ASX ANNOUNCEMENT
31 October 2023
SEPTEMBER QUARTERLY ACTIVITIES REPORT
Delta Lithium Limited (ASX: DLI) (“Delta” or the “Company”) is pleased to provide the following report on
activities undertaken during the September quarter, 2023.
September Quarter Highlights
•
The Mt Ida Lithium Project in the Goldfields region of Western Australia remains on track for mining
approval later this year.
•
At the Yinnetharra Lithium Project the Company has defined a significant pegmatite swarm
comprising of six (6) well defined mineralised pegmatites at the Malinda Prospect.
•
RC and diamond drilling has identified a ‘Lithium Mile’, comprising of two major parallel ore zones
(M1 and M36), drilled out across 1.6km in strike length and remaining open down plunge.
•
Early metallurgical test results at Yinnetharra indicated high grade spodumene Li2O concentrates
from surface:
o
Sample 1 from the M1 pegmatite produced a 6.3% Li2O concentrate at a 77% recovery rate.
o
Sample 2 from the M47 pegmatite produced a 6.4% Li2O concentrate at a 61% recovery rate.
•
Drilling remains ongoing, as does hydrogeological and environmental surveys, soil sampling, rock
chip sampling and mapping throughout the Yinnetharra project area.
•
Subsequent to the quarter, significant increases to Mt Ida and its reserves have been announced:
o
Inferred and Indicated Maiden Resource Estimate (MRE) has been upgraded from 12.7Mt to
14.6Mt @ 1.2% Li2O 1
o
136% increase in Indicated Mineral Resources to 7.8Mt @ 1.3 % Li2O1.
o
Increase in global lithia positions Delta for a potential 10 year plus mining operation1.
o
Maiden co-located gold MRE of 3.1Mt @ 4.1g/t Au for 412,000 ounces 2, providing an
opportunity for early cash flow from the sale or toll treatment of the shallow gold ore.
•
With current low market prices for DSO lithium products, early works capital spend has been slowed
with the intent to focus on Feasibility studies for the Mt Ida lithium concentrate project.
•
The Company intends to leverage project improvements from the new gold resource at Mt Ida.
Commenting on the September quarter, Managing Director of Delta Lithium, Mr James Croser said:
“The past quarter has seen a continuation of solid effort by the Delta team and rapid progress at both Mt
Ida and Yinnetharra. We remain firmly committed to our exploration activities and building confidence in
our resources and project development plans.
The early stage Yinnetharra metallurgical results are exciting and reflect the enormous potential of the
project. The demonstration of good clean recoveries, in combination with the regional scale of the deposits
indicate that the Project has a strong future. Drilling at Malinda is ongoing and a maiden lithium resource
will be released in the December quarter.
1
2
Refer announcement entitled “Mt Ida Lithium Project Mineral Resource Estimate Upgrade” 3 October 2023
Refer announcement entitled “Mt Ida Maiden Gold Mineral Resource Estimate” 11 October 2023
1
ASX ANNOUNCEMENT
31 October 2023
We are entering an exciting period as we firm up confidence in our resources at Mt Ida, and work on refining
our studies and developing our understanding the various mining scenarios available.
“With a new gold resource at Mt Ida, studies will now include the potential for early revenue from the
exploitation of shallow gold ore, some of which falls within high grade pit shells.
Due to the current low market prices for DSO lithium products early works capital spend has been slowed
with the intent to focus on Feasibility studies for the Mt Ida lithium concentrate project.”
MT IDA LITHIUM PROJECT
Exploration and Resource Development
Subsequent to the end of the September quarter, on 3 October the Company delivered a Lithium Mineral
Resource Estimate (MRE) update for Mt Ida. This was the outcome of an aggressive infill drilling program that
lifted the Indicated Mineral Resources by 136% to 7.8Mt @1.3% Li2O. The total of Mt Ida’s inferred and
indicated MRE increased from 12.7Mt to 14.6Mt @ 1.2% Li2O. The increase in Indicated Mineral Resources
strategically positions the Company to undertake the detailed feasibility studies on the primary lithium
concentrate project at Mt Ida with design and engineering works underway.
Prior to the discovery of lithium at the Mt Ida Project, gold was extracted from the tenements by various
companies intermittently. During the comprehensive drilling program targeting lithium at the Mt Ida Project,
results for gold and copper have also been intercepted and assayed. This resulted in a Maiden Independent
Mineral Resource Estimate declared on 11 October of 3.1Mt @ 4.1g/t Au for 412,000 ounces.
The co-located gold resource has the potential to enhance and de-risk the development of the Mt Ida
Lithium project, offering an opportunity for cash flow from the sale or toll treatment of shallow gold ore.
Figure 1 Location of the Mt Ida Lithium Project.
2
ASX ANNOUNCEMENT
31 October 2023
Project Development
In March this year the Company submitted a Native Vegetation Clearing Permit (NVCP) and Mining Proposal
for a Stage 1 Approval to Mine at Mt Ida (Mining Proposal). The NVCP has since been approved and the
Company awaits approval of the Mining Proposal. The benefit of two (2) granted mining leases in
combination with an approved Mining Proposal strongly supports an accelerated path to production.
In executing certain early works such as camp upgrades and water infrastructure, a number of work
packages that are required for the Concentrate Project can be implemented ahead of time. This early
application of capital ahead of Concentrate Project FID (Final Investment Decision), provides a significant
opportunity to de-risk and accelerate project execution. Multiple work streams have continued to progress
over the quarter, all of which will benefit the longer-term Mt Ida Lithium Concentrate Project.
September quarter progress:
•
Mining Proposal is still under assessment by DMIRS. This quarter the Company submitted two separate
responses to Requests for Information (RFI) that were received from Department of Mines, Industry
Regulation and Safety (DMIRS). As at the date of this announcement, there is no outstanding
information the Company has been requested to provide. Recently the Company received
correspondence from DMIRS that they are still reviewing geotechnical information.
•
Mt Ida Road Diversion;
•
o
Design work by consultants, has been completed. Design has been approved by the Shire
of Menzies.
o
Consent letters formalising support for the road diversion were received from key
stakeholders, Aurenne Group and Zenith Australia Group.
o
Native Vegetation Clearing Permit (NVCP) submission to Department of Water and
Environmental Regulation (DWER) is awaiting approval from Department of Planning, Lands
and Heritage (DPLH)
Mt Ida Stage 1 Accommodation Village;
o
Supplier selected and early works agreement executed to enable commencement of
design, engineering, and building construction.
o
Installation scheduled to begin during the December quarter
•
Hydrogeology – As a component of the Mt Ida Concentrate Project DFS a preliminary site-wide water
balance has been developed to understand raw water demand. A groundwater exploration
programme has subsequently been developed based on an understanding of the hydrogeological
setting and the estimated total yield required from a borefield. The water exploration drilling
campaign is planned to commence during this quarter (subject to an appropriate drilling contractor
being secured), with the aim to define site water supply.
•
Metallurgy;
o
Key planning tasks for DFS level metallurgical testwork have been completed (defining ore
body domains for testwork, development of RFPs (Request for Proposals) relevant laboratories
and vendors to tender for the work)
o
Scoping level metallurgical testwork was progressed and is now almost complete. Results of
this work confirm conditions to take forward into DFS level metallurgical testwork.
3
ASX ANNOUNCEMENT
31 October 2023
Post quarter end:
•
A revision to mine planning work completed earlier in the year has now commenced using the
updated Mt Ida lithium Mineral Resource Estimate that was announced to the market 3rd October.
Mine planning has been completed on open pit mineable gold resources at Sister Sam, Mt Ida.
•
Key components of DFS level metallurgical testwork awarded to relevant laboratories and service
providers; relevant testwork to commence this quarter.
YINNETHARRA LITHIUM PROJECT
Exploration has continued over the last quarter at the Malinda Prospect located in the Gascoyne Lithium
Province of Western Australia. The results to date of the early-stage exploration project spanning 505km2
have demonstrated excellent tenor and continuity of mineralisation across six (6) significant pegmatite
swarms. RC and diamond drilling has confirmed a ‘Lithium Mile’, comprising of two major parallel ore zones
(M1 and M36). Initial metallurgical tests have indicated high grade spodumene Li2O concentrates with low
impurities from surface:
o
o
Sample 1 from M1 pegmatite produced a 6.3% Li2O concentrate at a 77% recovery rate
Sample 2 from M47 pegmatite produced a 6.4% Li2O concentrate at a 61% recovery rate
Table 1 details of metallurgy
Sample 1 was composed of drill core from YRRD005 drilled into M1 pegmatite and Sample 2 was composed
of rock chips and drill core from YNEX004 drilled into the M47 pegmatite. The method of beneficiation that
was used was flotation in these initial sample tests. The ability to recover spodumene from outcrop is highly
beneficial for the project.
Drilling in the quarter continued to define extensions to known pegmatites with continuous spodumene rich
mineralisation identified.
4
ASX ANNOUNCEMENT
31 October 2023
New drilling results released to the market include:
o
29m @ 1.5% Li2O from 203m Inc. 11m @ 3% Li2O from 221m in YRRD120
o
36m @ 1.1% Li2O from 254m Inc. 6m @ 3.1% Li2O from 282m in YRRD095
o
30m @ 1.1% Li2O from 291m Inc. 10m @ 2.2% Li2O from 310m in YRRD071
o
29m @ 1.0% Li2O from 199m in YRRD133
o
9m @ 1.3% Li2O from 279m in YRRD132
o
15m @ 1.5% Li2O from 135m in YRRD212
o
11m @ 1.1% Li2O from 75m in YRRD080
o
12m @ 1.2% Li2O from 183m in YRRD150
Figure 2: Plan view showing drilling at Malinda
Drilling continues with three (3) drill rigs operating across the Yinnetharra Project. Baseline environmental
surveys are being undertaken as well as hydrogeological studies in the area. Geological mapping, soil
sampling and rock chip sampling continue throughout the extensive tenement package.
5
ASX ANNOUNCEMENT
31 October 2023
At Malinda, new metallurgical testwork composites are being submitted as well as follow up work being
undertaken on pre-existing composites. Detailed mineralogical studies have begun to ensure full
understanding of underlying parameters that dictate metallurgical recovery. All work to date suggests
spodumene is by far the most abundant Li mineral at the project.
CORPORATE
On 2 August 2023, Mr Steven Kovac was welcomed as a Non-Executive Director of Delta Lithium. Mr Kovac
will act as the nominee Director of Idemitsu Australia following Idemitsu Australia significant investment in
the Company earlier this year.
On 12 September 2023, Delta Lithium announced the replacement of David Flanagan as Chairman by
highly regarded industry executive Mr Chris Ellison as Non-Executive Chairman, and Mr Josh Thurlow as NonExecutive Director.
Mr Ellison is the founding shareholder and Managing Director of Mineral Resources Limited. He has more
than 40 years of experience in the mining contracting, engineering and resource processing industries.
Mr Thurlow is the current Chief Executive – Lithium for Mineral Resources Limited and is responsible for the
continued growth of the MinRes lithium assets and partnerships.
Delta Director Mr James Croser has been appointed as interim Managing Director and CEO while a
comprehensive executive search is undertaken. Mr Croser brings 25 years of operations and corporate
experience in the Australian mining sector as a mining engineer. Mr Croser was instrumental in the acquisition
of the Company’s current projects and has been a pivotal member of the Delta Board since December
2020.
During the quarter, $3,021,294 was received for the exercise of 12,085,176 unlisted $0.25 options in the June
quarter. A further $272,322.25 was received for the exercise of 1,089,289 options that were converted to
shares post the end of the quarter.
There were 1,450,000 performance rights issued and 16,500,000 performance rights cancelled. As at 30June
2023, Delta Lithium has the following securities on issue:
• 532,658,668 fully paid ordinary shares;
• 26,939,479 unlisted options (various exercise prices and expiry dates) and
• 15,690,000 performance rights (various vesting conditions and expiry dates).
LITHIUM MARKETING AND BUSINESS DEVELOPMENT
The Company continued to field significant interest from potential offtake partners within the global lithium
supply chain during the quarter. This included site visits with interested parties from a wide variety of
downstream lithium markets as well as meetings with significant groups from Japan, Korea, India and China
coupled with speaking at leading industry conferences.
Reported spot prices for both lithium raw materials and lithium chemicals retreated during the quarter but
remain above prices observed at the beginning of 2022.
6
ASX ANNOUNCEMENT
31 October 2023
The Company continues to engage with market participants along the supply chain and build relationships
with customers for the future potential sale of spodumene concentrate and lepidolite pre-float products
that are produced from the conceptual lithium flowsheet for Mt Ida. We note that current prices mean that
the market for a potential DSO product is effectively closed at present. Realised prices for lithium
concentrate products from existing producers utilise a variety of pricing mechanisms and quotation periods
and we expect that over time more transparency around price discovery, particularly that for lithium raw
materials will evolve as genuine liquidity in the physical spot market grows. We continue to highlight that the
vast majority of lithium raw material and chemical trade is under long-term contracts and not via the thinlytraded spot market.
ASX Compliance
For the purpose of Listing Rule 5.3.2, the Company confirms that there were no mining production and
development activities during the quarter by the Company or its subsidiaries.
In accordance with section 6 of the Appendix 5B, the Company advises that $677k was paid to related
parties of the entity and their associates during the quarter, including Executive and Non-Executive Director
fees.
Release authorised by the Managing Director on behalf of the Board of Delta Lithium Limited.
For further information, please contact:
Delta Lithium
James Croser, Managing Director
Peter Gilford, CFO & Company Secretary
+61 8 6109 0104
info@deltalithium.com.au
Investor/Media Enquiries
Citadel-MAGNUS
Michael Weir +61 402 347 032
Jono van Hazel +61 411 564 969
7
ASX ANNOUNCEMENT
31 October 2023
About Delta Lithium
Delta Lithium (ASX: DLI) is an exploration and development company focused on bringing high-quality, lithium-bearing pegmatite deposits, located
in Western Australia, into production. With a strong balance sheet and an experienced team driving the exploration and development workstreams,
Delta Lithium is rapidly advancing its Mt Ida Lithium Project towards production. The Mt Ida Lithium Project holds a critical advantage over other lithium
developers with existing Mining Leases in place. Delta Lithium is pursuing a development pathway to unlock maximum value for shareholders.
Delta Lithium also holds the highly prospective Yinnetharra Lithium Project that is already showing signs of becoming one of Australia’s most exciting
lithium regions. The Company is currently undergoing an extensive 400 drill hole campaign to be completed throughout 2023.
Competent Person's Statement
Information in this Announcement that relates to exploration results is based upon work undertaken by Mr. Charles Hughes, a Competent Person
who is a Member of the Australasian Institute of Mining and Metallurgy (AUSIMM). Mr. Hughes has sufficient experience that is relevant to the style
of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a ‘Competent Person’ as defined
in the 2012 Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’ (JORC Code). Mr. Hughes
is an employee of Delta Lithium Limited and consents to the inclusion in this announcement of the matters based on his information in the form and
context in which it appears.
Refer to www.deltalithium.com.au for past ASX announcements.
Past Exploration results and Mineral Resource Estimates reported in this announcement have been previously prepared and disclosed by Delta
Lithium in accordance with JORC 2012. The Company confirms that it is not aware of any new information or data that materially affects the
information included in these market announcements. The Company confirms that the form and content in which the Competent Person's findings
are presented here have not been materially modified from the original market announcement, and all material assumptions and technical
parameters underpinning Mineral Resource Estimates in the relevant market announcement continue to apply and have not materially changed.
Refer to www.deltalithium.com.au for details on past exploration results and Mineral Resource Estimates.
Disclaimer
This release may include forward-looking and aspirational statements. These statements are based on Delta Lithium management’s expectations
and beliefs concerning future events as of the time of the release of this announcement. Forward-looking and aspirational statements are
necessarily subject to risks, uncertainties and other factors, some of which are outside the control of Delta Lithium, that could cause actual results
to differ materially from such statements. Delta Lithium makes no undertaking to subsequently update or revise the forward looking or aspirational
statements made in this release to reflect events or circumstances after the date of this release, except as required by applicable laws and the
ASX Listing
8
Rule 5.5
Appendix 5B
Mining exploration entity and oil and gas exploration entity
quarterly cash flow report
Name of entity
DELTA LITHIUM LIMITED (ASX CODE: DLI)
ABN
Quarter ended (“current quarter”)
67 107 244 039
30 SEPTEMBER 2023
Current quarter
$A’000
Year to date
-
-
-
-
(b) development
-
-
(c)
production
-
-
(d) staff costs
(1,243)
(1,243)
(e)
(1,033)
(1,033)
-
-
Consolidated statement of cash flows
1.
Cash flows from operating activities
1.1
Receipts from customers
1.2
Payments for
(a)
exploration & evaluation (if expensed)
administration and corporate costs
(3 months)
$A’000
1.3
Dividends received (see note 3)
1.4
Interest received
641
641
1.5
Interest and other costs of finance paid
(1)
(1)
1.6
Income taxes paid
-
-
1.7
Government grants and tax incentives
1,091
1,091
1.8
Other (provide details if material)
-
-
1.9
Net cash from / (used in) operating activities
(544)
(544)
2.
Cash flows from investing activities
2.1
Payments to acquire:
-
-
-
-
(1,049)
(1,049)
(a)
entities (net of cash acquired)
(b) tenements
(c)
property, plant and equipment
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
P a g e |1
Consolidated statement of cash flows
(d) exploration & evaluation (if capitalised)
Current quarter
$A’000
Year to date
(14,073)
(14,073)
(3 months)
$A’000
(e)
investments
-
-
(f)
other non-current assets
-
-
entities
-
-
(b) tenements
-
-
(c)
-
-
(d) investments
-
-
(e)
other non-current assets
-
-
2.3
Cash flows from loans to other entities
-
-
2.4
Dividends received (see note 3)
-
-
2.5
Other (provide details if material)
-
-
2.6
Net cash from / (used in) investing activities
(15,122)
(15,122)
3.
Cash flows from financing activities
3.1
Proceeds from issues of equity securities
(excluding convertible debt securities)
-
-
3.2
Proceeds from issue of convertible notes
-
-
3.3
Proceeds from exercise of options
3,209
3,209
3.4
Transaction costs related to issues of equity
securities or convertible debt securities
(383)
(383)
2.2
Proceeds from the disposal of:
(a)
property, plant and equipment
3.5
Proceeds from borrowings
-
-
3.6
Repayment of borrowings
-
-
3.7
Transaction costs related to loans and
borrowings
-
-
3.8
Dividends paid
-
-
3.9
Principle payments of lease liability
(26)
(26)
3.10
Net cash from / (used in) financing activities
2,800
2,800
4.
Net increase / (decrease) in cash and cash
equivalents for the period
4.1
Cash and cash equivalents at beginning of
period
84,312
84,312
4.2
Net cash from / (used in) operating activities
(item 1.9 above)
(544)
(544)
4.3
Net cash from / (used in) investing activities
(item 2.6 above)
(15,122)
(15,122)
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
P a g e |2
Consolidated statement of cash flows
4.4
Net cash from / (used in) financing activities
(item 3.10 above)
4.5
Effect of movement in exchange rates on cash
held
4.6
Cash and cash equivalents at end of period
5.
Reconciliation of cash and cash
equivalents
Current quarter
$A’000
Year to date
2,800
2,800
-
-
71,446
71,446
Current quarter
$A’000
Previous quarter
$A’000
(3 months)
$A’000
at the end of the quarter (as shown in the
consolidated statement of cash flows) to the
related items in the accounts
5.1
Bank balances
35,022
69,149
5.2
Call deposits
36,424
15,163
5.3
Bank overdrafts
-
-
5.4
Other (provide details)
-
-
5.5
Cash and cash equivalents at end of quarter
(should equal item 4.6 above)
71,446
84,312
6.
Payments to directors of the entity and their associates
6.1
Aggregate amount of payments to related parties and their associates
included in item 1
539
6.2
Aggregate amount of payments to related parties and their associates
included in item 2
138
Current quarter
$A'000
Note: if any amounts are shown in items 6.1 or 6.2, your quarterly activity report must include a description of,
and an explanation for, such payments
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
P a g e |3
7.
Financing facilities available
Note: the term “facility’ includes all forms of financing
arrangements available to the entity.
Total facility amount at
quarter end
$A’000
Amount drawn at
quarter end
$A’000
Add notes as necessary for an understanding of the sources
of finance available to the entity.
7.1
Loan facilities
-
-
7.2
Credit standby arrangements
-
-
7.3
Other (Convertible loan)
-
-
7.4
Total financial facilities
-
-
7.5
Unused financial facilities available at quarter end
7.6
Include in the box below a description of each facility above, including the lender, interest rate,
maturity date and whether it is secured or unsecured. If any additional financing facilities have been
entered into or are proposed to be entered into after quarter end, include a note providing details
of those facilities as well.
-
NIL
$A’000
8.
Estimated cash available for future operating activities
8.1
Net cash from / (used in) operating activities (Item 1.9)
8.2
(Payments for exploration & evaluation classified as investing activities)
(item 2.1(d))
(14,073)
8.3
Total relevant outgoings (Item 8.1 + Item 8.2)
(14,617)
8.4
Cash and cash equivalents at quarter end (Item 4.6)
71,446
8.5
Unused finance facilities available at quarter end (Item 7.5)
8.6
Total available funding (Item 8.4 + Item 8.5)
8.7
Estimated quarters of funding available (Item 8.6 divided by Item 8.3)
(544)
71,446
4.89
Note: if the entity has reported positive relevant outgoings (ie a net cash inflow) in item 8.3, answer item 8.7 as
“N/A”. Otherwise, a figure for the estimated quarters of funding available must be included in item 8.7.
8.8
If Item 8.7 is less than 2 quarters, please provide answers to the following questions:
1.
Does the entity expect that it will continue to have the current level of net operating cash
flows for the time being and, if not, why not?
Answer: N/A
2.
Has the entity taken any steps, or does it propose to take any steps, to raise further cash to
fund its operations and, if so, what are those steps and how likely does it believe that they
will be successful?
Answer: N/A
3.
Does the entity expect to be able to continue its operations and to meet its business
objectives and, if so, on what basis?
Answer: N/A
Note: where item 8.7 is less than 2 quarters, all of questions 8.8.1, 8.8.2 and 8.8.3 above must be answered.
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
P a g e |4
Compliance statement
1
This statement has been prepared in accordance with accounting standards and policies which comply
with Listing Rule 19.11A.
2
This statement gives a true and fair view of the matters disclosed.
Date:
31 October 2023
[ Authorised for lodgement by James Croser, Managing Director]
Authorised by:
..........................................................................................................
Notes
1.
This quarterly cash flow report and the accompanying activity report provide a basis for informing the
market about the entity’s activities for the past quarter, how they have been financed and the effect this
has had on its cash position. An entity that wishes to disclose additional information over and above the
minimum required under the Listing Rules is encouraged to do so.
2.
If this quarterly cash flow report has been prepared in accordance with Australian Accounting Standards,
the definitions in, and provisions of, AASB 6: Exploration for and Evaluation of Mineral Resources and AASB
107: Statement of Cash Flows apply to this report. If this quarterly cash flow report has been prepared in
accordance with other accounting standards agreed by ASX pursuant to Listing Rule 19.11A, the
corresponding equivalent standards apply to this report.
3.
Dividends received may be classified either as cash flows from operating activities or cash flows from
investing activities, depending on the accounting policy of the entity.
4.
If this report has been authorised for release to the market by your board of directors, you can insert here:
“By the board”. If it has been authorised for release to the market by a committee of your board of
directors, you can insert here: “By the [name of board committee – eg Audit and Risk Committee]”. If it
has been authorised for release to the market by a disclosure committee, you can insert here: “By the
Disclosure Committee”.
5.
If this report has been authorised for release to the market by your board of directors and you wish to
hold yourself out as complying with recommendation 4.2 of the ASX Corporate Governance Council’s
Corporate Governance Principles and Recommendations, the board should have received a declaration
from its CEO and CFO that, in their opinion, the financial records of the entity have been properly
maintained, that this report complies with the appropriate accounting standards and gives a true and fair
view of the cash flows of the entity, and that their opinion has been formed on the basis of a sound system
of risk management and internal control which is operating effectively.
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
P a g e |5
Share your feedback
Discover