Stunning Drilling Results from Yinnetharra
Released
Released
Announcement PDF
ASX ANNOUNCEMENT
23 June 2023
Stunning new drilling results from Yinnetharra
Highlights:
•
•
The Yinnetharra Lithium Project is an early-stage exploration project that covers a large area of
505km2 within the Gascoyne Lithium Province of Western Australia.
o
Six (6) well defined mineralised pegmatites at Malinda
o
Lithium mineralisation defined from surface to 350 metres depth so far
o
Malinda boasts a ‘Lithium Mile’, comprising two major parallel ore zones M1 and M36 each
now drilled out over 1.6km in strike length, remaining open down plunge.
New drilling results, both from M36 include:
o
33m @ 1.9% Li2O from 218m in YRRD118
o
19m @ 1.6% Li2O from 190m in YRRD114
•
The results are extremely important being the highest tenor intercept to date at Yinnetharra and a
major step out along strike in the M36 pegmatite which has currently been delineated over 1.7km
•
The Yinnetharra exploration results have shown consistent improvement, and each round of results
has informed and improved our knowledge of the orebody.
•
Our confidence that Yinnetharra will become a project of global scale has increased with each round
of results delivered.
Delta Lithium Limited (ASX:DLI) (“Delta” or the “Company”), is pleased to announce an update for
activities at its 100% owned Yinnetharra Lithium Project in the Gascoyne region of Western Australia.
At Yinnetharra, new assay results received from M36 pegmatite at the Malinda Prospect show the best
tenor mineralisation of any pegmatite received to date at the Yinnetharra Project. The results are extremely
important for the exploration program because they are from holes that are a significant step out along strike
from previous M36 results.
Commenting on the results Executive Chairman, David Flanagan said;
“Yinnetharra is a big system, 216 holes in and we have pegmatites defined along 1.6 kilometres of strike,
stacked in a package more than a kilometre wide”.
“Mineralisation is open down plunge and it’s right here in Western Australia, the single biggest lithium
producing region on the planet. We are very pleased with results to date and with multiple targets to test,
we have massive upside ahead of us.”
To date the Company has completed 216 holes for 51,208 metres at Yinnetharra. This announcement
relates to results received from two Reverse Circulation (RC) drill holes. A further 102 holes from
Yinnetharra project are in the process of being assayed with results due in batches throughout the next few
months. The Company is also on track to complete an additional ~100 holes before September 2023 at
Yinnetharra.
ASX ANNOUNCEMENT
23 June 2023
Figure 1: Yinnetharra plan showing general location of drilling at the Malinda Prospect and the newly discovered Jamesons
Prospect (note Licence area change due to compulsory relinquishment of tenure under the Mining Act).
New Results at the Malinda Prospect show thick, high-grade pegmatite.
Drilling on site at the Malinda Lithium Prospect is rapidly defining the scale of several lithium bearing
pegmatites (Figure 1). These results demonstrate excellent tenor and continuity of mineralisation within the
M36 pegmatite. The results are significant being the highest tenor mineralisation intercepted to date within
the Yinnetharra project. The M36 pegmatite is a continuous pegmatite body approximately 1.7km long, 540m wide and 100-300m in down dip extent.
ASX ANNOUNCEMENT
23 June 2023
Figure 2: Plan view showing drilling at Malinda.
Figure 3: Cross Section at Malinda
ASX ANNOUNCEMENT
23 June 2023
Release authorised by the Executive Chairman on behalf of the Board of Delta Lithium Limited.
For further information, please contact:
Delta Lithium
David Flanagan, Chairman
+61 8 6109 0104
info@deltalithium.com.au
Investor/Media Enquiries
Citadel-MAGNUS
Michael Weir +61 402 347 032
Jono van Hazel +61 411 564 969
About Delta Lithium
Delta Lithium (ASX: DLI) is an exploration and development company focused on bringing high-quality, lithium-bearing pegmatite deposits, located
in Western Australia, into production. With a strong balance sheet and an experienced team driving the exploration and develop- ment workstreams,
Delta Lithium is rapidly advancing its Mt Ida Lithium Project towards production. The Mt Ida Lithium Project holds a critical advantage over other lithium
developers with existing Mining Leases and heritage agreements in place. To capitalise on the prevailing buoyant lithium market, Delta Lithium is
pursuing a rapid development pathway to unlock maximum value for shareholders.
Delta Lithium also holds the highly prospective Yinnetharra Lithium Project that is already showing signs of becoming one of Australia’s most exciting
lithium regions. The Company is currently undergoing an extensive 400 drill hole campaign to be completed throughout 2023.
Competent Person's Statement
Information in this Announcement that relates to exploration results is based upon work undertaken by Mr. Charles Hughes, a Competent Person
who is a Member of the Australasian Institute of Mining and Metallurgy (AUSIMM). Mr. Hughes has sufficient experience that is relevant to the style
of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a ‘Competent Person’ as defined
in the 2012 Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’ (JORC Code). Mr. Hughes
is an employee of Delta Lithium Limited and consents to the inclusion in this announcement of the matters based on his information in the form and
context in which it appears.
Refer to www.reddirtmetals.com.au for past ASX announcements.
Past Exploration results and Mineral Resource Estimates reported in this announcement have been previously prepared and disclosed by Delta
Lithium in accordance with JORC 2012. The Company confirms that it is not aware of any new information or data that materially affects the
information included in these market announcements. The Company confirms that the form and content in which the Competent Person's findings
are presented here have not been materially modified from the original market announcement, and all material assumptions and technical
parameters underpinning Mineral Resource Estimates in the relevant market announcement continue to apply and have not materially changed.
Refer to www.reddirtmetals.com.au for details on past exploration results and Mineral Resource Estimates.
Disclaimer
This release may include forward-looking and aspirational statements. These statements are based on Delta Lithium management’s expectations
and beliefs concerning future events as of the time of the release of this announcement. Forward-looking and aspirational statements are necessarily
subject to risks, uncertainties and other factors, some of which are outside the control of Delta Lithium, that could cause actual results to differ
materially from such statements. Delta Lithium makes no undertaking to subsequently update or revise the forward looking or aspirational statements
made in this release to reflect events or circumstances after the date of this release, except as required by applicable laws and the ASX Listing
Rules.
ASX ANNOUNCEMENT
23 June 2023
Table 1: New drill hole assay intercepts
Hole ID
YRRD114
YRRD118
From
190
218
To
209
251
Length
19
33
Li2O %
1.58
1.89
Ta2O5 ppm
76
87
Fe2O3 %
0.89
2.99
Table 2: New hole collar details
HoleID
E
N
RL
EOH Depth
Dip
Azi
YRRD114
426391
7289343
320
348
-69.16
1.07
YRRD118
426373
7289267
320
282
-69.69
356.33
JORC Code, 2012 Edition
Table 1; Section 1: Sampling Techniques and Data Yinnetharra
Criteria
Explanation
Sampling
techniques
Nature and quality of sampling (e.g. cut
channels, random chips, or specific
specialised industry standard measurement
tools appropriate to the minerals under
investigation, such as down hole gamma
sondes, or handheld XRF instruments, etc).
These examples should not be taken as
limiting the broad meaning of sampling.
Include reference to measures taken to
ensure sample representivity and the
appropriate calibration of any measurement
tools or systems used. Aspects of the
determination of mineralisation that are
Material to the Public Report. In cases where
‘industry standard’ work has been done this
would be relatively simple (e.g. ‘reverse
circulation drilling was used to obtain 1 m
samples from which 3 kg was pulverised to
produce a 30 g charge for fire assay’). In
other cases more explanation may be
required, such as where there is coarse gold
that has inherent sampling problems. Unusual
commodities or mineralisation types (e.g.
submarine nodules) may warrant disclosure
of detailed information
Commentary
•
•
•
•
•
•
Diamond (DD) and reverse circulation (RC) drilling has
been carried out by Red Dirt Metals at the Yinnetharra
project
RC samples are collected from a static cone splitter
mounted directly below the cyclone on the rig
DD sampling is carried out to lithological/alteration
domains with lengths between 0.3-1.1m
Limited historic data has been supplied, reverse
circulation (RC) drilling and semi-quantative XRD analysis
have been completed at the Project. Historic drilling
referenced has been carried out by Segue Resources
and Electrostate (prior holder)
Historic sampling of RC drilling has been carried out via a
static cone splitter mounted beneath a cyclone return
system to produce a representative sample, or via scoop
These methods of sampling are considered to be
appropriate for this style of exploration
ASX ANNOUNCEMENT
23 June 2023
Criteria
Explanation
Drilling techniques
Drill type (e.g. core, reverse circulation, openhole hammer, rotary air blast, auger, Bangka,
sonic, etc) and details (e.g. core diameter,
triple or standard tube, depth of diamond tails,
face-sampling bit or other type, whether core
is oriented and if so, by what method, etc).
Commentary
•
•
•
•
Drill sample
recovery
Method of recording and assessing core and
chip sample recoveries and results assessed.
Measures taken to maximise sample recovery
and ensure representative nature of the
samples. Whether a relationship exists
between sample recovery and grade and
whether sample bias may have occurred due
to preferential loss/gain of fine/coarse
material.
•
•
•
•
•
Logging
Whether core and chip samples have been
geologically and geotechnically logged to a
level of detail to support appropriate Mineral
Resource estimation, mining studies and
metallurgical studies. Whether logging is
qualitative or quantitative in nature. Core (or
costean, channel, etc) photography. The total
length and percentage of the relevant
intersections logged.
•
•
•
•
•
•
Diamond drilling is being carried out by DDH1 utilising a
Sandvik DE880 truck mounted multipurpose rig and is HQ
or NQ diameter. RC drilling is carried out by Precision
Exploration Drilling (PXD) using a Schramm 850 rig
Some RC precollars have been completed, diamond tails
are not yet completed on these holes
Historic RC drilling was completed using a T450 drill rig
with external booster and auxiliary air unit, or unspecified
methods utilising a 133mm face sampling bit
It is assumed industry standard drilling methods and
equipment were utilised for all drilling
Sample condition is recorded for every RC drill metre
including noting the presence of water or minimal sample
return, inspections of rigs are carried out daily
Recovery on diamond core is recorded by measuring the
core metre by metre
Poor recoveries were occasionally encountered in near
surface drilling of the pegmatite due to the weathered
nature
Historic RC recoveries were visually estimated on the rig,
bulk reject sample from the splitter was retained on site in
green bags for use in weighing and calculating drill
recoveries at a later date if required
Sample weights were recorded by the laboratory
Quantitative and qualitative geological logging of
drillholes adheres to company policy and includes
lithology, mineralogy, alteration, veining and weathering
Diamond core and RC chip logging records lithology,
mineralogy, alteration, weathering, veining, RQD, SG and
structural data
All diamond drillholes and RC chip trays are
photographed in full
A complete quantitative and qualitative logging suite was
supplied for historic drilling including lithology, alteration,
mineralogy, veining and weathering
No historic chip photography has been supplied
Logging is of a level suitable to support Mineral resource
estimates and subsequent mining studies
ASX ANNOUNCEMENT
23 June 2023
Criteria
Explanation
Sub-sampling
techniques and
sample preparation
If core, whether cut or sawn and whether
quarter, half or all core taken.
If non-core, whether riffled, tube sampled,
rotary split, etc and whether sampled wet or
dry. For all sample types, the nature, quality
and appropriateness of the sample
preparation technique.
Quality control procedures adopted for all
sub-sampling stages to maximise
representivity of samples.
Measures taken to ensure that the sampling
is representative of the in situ material
collected, including for instance results for
field duplicate/second-half sampling. Whether
sample sizes are appropriate to the grain size
of the material being sampled.
Commentary
•
•
•
•
•
•
•
Quality of assay
data and laboratory
tests
•
The nature, quality and appropriateness of
the assaying and laboratory procedures used
and whether the technique is considered
partial or total. Nature of quality control
procedures adopted (e.g. standards, blanks,
duplicates, external laboratory checks) and
whether acceptable levels of accuracy (i.e.
lack of bias) and precision have been
established.
For geophysical tools, spectrometers,
handheld XRF instruments, etc, the
parameters used in determining the analysis
including instrument make and model,
reading times, calibrations factors applied and
their derivation, etc.
•
•
•
•
•
•
•
.
DD sampling is undertaken by lithological/alteration
domain to a maximum of 1.1m and a minimum of 0.3m.
Core is cut in half with one half sent to the lab and one
half retained in the core tray
Occasional wet RC samples are encountered, extra
cleaning of the splitter is carried out afterward
RC and core samples have been analysed for Li suite
elements by ALS Laboratories, Samples are crushed and
pulverised to 85% passing 75 microns for peroxide fusion
digest followed by ICPOES or ICPMS determination
Historic RC sampling methods included single metre
static cone split from the rig or via scoop from the green
bags, field duplicates were inserted at a rate of 1:20
within the pegmatite zones
Historic samples were recorded as being mostly dry
Historic samples were analysed by Nagrom or ALS
Laboratories where 3kg samples were crushed and
pulverised to 85% passing 75 microns for a sodium
peroxide fusion followed by ICP-MS determination for 25
elements.
Semi-Quantitative XRD analysis was carried out by
Microanalysis Australia using a representative subsample that was lightly ground such that 90% was
passing 20 µm to eliminate preferred orientation
Samples have been analysed by an external laboratory
utilising industry standard methods
The assay method utilised by ALS for core sampling
allows for total dissolution of the sample where required
Standards and blanks are inserted at a rate of 1 in 20 in
RC and DD sampling, all QAQC analyses were within
tolerance
The sodium peroxide fusion used for historic assaying is
a total digest method
All historic samples are assumed to have been prepared
and assayed by industry standard techniques and
methods
In the historic data field duplicates, certified reference
materials (CRMs) and blanks were inserted into the
sampling sequence at a rate of 1:20 within the pegmatite
zone
Internal standards, duplicates and repeats were carried
out by Nagrom and ALS as part of the assay process
No standards were used in the XRD process
ASX ANNOUNCEMENT
23 June 2023
Criteria
Explanation
Verification of
sampling and
assaying
The verification of significant intersections by
either independent or alternative company
personnel. The use of twinned holes.
Documentation of primary data, data entry
procedures, data verification, data storage
(physical and electronic) protocols. Discuss
any adjustment to assay data
Commentary
•
•
•
•
•
Location of data
points
Accuracy and quality of surveys used to
locate drill holes (collar and down-hole
surveys), trenches, mine workings and other
locations used in Mineral Resource
estimation. Specification of the grid system
used. Quality and adequacy of topographic
control
•
•
•
•
•
Data spacing and
distribution
Orientation of data
in relation to
geological structure
Sample security
Data spacing for reporting of Exploration
Results. Whether the data spacing and
distribution is sufficient to establish the
degree of geological and grade continuity
appropriate for the Mineral Resource and Ore
Reserve estimation procedure(s) and
classifications applied. Whether sample
compositing has been applied.
Whether the orientation of sampling achieves
unbiased sampling of possible structures and
the extent to which this is known, considering
the deposit type. If the relationship between
the drilling orientation and the orientation of
key mineralised structures is considered to
have introduced a sampling bias, this should
be assessed and reported if material
•
•
•
Drill holes were orientated to intersect the pegmatite
zones as close to perpendicular as possible; drill hole
orientation is not considered to have introduced any bias
to sampling techniques utilised as true orientation of the
pegmatites is yet to be determined
The measures taken to ensure sample
security
•
Samples are prepared onsite under supervision of Red
Dirt Metals staff and transported by a third party directly
to the laboratory
Historic samples were collected, stored, and delivered to
the laboratory by company personnel
•
•
Audits or reviews
Significant intercepts have been reviewed by senior
personnel
Some holes in the current diamond program have been
designed to twin historic RC drillholes and verify
mineralised intercepts
Primary data is collected via excel templates and thirdparty logging software with inbuilt validation functions, the
data is forwarded to the Database administrator for entry
into a secure SQL database
Historic data was recorded in logbooks or spreadsheets
before transfer into a geological database
No adjustments to assay data have been made other
than conversion from Li to Li2O and Ta to Ta2O5
Drill collars are located using a handheld GPS unit, all
holes will be surveyed by third party contractor once the
program is complete
GDA94 MGA zone 50 grid coordinate system was used
Downhole surveys were completed by DDH1 and PXD
using a multishot tool
Historic collars were located using handheld Garmin GPS
unit with +/- 5m accuracy
Historic holes were not downhole surveyed, planned
collar surveys were provided
The results of any audits or reviews of
sampling techniques and data.
•
Drill hole spacing is variable throughout the program area
Spacing is considered appropriate for this style of
exploration
Sample compositing has not been applied
None carried out
JORC Table 2; Section 2: Reporting of Exploration Results, Yinnetharra
Criteria
Mineral tenement
and land tenure
status
Commentary
Type, reference name/number, location and
ownership including agreements or material
issues with third parties such as joint ventures,
partnerships, overriding royalties, native title
interests, historical sites, wilderness or
national park and environmental settings. The
security of the tenure held at the time of
reporting along with any known impediments
to obtaining a licence to operate in the area
•
•
•
Drilling and sampling activities have been carried on
E09/2169
The tenement is in good standing
There are no heritage issues
ASX ANNOUNCEMENT
23 June 2023
Criteria
Exploration done
by other parties
Commentary
Acknowledgment and appraisal of exploration
by other parties.
•
•
The area has a long history of multi commodity exploration
including base and precious metals, industrial minerals
and gemstones stretching back to the 1970s, activities
carried out have included geophysics and geochemical
sampling, and some drilling
Targeted Li exploration was carried out in 2017 by Segue
Resources with follow up drilling completed by
Electrostate in July 2022
Geology
Deposit type, geological setting and style of
mineralisation.
•
The project lies within the heart of the Proterozoic
Gascoyne Province, positioned more broadly within the
Capricorn Orogen — a major zone of tectonism formed
between the Archean Yilgarn and Pilbara cratons. The
Gascoyne Province has itself been divided into several
zones each characterised by a distinctive and episodic
history of deformation, metamorphism, and granitic
magmatism. The project sits along the northern edge of
the Mutherbukin zone, along the Ti Tree Syncline.
Mutherbukin is dominated by the Thirty-Three supersuite
— a belt of plutons comprised primarily of foliated
metamonzogranite, monzogranite and granodiorite. Rareearth pegmatites have been identified and mined on small
scales
Drill hole
Information
A summary of all information material to the
understanding of the exploration results
including a tabulation of the following
information for all Material drill holes: easting
and northing of the drill hole collar elevation or
RL (Reduced Level – elevation above sea
level in metres) of the drill hole collar dip and
azimuth of the hole down hole length and
interception depth hole length. If the exclusion
of this information is justified on the basis that
the information is not Material and this
exclusion does not detract from the
understanding of the report, the Competent
Person should clearly explain why this is the
case.
•
A list of the drill hole coordinates, orientations and metrics
are provided as an appended table
Data aggregation
methods
In reporting Exploration Results, weighting
averaging techniques, maximum and/or
minimum grade truncations (e.g., cutting of
high grades) and cut-off grades are usually
Material and should be stated. Where
aggregate intercepts incorporate short lengths
of high grade results and longer lengths of low
grade results, the procedure used for such
aggregation should be stated and some typical
examples of such aggregations should be
shown in detail. The assumptions used for any
reporting of metal equivalent values should be
clearly stated.
•
•
No metal equivalents are used
Significant intercepts are calculated with a nominal cut-off
grade of 0.5% Li2O
Relationship
between
mineralisation
widths and
intercept lengths
These relationships are particularly important
in the reporting of Exploration Results. If the
geometry of the mineralisation with respect to
the drill hole angle is known, its nature should
be reported. If it is not known and only the
down hole lengths are reported, there should
be a clear statement to this effect (e.g. ‘down
hole length, true width not known’).
Appropriate maps and sections (with scales)
and tabulations of intercepts should be
included for any significant discovery being
reported These should include, but not be
limited to a plan view of drill hole collar
locations and appropriate sectional views.
•
•
The pegmatites are interpreted as dipping moderately to
steeply toward the south
Further drilling is required to confirm the true orientation of
the pegmatites across multiple lined
•
Figures are included in the announcement.
Where comprehensive reporting of all
Exploration Results is not practicable,
representative reporting of both low and high
grades and/or widths should be practiced to
avoid misleading reporting of Exploration
Results.
•
All drill collars, and significant intercepts have been
reported in the appendix
Diagrams
Balanced reporting
ASX ANNOUNCEMENT
23 June 2023
Criteria
Commentary
Other substantive
exploration data
Other exploration data, if meaningful and
material, should be reported including (but not
limited to): geological observations;
geophysical survey results; geochemical
survey results; bulk samples – size and
method of treatment; metallurgical test results;
bulk density, groundwater, geotechnical and
rock characteristics; potential deleterious or
contaminating substances.
•
None completed at this time
Further work
The nature and scale of planned further work
(e.g. tests for lateral extensions or depth
extensions or large-scale step-out drilling).
Diagrams clearly highlighting the areas of
possible extensions, including the main
geological interpretations and future drilling
areas, provided this information is not
commercially sensitive.
•
POW’s have been submitted to give RDT access to drill a
further 200RC and 100 Diamond holes immediately over
the area currently cleared under the existing heritage
agreement (work will only be carried out under the
guidelines of the heritage agreement and the agreed POW
terms).
Share your feedback
Discover