaning of sampling. Include reference
to measures taken to ensure sample
representivity and the appropriate
calibration of any measurement tools or
systems used. Aspects of the
determination of mineralisation that are
Material to the Public Report. In cases
where ‘industry standard’ work has been
done this would be relatively simple (eg
‘reverse circulation drilling was used to
obtain 1 m samples from which 3 kg was
pulverised to produce a 30 g charge for
fire assay’). In other cases more
explanation may be required, such as
where there is coarse gold that has
inherent sampling problems. Unusual
commodities or mineralisation types (eg
submarine nodules) may warrant
disclosure of detailed information
Drill type (eg core, reverse circulation,
open-hole hammer, rotary air blast,
auger, Bangka, sonic, etc) and details
(eg core diameter, triple or standard
tube, depth of diamond tails, facesampling bit or other type, whether core
is oriented and if so, by what method,
etc).
Commentary
DLI
· Sampling activities have included reverse circulation
(RC) and diamond (DD) drilling, and rock chip sampling at
the Mt Ida Project. Core sampling of one historical drillhole
was carried out, with assaying, petrological and XRD
analysis completed.
· RC samples were collected by the metre from a static
cone splitter mounted directly below the cyclone on the rig.
· DD sampling was carried out to lithological/alteration
domain contacts with lengths between 0.3m and 1.1m.
· Drillholes are oriented perpendicular to the interpreted
strike of the mineralised pegmatites except where limited
access necessitates otherwise.
Historical data (drill data prior to DLI)
· Limited historical data has been supplied. Historical
sampling referenced has been carried out by Hammill
Resources, International Goldfields, La Mancha Resources,
Eastern Goldfields and Ora Banda Mining, and has included
rock chip sampling, and RC, DD and rotary air blast (RAB)
drilling.
· RC sampling was carried out via a riffle splitter for 1m
samples, and scoop or spear sampling for 4m composites,
RAB sampling was via spear into 4m composites.
· DD core has been cut and sampled to geological
intervals.
· These methods of sampling are considered to be
appropriate for this style of exploration.
DLI
· Drilling has been carried out by Orlando Drilling and
Frontline Drilling. RC drilling utilised an Explorac 220RC rig
with a 143 mm face sampling hammer bit. DD drilling was
completed by a truck mounted Sandvik DE820 and a KWL
1500 and is HQ2 and NQ2 diameter.
· Diamond tails average 200m depth.
· Core orientation was provided by an ACT REFLEX (ACT
II RD) tool.
Historical data
· Historical drilling has been completed by various
companies including Kennedy Drilling, Wallis Drilling,
Ausdrill and unnamed contractors.
· Historical DD drilling used NQ sized core.
· It is assumed that industry standard drilling methods and
equipment were utilised for all historical drilling.
Drill sample
Method of recording and assessing core
Delta
ASX ANNOUNCEMENT
2 October 2023
Criteria
recovery
Logging
Sub-sampling
techniques and
sample
preparation
Explanation
and chip sample recoveries and results
assessed. Measures taken to maximise
sample recovery and ensure
representative nature of the samples.
Whether a relationship exists between
sample recovery and grade and whether
sample bias may have occurred due to
preferential loss/gain of fine/coarse
material.
Whether core and chip samples have
been geologically and geotechnically
logged to a level of detail to support
appropriate Mineral Resource
estimation, mining studies and
metallurgical studies. Whether logging is
qualitative or quantitative in nature. Core
(or costean, channel, etc) photography.
The total length and percentage of the
relevant intersections logged.
If core, whether cut or sawn and whether
quarter, half or all core taken.
If non-core, whether riffled, tube
sampled, rotary split, etc and whether
sampled wet or dry. For all sample
types, the nature, quality and
appropriateness of the sample
preparation technique.
Quality control procedures adopted for
all sub-sampling stages to maximise
representivity of samples.
Measures taken to ensure that the
sampling is representative of the in situ
material collected, including for instance
results for field duplicate/second-half
sampling. Whether sample sizes are
appropriate to the grain size of the
material being sampled.
Commentary
· Sample condition is recorded for every RC drill metre
including noting the presence of water or minimal sample
return. Inspections of rigs are carried out daily.
· Recovery of diamond core is recorded by measuring the
core metre by metre. Core blocks have been inserted in
sections where core loss has occurred, is recorded during
the logging process and with photography of dry and wet
core.
· RC drill collars are sealed to prevent sample loss and
holes are normally drilled dry to prevent poor recoveries and
contamination caused by water ingress. Wet intervals are
noted in case of unusual results.
· It has been demonstrated that no relationship exists
between sample recovery and grade. No grade bias was
observed with sample size variation.
Historical data
· Limited sample recovery and condition information has
been supplied or found.
DLI
· Quantitative and qualitative geological logging of
drillholes adheres to Company policy and includes lithology,
mineralogy, alteration, veining and weathering.
· Diamond core logging records lithology, mineralogy,
alteration, weathering, veining, RQD, density and structural
data.
· All chip trays and drill core are photographed in full.
Diamond core is photographed post metre marking, for the
entire length of the hole, wet and dry.
· Drillholes are logged in their entirety.
· The level of detail of the logging is appropriate to
support Mineral Resource estimation, mining studies and
metallurgical studies.
· Logging is of a level suitable to support Mineral
Resource estimates and subsequent mining studies
Historical data
· A complete quantitative and qualitative logging suite was
supplied for historical drilling including lithology, alteration,
mineralogy, veining and weathering.
· It is unknown if all historical core was oriented. Limited
geotechnical logging has been supplied.
· No historical core or chip photography has been
supplied.
DLI
· DD sampling is undertaken by lithological/alteration
domain to a maximum
Share your feedback
Discover