RIU Explorers Presentation
Released
Released
Announcement PDF
RIU FREMANTLE
CORPORATE PRESENTATION
FEBRUARY 2024
IMPORTANT NOTICES AND DISCLAIMER
Disclaimer
You must read the following notices before reading or making any use of this document or any
information contained in this document. By continuing to read, use or otherwise act on this document,
you agree to be bound by the following terms and conditions, including any modifications to them.
This presentation (Presentation) has been prepared by Delta Lithium Limited (ACN 107 244 039) (ASX:DLI)
(the Company or Delta).
Summary information
This Presentation contains summary information about the Company and its activities current as at the date of
release. The information in this Presentation is of a general nature and does not purport to be complete nor
does it contain all information which a prospective investor may require in evaluating a possible investment in
the Company or that would be required in a prospectus or product disclosure statement prepared in accordance
with the requirements of the Corporations Act. The historical information in this Presentation is, or is based on,
information that has been released to the ASX. This Presentation should be read in conjunction with the
Company's other periodic and continuous disclosure announcements lodged with the ASX, which are available
at www.asx.com.au. The information in this Presentation remains subject to change without notice.
Any market and industry data that may be used in connection with this Presentation may have been obtained
from research, surveys or studies conducted by third parties, including industry or general publications. None of
the Company, its representatives or advisers have independently verified that market or industry data provided
by third parties or industry or general publications.
Not an offer
This Presentation is not an offer or invitation to acquire securities or any other financial products and is not a
prospectus, product disclosure statement or other offering document under Australian law (and will not be
lodged with ASIC) or any other law. This Presentation is for information purposes only and is not an invitation or
offer of securities for subscription, purchase or sale in any jurisdiction. This Presentation is not and should not
be considered an offer or an invitation to acquire securities or any other financial products and does not and will
not form any part of any contract for the acquisition of securities.
Not financial product advice
This Presentation does not constitute financial product or investment advice or any recommendation to acquire
securities or accounting, legal or tax advice. It has been prepared without taking into account the objectives,
financial or tax situation or needs of individuals. Before making an investment decision, prospective investors
should consider the appropriateness of the information having regard to their own objectives, financial and tax
situation and needs and obtain legal and taxation advice appropriate to their jurisdiction. Delta is not licensed to
provide financial product advice in respect of the securities or any other financial products.
DELTA LITHIUM | CORPORATE UPDATE
Investment risk
An investment in securities is subject to investment and other known and unknown risks, some of which are
beyond the control of Delta including loss of income and principal invested. The Company does not guarantee
any particular rate of return or performance or any particular tax treatment.
Effect of rounding
A number of figures, amounts, percentages, estimates and calculations of value in this Presentation are subject
to the effect of rounding.
Past performance
Investors should note that past performance and any pro forma financial information given in this Presentation is
given for illustrative purposes only and should not be relied on as (and is not) an indication of Delta’s views on
its future financial performance or condition. Prospective investors should note that past performance, including
past share price performance, of Delta cannot be relied on as an indicator of (and provides no guidance as to)
future performance including future share price performance. The historical information in relation to Delta
included in this Presentation is, or is based on, information that has previously been released to the market.
Forward-looking Statements and aspirational targets
Some statements in this Presentation regarding estimates or future events are forward-looking statements. They
include indications of, and guidance on, future matters. Forward-looking statements include, but are not limited
to, statements preceded by words such as “planned”, “expected”, “projected”, “estimated”, “may”, “scheduled”,
“intends”, “anticipates”, “believes”, “potential”, “could”, “nominal”, “conceptual” and similar expressions. Forwardlooking statements, opinions and estimates included in this Presentation are based on assumptions and
contingencies which are subject to change without notice, as are statements about market and industry trends,
which are based on interpretations of current market conditions.
Forward-looking statements are provided as a general guide only and should not be relied on as a guarantee of
future performance. Forward-looking statements may be affected by a range of variables and risks that could
cause actual results to differ from anticipated results and may cause Delta’s actual performance and results
(and other forward-looking statements) to materially differ from any projections of future performance or results
expressed or implied by such forward-looking statements. Readers should not place undue reliance on such
forward-looking information. There can be no assurance that forward-looking statements will prove to be correct
This Presentation may include aspirational targets. These targets are based on management’s expectations and
beliefs concerning future events as of the time of the release of this Presentation. Targets are necessarily
subject to risks, uncertainties and other factors, some of which are outside the control of Delta that could cause
actual results to differ materially from such statements.
2
IMPORTANT NOTICES AND DISCLAIMER
Competent Person Statement
JORC and Listing Rules Compliance Statement
Information in this Presentation that relates to exploration results is based upon work undertaken by Mr. Charles
Hughes, a Competent Person who is a Member of the Australasian Institute of Mining and Metallurgy
(AUSIMM). Mr. Hughes has sufficient experience that is relevant to the style of mineralisation and type of
deposit under consideration and to the activity which he is undertaking to qualify as a ‘Competent Person’ as
defined in the 2012 Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources
and Ore Reserves’ (JORC Code). Mr. Hughes is an employee of Delta and consents to the inclusion in this
Presentation of the matters based on his information in the form and context in which it appears.
Past Exploration Results and Mineral Resource estimates reported in this Presentation have been previously
prepared and disclosed by Delta in accordance with the JORC Code. The information in this Presentation that
relates to:
•
exploration results are extracted from Delta's ASX announcements of:
a)
b)
c)
d)
e)
f)
g)
h)
i)
j)
•
19 October 2022 and entitled “Maiden Lithium Mineral Resource Estimate at Mt Ida“, and for which
the consent of the Competent Person, Mr Matthew Boyes, was obtained;
25 January 2023 entitled "Best intercept to date at Mt Ida Lithium Project", and for which the
consent of the Competent Person, Mr Charles Hughes, was obtained;
27 February 2023 entitled "Yinnetharra results confirm extensive near surface strike", and for which
the consent of the Competent Person, Mr Charles Hughes, was obtained;
3 April 2023 entitled "Scale of the Yinnetharra Project continues to grow", and for which the consent
of the Competent Person, Mr Charles Hughes, was obtained;
24 April 2023 entitled "NEW MT IDA DISCOVERY 90 METRES AT 0.95% Li2O", and for which the
consent of the Competent Person, Mr Charles Hughes, was obtained;
8 May 2023 entitled "Further shallow thick high-grade Lithium from Yinnetharra", and for which the
consent of the Competent Person, Mr Charles Hughes, was obtained;
8 August 2023 entitled "Drilling update for Mt Ida Lithium", and for which the consent of the
Competent Person, Mr Charles Hughes, was obtained;
21 August 2023 entitled “Excellent Yinnetharra Initial Metallurgical Results and Drilling Update” and
for which the consent of the Competent Person, Mr Charles Hughes, was obtained,
4 September 2023 entitled “High grade gold results offer complementary cashflow opportunity at Mt
Ida” and for which the consent of the Competent Person, Mr Charles Hughes, was obtained, and
10 November 2023 entitled “Yinnetharra and Mt Ida Exploration Update” and for which the consent
of the Competent Person, Mr Charles Hughes, was obtained.
announcement entitled “Mt Ida Lithium Project Mineral Resource Estimate upgrade” and the 11 October
2023 ASX announcement entitled “Mt Ida Maiden Gold Mineral Resource Estimate” and the 27 December
2023 ASX announcement entitled “Yinnetharra Lithium Project Maiden Mineral Resource Estimate” , and for
which the consent of the Competent Persons, Ms Susan Havlin and Dr Andrew Scogings was obtained.
The Company confirms that it is not aware of any new information or data that materially affects the information
included in these market announcements. The Company confirms that the form and content in which the
Competent Person’s findings are presented here have not been materially modified from the original market
announcements, and all material assumptions and technical parameters underpinning Mineral Resource
Estimates in the relevant market announcement continue to apply and have not materially changed. Refer to
www.deltalithium.com.au for details on past exploration results and Mineral Resource estimates.
JORC Code differs from reporting requirements in other countries
It is a requirement of the ASX Listing Rules that the reporting of ore reserves and mineral resources in Australia
comply with the JORC Code. Investors outside Australia should note that while ore reserve and mineral
resource estimates of the Company in this Presentation comply with the JORC Code, they may not comply with
the relevant guidelines in other countries and, in particular, do not comply with (i) National Instrument 43 101
(Standards of Disclosure for Mineral Projects) of the Canadian Securities Administrators or (ii) Item 1300 of
Regulation S-K, which governs disclosure of mineral reserves in registration statements filed with the US
Securities and Exchange Commission.
Information contained in this Presentation describing mineral deposits may not be comparable to similar
information made public by companies subject to the reporting and disclosure requirements of other countries.
You should not assume that quantities reported as “resources” in this Presentation will be converted to reserves
under the JORC Code or any other reporting regime or that Delta will be able to legally and economically extract
them.
mineral resource estimates are extracted from Delta's ASX announcements dated 19 October 2022 and
entitled “Maiden Lithium Mineral Resource Estimate at Mt Ida“, and for which the consents of the Competent
Persons, Ms Justine Tracey and Mrs Christine Standing, were obtained and the 3 October 2023 ASX
DELTA LITHIUM | CORPORATE UPDATE
3
CORPORATE OVERVIEW
CAPITAL STRUCTURE
SHARES ON ISSUE
711.8M
PERFORMANCE RIGHTS
6.5M
OPTIONS
24.9M
MARKET CAP
A$199.3M
CASH
A$116M1
41.9%
ABN: 67 107 244 39
ASX: DLI
1.8%
deltalithium.com.au
BOARD
MAJOR
SHAREHOLDERS
10.7%
10.5%
23.8%
11.3%
1. Cash Balance as at 31 December 2023
DELTA LITHIUM | CORPORATE UPDATE
4
BOARD OF DIRECTORS
BOARD OF DIRECTORS
Chris Ellison
James Croser
Steve Kovac
Non-Executive Chairman
Managing Director
Non-Executive Director
• 40+ years experience in the
Australian mining and
resources sector
• Founder of leading $11 billion
diversified resources company
Mineral Resources
• 25+ years operational,
technical and management
experience in the Australian
mining sector
• Engineering background
• Current CEO of Idemitsu
Australia
• 23+ years experience in the
mining sector
• Held Senior Management and
Executive level roles for the
past 14 years
Joshua Thurlow
Tim Manners
Nader El Sayed
Non-Executive Director
Non-Executive Director
Non-Executive Director
• 20+ years experience in mining
and resources across Asia
Pacific, Africa & North America
• Background in corporate
strategy, social responsibility,
business development and
growth and operations
leadership
• 25+ years experience in
corporate finance, accounting
and business development
functions in the resources
sector
• Held senior financial positions
in various sectors including
precious and base metals,
industrial minerals and bulk
commodities
• Current CEO of Multiplant
Holdings – a mining and civil
services provider
• Background in risk
management, corporate
governance, strategy and
finance
DELTA LITHIUM | CORPORATE UPDATE
5
RAPID DEVELOPMENT OF WA LITHIUM ASSETS
Our Team
Major Shareholders
Experienced resource professionals
with Life of Mine vision
Substantial investments by proven lithium
miners, multinationals and investors
Mt Ida
Phase 1 Mining Approved
Lithium MRE 14.6Mt @ 1.2% Li2O
Gold MRE 3.1Mt @ 4.1g/t Au
Yinnetharra
Lithium MRE 25.7Mt @ 1.0 % Li2O
Large ongoing exploration and resource
definition drilling programs
Dominant landholding
DELTA LITHIUM | CORPORATE UPDATE
Location
Two JORC Lithium Resources
Global 40.4Mt @ 1.1% Li2O
WA the Hard-rock Lithium Capital of the World
Upcoming Catalysts
Extensive on-going exploration
Mining and Metallurgy Studies Progressing
Yinnetharra regional growth
6
YINNETHARRA
LITHIUM PROJECT
DELTA LITHIUM | CORPORATE UPDATE
7
YINNETHARRA LITHIUM PROJECT
Discovery in the emerging Gascoyne
Province
Potential to prove significant scale and
grade and grow to a globally significant
project
50+ identified pegmatite outcroppings
Less than 5% of the tenement area
tested with drilling so far
Drilling currently focused at the Malinda
Prospect being the leading opportunity
Early-stage exploration project covering
over 1,350km2 including Lyons River
DELTA LITHIUM | CORPORATE UPDATE
8
YINNETHARRA –
MALINDA PROSPECT
Six well-defined pegmatites at Malinda
Mineralisation is present from surface to a depth of at least 350m
Two of these pegmatites have consistent mineralisation over 1.6km
and open
Exciting shallow and wide initial intercepts into M47 pegmatite:
• YNRD082: 43m @ 1.22% Li2O from 66m6
• YNEX004: 35.2m @ 1.00% Li2O from 5m3
• YDRD018 68.9m @ 1% Li2O from 127.9m 4
High grade thick intercepts from M36 pegmatite:
• YRRD118: 33m @ 1.9% Li2O from 218m7
• YRRD114: 19m @ 1.6% Li2O from 190m7
• YRRD120: 29m @ 1.5% Li2O from 205m8
Excellent intercepts from drilling so far into M1 pegmatite:
• YNRD005: 55.6m @ 1.12% Li2O from 94m9
• YNRD028: 17m @ 1.13% Li2O from 61m4
• YRRD011: 20m @ 1.29% Li2O from 28m5
• YDRD011: 47.3m @ 1.3% Li2O from 82.6m 10
Excellent early met results high-quality clean concentrate
3. Refer to ASX announcement 27 February 2023 “Yinnetharra results confirm extensive near surface strike”
4. Refer to ASX announcement 27 December 2023 “Yinnetharra Project Maiden Mineral Resource Estimate”
5. Refer to ASX announcement 8 May 2023 “Further shallow thick high-grade Lithium from Yinnetharra”
6. Refer to ASX announcement 14 June 2023 “More exciting lithium drill results at Yinnetharra and Mt Ida”
DELTA LITHIUM | CORPORATE UPDATE
7. Refer to ASX announcement 23 June 2023 “Stunning new drilling results from Yinnetharra”
8. Refer to ASX announcement 4 July 2023 “Further exceptional drilling results from Yinnetharra”
9. Refer to ASX announcement 20 January 2023 “Outstanding assays returned from initial Yinnetharra Lithium drill hole”
10. Refer to ASX announcement 10 November 2023 “Exploration Update – Yinnetharra and Mt Ida”
9
MAIDEN LITHIUM RESOURCE AT MALINDA
THE FIRST 12 MONTHS AT YINNETHARRA
Maiden JORC Lithium MRE at Malinda
25.7Mt @ 1.0% Li2O (at a 0.5% Li2O cut off)1
Resource
category
Yinnetharra
Measured
Indicated
Inferred
Total
Resource
Cut-off
grade
(Li2O%)
0.5
Li2O
Tonnes
Grade
(%
(Mt)
Li2O)
6.7
1.0
19.0
1.0
25.7
1.0
65
181
Ta2O5
Grade
(Ta2O5
ppm)
51
67
246
62
Li2O
(Kt)
115,000m of drilling, nearly 500 drillholes
25% of total resource is Indicated category
mainly in near-surface areas
Scoping Study at Malinda commencing
Targetted Metallurgical & Geotechnical test
work being drawn up
Mining Licence application at Malinda
underway
1. Refer to ASX announcement 27 December 2023 “Yinnetharra Lithium Project Maiden Mineral Resource Estimate”
DELTA LITHIUM | CORPORATE UPDATE
10
YINNETHARRA LITHIUM PROJECT
Upcoming Exploration Program
Significantly enhanced drilling program
+150,000m planned
Resource definition, step-out and regional
drilling
Regional field work including soil sampling and
mapping ongoing
Scheduled Heritage, flora and fauna surveys
Targeting first drilling at Jamesons in 1H2024
Target maiden MRE at Jamesons
DELTA LITHIUM | CORPORATE UPDATE
11
LYONS RIVER
PROJECT
Lithium Rights acquired from
Dalaroo Metals October 2023
Mapped pegmatite swarms and
lithium in soil anomalies up to
472 ppm Li2O
Land area 838 km2
Similar prospective granite
intrusives and sediment-mafic
lithologies to Yinnetharra
Greenfields exploration to
commence in 1Q2024
DELTA LITHIUM | CORPORATE UPDATE
has acquired
12
MT IDA LITHIUM
PROJECT
DELTA LITHIUM | CORPORATE UPDATE
13
MT IDA LITHIUM PROJECT
14.6Mt @ 1.2% Li2O1 paving the way for
commencement of mining
Drilling completed 1,000+ holes for 200,000m+
MRE recently increased the Indicated Resource
by 136%
Granted Mining Leases and Granted Mining
Approval Phase 1 ”Shovel Ready”
Potential near-term production
Target Life of Mine >10 years
Strategic geographical position
Maiden gold MRE 3.1 Mt @ 4.1g/t for 412,000oz
1 Refer to ASX Announcement 3 Oct 2023 “Mt Ida Lithium Project Mineral Resource Estimate upgrade“
DELTA LITHIUM | CORPORATE UPDATE
14
086 Lode Pit
MT IDA LITHIUM PROJECT
Upcoming Project Development
Mining Approval granted for Phase 1
Sister Sam/086 Lode open pit
Phase 2 Approval underway
Gold stopes (blue)
Completed RC and Diamond drilling
programs in Jan 2024
Continue mapping of tenure and
target generation
Investigate the inclusion of gold into
the conceptual mining plan
Review options to maximise the
value of gold resources
DELTA LITHIUM | CORPORATE UPDATE
15
MT IDA GOLD RESOURCE
Exploring the potential of a proven gold district
Includes high-grade shallow resources:
Baldock 086
0.24Mt @ 9g/t Au for 70koz2
Meteor North 140
0.6Mt @ 4.7g/t Au for 91koz2
50% of the gold in Indicated Resources
100% of the gold within granted Mining Leases
85% of the gold within areas subject to Mining Proposal
Large proportion is located adjacent to the lithium resources
SISTER SAM
086 LODES
CROSS SECTION
A – A’
2 Refer to ASX Announcement 11 Oct 2023 “Mt Ida Maiden Gold Mineral Resource Estimate”
DELTA LITHIUM | CORPORATE UPDATE
16
Premium Locations
Hardrock Lithium Capital of the World
Our Team
Results driven with proven hardrock lithium experience
Mt Ida
JORC 14.6 Mt @ 1.2% Li2O
Mining Approval granted
“WE ARE THE DIFFERENCE”
Yinnetharra
Maiden JORC resource 25.7Mt @ 1.0% Li2O
Tier one potential with <5% of the project explored so far
Major Shareholders
Proven hardrock lithium partners
Upcoming Catalysts
Exploration results & Mining Studies
Lithium resource updates
And gold…
DELTA LITHIUM | CORPORATE UPDATE
17
GROUP MINERAL RESOURCE ESTIMATES
Group Mineral Resource estimate - Lithium
Cut-off
Resource
category
Yinnetharra
Mt Ida
Li2O
Ta2O5
grade
Tonnes
Grade
Li2O
Grade
(Li2O%)
(Mt)
(% Li2O)
(Kt)
(Ta2O5 ppm)
Measured
-
-
-
-
Indicated
6.7
1.0
65
51
19.0
1.0
181
67
Total
Resource
25.7
1.0
246
62
Measured
-
-
-
-
Indicated
7.8
1.3
104
224
6.8
1.1
76
154
14.6
1.2
180
191
Total Measured
-
-
-
-
Total Indicated
14.5
1.2
169
144
Total Inferred
25.8
1.0
257
90
Total
40.4
1.1
426
109
Inferred
Inferred
Total
Resource
0.5
0.5
Table 1:Mt Ida Gold Mineral Resource Estimate - Open pit.
Cut-off
Au g/t
0.5
Prospect
Classification
Western
Lodes
Kestrel
Indicated
Inferred
Inferred
Inferred
Total
Tonnes
Mt
0.52
0.30
0.57
0.86
1.38
Grade
Au g/t
6.6
3.7
1.6
2.3
3.9
Metal
Au koz
110
35
29
64
174
Table 2:Mt Ida Gold Mineral Resource Estimate - Underground.
Cut-off
Au g/t
1.5
Prospect
Classification
Western
Lodes
Kestrel
Indicated
Inferred
Inferred
Inferred
Total
Tonnes
Mt
0.60
0.89
0.22
1.11
1.71
Grade
Au g/t
5.0
4.5
1.9
4.0
4.3
Metal
Au koz
97
128
14
142
238
Notes:
Tonnages and grades have been rounded to reflect the relative uncertainty of the estimate.
Inconsistencies in the totals are due to rounding.
Refer to ASX announcement 27 December 2023 “Yinnetharra Lithium Project Maiden Mineral Resource Estimate”
DELTA LITHIUM | CORPORATE UPDATE
Refer to ASX Announcement 11 Oct 2023 “Mt Ida Maiden Gold Mineral Resource Estimate”
18
Share your feedback
Discover