Yinnetharra Exploration Update
Released
Released
Announcement PDF
ASX ANNOUNCEMENT
14 March 2024
Drilling update from Yinnetharra
Highlights:
•
The Yinnetharra Lithium Project is an early-stage exploration project that covers a large 1,769km2
area (including Farm-In’s) within the Gascoyne Lithium Province of Western Australia
o
•
Maiden Resource Estimate (MRE) of 25.7Mt @ 1% Li2O reported in December 20231
o
This MRE is located within a 1.6km section of the 80km strike length of Delta’s prospective
stratigraphy at the broader Yinnetharra Lithium Project.
o
Drilling at the next target area (Jameson) is scheduled to commence during the current
Quarter
New drilling results in this round of results include4:
Yinnetharra
o
30m @ 1.9% Li2O from 199m in YRRD0362 at M36
o
24.2m @ 1.4% Li2O from 177m in YDRD038 at M1
o
30m @ 1.43% Li2O from 183m in YRRD0361 at M36
o
43m @ 0.75% Li2O from 286m in YRRD0348 at M1
o
25m @ 1% Li2O from 35m in YRRD0336 at M1
Delta Lithium Limited (ASX: DLI) (“Delta” or the “Company”), is pleased to announce an update for the
ongoing drilling activities at its Lithium Project at Yinnetharra in the Gascoyne region of Western Australia.
Drilling at the Malinda Prospect continues to demonstrate quality lithium intercepts from surface with the
dominant lithium bearing mineral being spodumene. Recent highlights can be seen below in Table 1 and
Figure 2, with a full list of recent results in Appendix 1 and 2.
Commenting on the results Managing Director, James Croser said;
“Malinda continues to provide excellent results that highlight the enormous potential our geologists have
been talking about since the initial acquisition in late 2022. This confidence has only grown as each round
of drilling results have been incorporated into our geological model.
An initial heritage survey has been completed at Jamesons around the immediate locale of our first pass
drilling program. This is planned to commence in late March, drilling the high-value geochem anomalism
and LCT pegmatite outrcrop, and upon receipt of the POW which is imminent.”
Yinnetharra Exploration
The Yinnetharra project is an early-stage exploration project in the Gascoyne region of Western Australia
targeting Lithium mineralisation. Delta Lithium has 1,769km2 of tenure owned outright and as Farm-in Joint
Ventures. A maiden MRE was released in December 2024 of 25.7Mt @ 1% Li2O1. The recently executed
Farm-In Joint Venture Agreement have expanded the prospective stratigraphy to over 80km in length.
1.
Refer ASX Announcement 27 December 2023 titled ‘Yinnetharra Lithium Project Maiden Mineral Resource Estimate’
2.
3.
Refer ASX Announcement 3 October 2023 titled ‘Mt Ida Mineral Resource Estimate Update’
Refer to Appendix 1 for full drill hole information
ASX ANNOUNCEMENT
14 March 2024
Figure 1: Location of Yinnetharra Project
The Company is actively exploring at the Yinnetharra Project with four drill rigs currently operating at
Malinda and multiple field teams undertaking geological mapping and surface sampling in order to further
define target prospects.
Drilling completed to date at Malinda has demonstrated quality lithium intercepts from surface with the
dominant lithium bearing mineral being spodumene. Recent highlights can be seen below in Table 1 and
Figure 2, with a full list of recent results in Appendix 1 and 2.
HoleID
YRRD362
YRRD361
YDRD038
YRRD348
YRRD336
YDRD039
YRRD340
YRRD330
YRRD326
YRRD310
From
199
183
177
286
35
199
72
84
72
264
To
229
213
201
329
60
216
95
103
88
281
Length
30
30
24
43
25
17
23
19
16
17
Li2O pct Ta2O5 ppm
Fe2O3 pct
1.9
160
1.07
1.43
178
0.78
1.41
110
4.38
0.75
42
1.39
1.01
85
0.85
1.25
80
2.22
0.92
61
1.11
0.95
59
1.28
1.06
54
0.96
0.95
42
4.03
ASX ANNOUNCEMENT
14 March 2024
HoleID
YRRD332
YRRD353
YRRD392
YRRD334
From
54
225
38
38
To
74
240
53
50
Length
20
15
15
12
Li2O pct Ta2O5 ppm
Fe2O3 pct
0.7
60
1.28
0.86
90
2.42
0.82
54
0.55
0.95
66
1.70
Table 1: Highlight of recent drilling results from Yinnetharra
Lithium resources are largely present in 3 main pegmatites at Malinda from surface to a depth of >300m.
Metallurgical test work is ongoing with initial results demonstrating the potential for high recovery of
spodumene to high grade concentrates2.
Figure 2: Plan showing block models with selected recent intercepts
Exploration is ongoing at Yinnetharra with additional groundwork commencing within the recently acquired
RR1 and VSR tenements.
Drilling at the Jamesons Prospect (Figure 3) is scheduled to start this quarter utilising an RC rig, accessed
and supported from the Malinda Camp. The Jamesons Prospect has very consistent high tenor lithium in
soil anomalies with rock chips up to 4% Li2O and coarse spodumene within outcropping pegmatites at
surface. The area has been mapped extensively in preparation for the upcoming drill program.
ASX ANNOUNCEMENT
14 March 2024
Figure 3: Plan showing Jamesons Prospect with drill locations
Release authorised by the Managing Director on behalf of the Board of Delta Lithium Limited.
For further information, please contact:
Delta Lithium
James Croser, Managing Director
Peter Gilford, CFO & Company Secretary
+61 8 6109 0104
info@deltalithium.com.au
Investor/Media Enquiries
Citadel-MAGNUS
Michael Weir +61 402 347 032
Jono van Hazel +61 411 564 969
ASX ANNOUNCEMENT
14 March 2024
About Delta Lithium
Delta Lithium (ASX: DLI) is an exploration and development company focused on bringing high-quality, lithium-bearing pegmatite deposits, located
in Western Australia, into production. With current global JORC compliant resources of 40.4Mt@1.1%Li2O, strong balance sheet and an
experienced team driving the exploration and development workstreams, Delta Lithium is rapidly advancing its Lithium Projects. The Mt Ida Lithium
Project holds a critical advantage over other lithium developers with existing Mining Leases and an approved Mining Proposal. Delta Lithium is
pursuing a development pathway to unlock maximum value for shareholders.
Delta Lithium also holds the highly prospective Yinnetharra Lithium Project that is already showing signs of becoming one of Australia’s most
exciting lithium regions. The Company has recommenced exploration activities at Yinnetharra in the new calendar year, and an extensive multi-rig
campaign will be ongoing throughout 2024 to test additional targets and build on the Maiden Resource released in December 2023.
Competent Person's Statement
Information in this Announcement that relates to exploration results is based upon work undertaken by Mr. Charles Hughes, a Competent Person
who is a Member of the Australasian Institute of Mining and Metallurgy (AUSIMM). Mr. Hughes has sufficient experience that is relevant to the style
of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a ‘Competent Person’ as defined
in the 2012 Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’ (JORC Code). Mr. Hughes
is an employee of Delta Lithium Limited and consents to the inclusion in this announcement of the matters based on his information in the form and
context in which it appears.
Refer to www.deltalithium.com.au for past ASX announcements.
Past Exploration results and Mineral Resource Estimates reported in this announcement have been previously prepared and disclosed by Delta
Lithium in accordance with JORC 2012. The Company confirms that it is not aware of any new information or data that materially affects the
information included in these market announcements. The Company confirms that the form and content in which the Competent Person's findings
are presented here have not been materially modified from the original market announcement, and all material assumptions and technical
parameters underpinning Mineral Resource Estimates in the relevant market announcement continue to apply and have not materially changed.
Refer to www.deltalithium.com.au for details on past exploration results and Mineral Resource Estimates.
Disclaimer
This release may include forward-looking and aspirational statements. These statements are based on Delta Lithium management’s expectations
and beliefs concerning future events as of the time of the release of this announcement. Forward-looking and aspirational statements are necessarily
subject to risks, uncertainties and other factors, some of which are outside the control of Delta Lithium, which could cause actual results to differ
materially from such statements. Delta Lithium makes no undertaking to subsequently update or revise the forward looking or aspirational statements
made in this release to reflect events or circumstances after the date of this release, except as required by applicable laws and the ASX Listing
Refer to www.deltalithium.com.au for past ASX announcements.
ASX ANNOUNCEMENT
14 March 2024
Delta Lithium Group Mineral Resource estimate
Cut-off
Resource category
Mt Ida
Ta2O5
grade
Tonnes
Grade
Li2O
Grade
(Li2O%)
(Mt)
(% Li2O)
(Kt)
(Ta2O5 ppm)
-
-
-
-
6.7
1.0
65
51
19.0
1.0
181
67
Total Resource
25.7
1.0
246
62
Measured
-
-
-
-
7.8
1.3
104
224
6.8
1.1
76
154
14.6
1.2
180
191
Total Measured
-
-
-
-
Total Indicated
14.5
1.2
169
144
Total Inferred
25.8
1.0
257
90
Total
40.4
1.1
426
109
Measured
Yinnetharra
Li2O
Indicated
Inferred
Indicated
Inferred
Total Resource
0.5
0.5
Notes:
Tonnages and grades have been rounded to reflect
estimate. Inconsistencies in the totals are due to rounding.
the
relative
uncertainty
of
the
ASX ANNOUNCEMENT
14 March 2024
Appendix 1 Recent Drilling Information
HoleID
YDRD034
YDRD034
YDRD036
YDRD037
YDRD038
YDRD039
YDRD040
YDRD041
YDRD042
YRRD302
YRRD304
YRRD306
YRRD308
YRRD310
YRRD310
YRRD312
YRRD314
YRRD315
YRRD316
YRRD320
YRRD320
YRRD321
YRRD322
YRRD323
YRRD325
YRRD325
YRRD325
YRRD326
YRRD327
YRRD328
YRRD329
YRRD330
YRRD330
YRRD331
YRRD332
YRRD333
YRRD333
YRRD334
YRRD335
YRRD336
YRRD337
YRRD338
YRRD339
YRRD340
YRRD341
From
To
Length
Li2O pct Ta2O5 ppm Fe2O3 pct
and
227.14
234.29
7.15
0.72
166
0.39
211.45
216.4
4.95
0.5
51
4.95
no significant results
no significant results
177.36
201.54
24.18
1.41
110
4.38
199
216.05
17.05
1.25
80
2.22
98.29
114.25
15.96
0.65
38
0.81
no significant results
no significant results
no significant results
no significant results
no significant results
244
252
8
1.08
53
1.72
264
281
17
0.95
42
4.03
and
320
325
5
1.24
38
0.75
no significant results
no significant results
no significant results
70
75
5
0.79
36
0.51
and
108
118
10
0.88
27
0.63
99
102
3
0.56
38
0.62
no significant results
no significant results
no significant results
and
133
149
16
0.44
83
0.83
0
8
8
0.43
39
2.26
and
123
126
3
0.68
63
0.94
72
88
16
1.06
54
0.96
162
167
5
0.55
80
0.77
no significant results
no significant results
84
103
19
0.95
59
1.28
and
108
118
10
0.33
6
8.55
no significant results
54
74
20
0.7
60
1.28
and
153
166
13
0.63
44
0.75
143
146
3
0.41
46
13.11
38
50
12
0.95
66
1.70
no significant results
35
60
25
1.01
85
0.85
no significant results
89
103
14
0.54
50
0.68
no significant results
72
95
23
0.92
61
1.11
no significant results
ASX ANNOUNCEMENT
14 March 2024
HoleID
YRRD342
YRRD343
YRRD344
YRRD345
YRRD346
YRRD347
YRRD348
YRRD349
YRRD350
YRRD351
YRRD352
YRRD353
YRRD354
YRRD355
YRRD356
YRRD357
YRRD358
YRRD358
YRRD359
YRRD360
YRRD361
YRRD362
YRRD363
YRRD364
YRRD365
YRRD366
YRRD367
YRRD368
YRRD368
YRRD369
YRRD370
YRRD371
YRRD372
YRRD373
YRRD374
YRRD374
YRRD375
YRRD376
YRRD377
YRRD378
YRRD379
YRRD380
YRRD381
YRRD382
YRRD383
YRRD384
From
To
Length
Li2O pct Ta2O5 ppm Fe2O3 pct
no significant results
no significant results
no significant results
no significant results
279
294
15
0.58
47
0.95
no significant results
286
329
43
0.75
42
1.39
no significant results
no significant results
no significant results
no significant results
225
240
15
0.86
90
2.42
294
302
8
0.59
51
1.16
no significant results
288
302
14
0.68
67
2.74
no significant results
and
318
321
3
0.55
82
1.79
309
312
3
0.54
62
1.56
no significant results
no significant results
183
213
30
1.43
178
0.78
199
229
30
1.9
160
1.07
239
242
3
0.73
151
1.14
no significant results
no significant results
and
240
229
no significant results
no significant results
no significant results
24
60
48
and
66
Assay not received
Assay not received
Assay not received
no significant results
45
74
not sampled
no significant results
Assay not received
253
233
13
4
0.51
0.46
77
118
9.42
0.71
29
63
52
69
5
3
4
3
1.1
0.56
0.95
0.97
80
186
166
86
0.81
0.99
1.20
0.78
60
15
0.4
86
7.95
85
11
0.76
130
3.84
ASX ANNOUNCEMENT
14 March 2024
HoleID
YRRD385
YRRD386
YRRD387
YRRD388
YRRD389
YRRD390
YRRD391
YRRD392
YRRD393
YRRD394
YRRD395
YRRD396
YRRD397
YRRD398
YRRD399
YRRD400
YRRD401
YRRD402
YRRD403
YRRD404
YRRD405
YRRD406
YRRD407
YRRD408
YRRD409
YRRD410
HOLEID
YDRD034
YDRD036
YDRD037
YDRD038
YDRD039
YDRD040
YDRD041
YDRD042
YRRD302
YRRD304
YRRD306
YRRD308
YRRD310
YRRD312
YRRD314
YRRD315
From
To
Length
Li2O pct Ta2O5 ppm Fe2O3 pct
Assay not received
Assay not received
not sampled
Assay not received
Assay not received
Assay not received
no significant results
Assay
not
received
38
53
15
0.82
54
0.55
not sampled
no significant results
no significant results
no significant results
71
74
3
0.8
31
7.54
Assay not received
Assay not received
Assay not received
Assay not received
Assay not received
Assay not received
Assay not received
Assay not received
Assay not received
Assay not received
Assay not received
Assay not received
201
217
16
0.36
108
5.40
DEPTH
279.66
321.76
246.54
264.4
243.7
150.78
192.41
237.8
210
240
270
312
360
180
54
90
EAST
426351.00
426371.00
426351.38
426271.00
426446
425671
425711
425951
427325
427325
427325
427325
427325
426525
426476
425831
NORTH
RL
AZIMUTH DIP
7289283.00 319.0
356.89
-60.01
7289243.00 318.0
11.24
-60.57
7289383.00 320.0
4.8
-63.94
7289347.00 324.0
0.38
-60.9
7289337 319.6
359.15
-59.75
7289410 324.3
1.03
-64.21
7289323 326.4
3.24
-61.5
7289323 326.6
0.24
-59.81
7288858
327
358.55
-55.92
7288818
329
358.96
-55.01
7288778
331
0.89
-54.09
7288738
331
353.88
-47.65
7288700
330
0
-55
7288707
317
357.93
-60.27
7288891
317
0.7
-59.92
7289463
327
357.99
-62.2
ASX ANNOUNCEMENT
14 March 2024
HOLEID
YRRD316
YRRD320
YRRD321
YRRD322
YRRD323
YRRD325
YRRD326
YRRD327
YRRD328
YRRD329
YRRD330
YRRD331
YRRD332
YRRD333
YRRD334
YRRD335
YRRD336
YRRD337
YRRD338
YRRD339
YRRD340
YRRD341
YRRD342
YRRD343
YRRD344
YRRD345
YRRD346
YRRD347
YRRD348
YRRD349
YRRD350
YRRD351
YRRD352
YRRD353
YRRD354
YRRD355
YRRD356
YRRD357
YRRD358
YRRD359
YRRD360
YRRD361
YRRD362
YRRD363
YRRD364
YRRD365
DEPTH
102
240
180
156
138
174
210
203
192
215
210
150
168
197
102
161
114
108
198
132
168
200
108
187
354
204
384
204
378
198
486
186
276
270
366
216
360
210
365
282
228
246
288
270
306
240
EAST
426481
426476
425871
426564
425871
425871
426564
425871
426564
425871
426827
425911
426853
425911
426890
425951
426872
425951
426844
425951
426883
426191
426954.67
426191
427005
426191
427243
426191
427325
426231.38
427310
426231
427399
426231.25
427325
426271
427400
426271
427485
426271
426391
426310.66
426381
426309.78
426431
426349.48
NORTH
7288819
7288731
7289463
7288907
7289423
7289383
7288827
7289343
7288787
7289303
7288876
7289403
7288910
7289343
7288943
7289503
7288931
7289443
7288870
7289403
7288884
7289443
7288916.13
7289403
7288578
7289363
7288690
7289263
7288668
7289402.66
7288540
7289442
7288789
7289263.62
7288668
7289443
7288697
7289403
7288700
7289263
7289383
7289324.84
7289303
7289240.74
7289243
7289383.79
RL
317
316
327
319
327
327.9
319.3
328.1
310
328.5
322
327.8
321.2
327.7
320.8
326.8
320.9
327.3
321.8
327.9
322
325.8
322
327.3
324
328.2
329
322.5
330
325.48
330
324
333
322.45
330
323.1
333
323.1
330
321
319
320.71
318.8
319.42
319
320.64
AZIMUTH DIP
2.83
-59.3
0.38
-60.96
358.35
-61.95
359.75
-61.08
358.62
-61.74
1.07
-63.14
357.08
-58.16
1.85
-60.43
0.4
-60.05
358.44
-66.33
341.74
-62.12
357.2
-60.99
350.67
-59.79
359.12
-60.46
345.65
-60.11
358.35
-61.26
10.28
-59.72
359.75
-60.95
0.43
-56.16
357.7
-60.13
0.25
-54.96
0.25
-59.95
14.17
-55.52
358.5
-59.53
358.18
-57.76
359.4
-58.99
359.59
-69.45
1.49
-59.25
357.95
-57.74
359.61
-68.79
1.6
-57.77
357.83
-65.81
5.59
-58.09
357.88
-65.19
358.31
-65.76
357.95
-65.04
359.62
-57.55
355.93
-63.83
359.7
-62.47
359.43
-62.79
1.99
-62.74
358.92
-65.71
5.51
-63.91
1.07
-63.76
3.79
-63.77
358.08
-63.28
ASX ANNOUNCEMENT
14 March 2024
HOLEID
YRRD366
YRRD367
YRRD368
YRRD369
YRRD370
YRRD371
YRRD372
YRRD373
YRRD374
YRRD375
YRRD376
YRRD377
YRRD378
YRRD379
YRRD380
YRRD381
YRRD382
YRRD383
YRRD384
YRRD385
YRRD386
YRRD387
YRRD388
YRRD389
YRRD390
YRRD391
YRRD392
YRRD393
YRRD394
YRRD395
YRRD396
YRRD397
YRRD398
YRRD399
YRRD400
YRRD401
YRRD402
YRRD403
YRRD404
YRRD405
YRRD406
YRRD407
YRRD408
YRRD409
YRRD410
DEPTH
354
300
288
210
100
100
82
88
106
100
112
184
222
106
172
140
28
232
238
232
154
40
161
298
401
367
89
77
89
107
119
95
89
125
137
155
185
191
209
251
35
293
215
233
252
EAST
426431
426345.81
426471
426391
425752.39
425757.82
425789.93
425796.29
425828.39
425829.21
425946.03
425950.87
425955.55
425989.37
425987.99
426029.67
426071.73
426036.85
426079.36
426117.25
426150.17
426196
426223.35
426239.3
427485
427485
425471.38
425511
425511
425511.38
425511.38
425569.76
425542
425545
425548.85
425631.39
426479
426476
426476
426551.38
426551
426561
426591
426591
426471
NORTH
7289183
7289240.54
7289283
7289423
7289858.04
7289903.74
7289863.15
7289898.15
7289861.95
7289888.45
7289778.48
7289851
7289879.49
7289775.33
7289821.29
7289778.08
7289785.01
7289855.27
7289859.23
7289819.5
7289761.74
7289774
7289748.75
7289813.82
7288660
7288620
7289382.66
7289482
7289442
7289402
7289362
7289465.96
7289442
7289402
7289362.7
7289393.48
7288673
7288620
7288590
7289342.66
7289303
7289303
7289375
7289363
7289323
RL
AZIMUTH DIP
318.5
7.12
-64.77
318.78
359.65
-64.03
321
4.98
-65.81
320
2.92
-63.68
321.19
186.54
-61.46
320.49
187.1
-60.88
321.44
205.83
-60.72
320.14
190.45
-60.19
321.36
169.2
-64.35
320.79
172.67
-64.78
325.24
188.98
-59.82
322.45
177.95
-60.24
321.99
180.37
-61.21
325.7
184.67
-60.42
323.36
181.26
-60.33
325.13
185.1
-60.46
324.95
185.95
-55.4
322.53
185.87
-59.52
322.38
181.77
-61.23
323.2
180.42
-60.21
323.76
183.21
-60.38
323.1
182.1
-61.99
323.43
180.81
-61.2
322.24
180.52
-65.95
330
3.36
-63.26
330
7.16
-64.22
323.22
359.96
-59.92
321
355.52
-60.16
322
356.26
-60.18
322.9
355.38
-60.08
323.6
358.56
-59.9
322.4
2.36
-69.6
322.2
20.29
-65.95
322.8
14.63
-67.68
323.45
13.8
-69.29
323.57
3.43
-65.22
317
0.69
-54.97
317
0.84
-64.36
317
1.18
-64.37
323.73
11.7
-64.78
324
12.88
-63.08
324
9.18
-63.16
323
0.98
-57.44
323
3.51
-60.99
321
9.65
-65.66
ASX ANNOUNCEMENT
14 March 2024
JORC Code, 2012 Edition
Table 1; Section 1: Sampling Techniques and Data Yinnetharra
Criteria
Explanation
Sampling
techniques
Nature and quality of sampling (e.g. cut
channels, random chips, or specific
specialised industry standard measurement
tools appropriate to the minerals under
investigation, such as down hole gamma
sondes, or handheld XRF instruments, etc).
These examples should not be taken as
limiting the broad meaning of sampling.
Include reference to measures taken to
ensure sample representivity and the
appropriate calibration of any measurement
tools or systems used. Aspects of the
determination of mineralisation that are
Material to the Public Report. In cases where
‘industry standard’ work has been done this
would be relatively simple (e.g. ‘reverse
circulation drilling was used to obtain 1 m
samples from which 3 kg was pulverised to
produce a 30 g charge for fire assay’). In
other cases more explanation may be
required, such as where there is coarse gold
that has inherent sampling problems. Unusual
commodities or mineralisation types (e.g.
submarine nodules) may warrant disclosure
of detailed information
Drilling techniques
Drill type (e.g. core, reverse circulation, openhole hammer, rotary air blast, auger, Bangka,
sonic, etc) and details (e.g. core diameter,
triple or standard tube, depth of diamond tails,
face-sampling bit or other type, whether core
is oriented and if so, by what method, etc).
Commentary
•
•
•
•
•
•
•
•
•
•
Diamond (DD) and reverse circulation (RC) drilling has
been carried out by DLI Metals at the Yinnetharra project
RC samples are collected from a static cone splitter
mounted directly below the cyclone on the rig
DD sampling is carried out to lithological/alteration
domains with lengths between 0.3-1.1m
Limited historic data has been supplied, reverse
circulation (RC) drilling and semi-quantative XRD analysis
have been completed at the Project. Historic drilling
referenced has been carried out by Segue Resources
and Electrostate (prior holder)
Historic sampling of RC drilling has been carried out via a
static cone splitter mounted beneath a cyclone return
system to produce a representative sample, or via scoop
These methods of sampling are considered to be
appropriate for this style of exploration
Diamond drilling is being carried out by DDH1 utilising a
Sandvik DE880 truck mounted multipurpose rig and is HQ
or NQ diameter. RC drilling is carried out by Precision
Exploration Drilling (PXD) using a Schramm 850 rig
Some RC precollars have been completed, diamond tails
are not yet completed on these holes
Historic RC drilling was completed using a T450 drill rig
with external booster and auxiliary air unit, or unspecified
methods utilising a 133mm face sampling bit
It is assumed industry standard drilling methods and
equipment were utilised for all drilling
ASX ANNOUNCEMENT
14 March 2024
Criteria
Explanation
Drill sample
recovery
Method of recording and assessing core and
chip sample recoveries and results assessed.
Measures taken to maximise sample recovery
and ensure representative nature of the
samples. Whether a relationship exists
between sample recovery and grade and
whether sample bias may have occurred due
to preferential loss/gain of fine/coarse
material.
Commentary
•
•
•
•
•
Logging
Whether core and chip samples have been
geologically and geotechnically logged to a
level of detail to support appropriate Mineral
Resource estimation, mining studies and
metallurgical studies. Whether logging is
qualitative or quantitative in nature. Core (or
costean, channel, etc) photography. The total
length and percentage of the relevant
intersections logged.
•
•
•
•
•
•
Sample condition is recorded for every RC drill metre
including noting the presence of water or minimal sample
return, inspections of rigs are carried out daily
Recovery on diamond core is recorded by measuring the
core metre by metre
Poor recoveries were occasionally encountered in near
surface drilling of the pegmatite due to the weathered
nature
Historic RC recoveries were visually estimated on the rig,
bulk reject sample from the splitter was retained on site in
green bags for use in weighing and calculating drill
recoveries at a later date if required
Sample weights were recorded by the laboratory
Quantitative and qualitative geological logging of
drillholes adheres to company policy and includes
lithology, mineralogy, alteration, veining and weathering
Diamond core and RC chip logging records lithology,
mineralogy, alteration, weathering, veining, RQD, SG and
structural data
All diamond drillholes and RC chip trays are
photographed in full
A complete quantitative and qualitative logging suite was
supplied for historic drilling including lithology, alteration,
mineralogy, veining and weathering
No historic chip photography has been supplied
Logging is of a level suitable to support Mineral resource
estimates and subsequent mining studies
ASX ANNOUNCEMENT
14 March 2024
Criteria
Explanation
Sub-sampling
techniques and
sample preparation
If core, whether cut or sawn and whether
quarter, half or all core taken.
If non-core, whether riffled, tube sampled,
rotary split, etc and whether sampled wet or
dry. For all sample types, the nature, quality
and appropriateness of the sample
preparation technique.
Quality control procedures adopted for all
sub-sampling stages to maximise
representivity of samples.
Measures taken to ensure that the sampling
is representative of the in situ material
collected, including for instance results for
field duplicate/second-half sampling. Whether
sample sizes are appropriate to the grain size
of the material being sampled.
Commentary
•
•
•
•
•
•
•
Quality of assay
data and laboratory
tests
The nature, quality and appropriateness of
the assaying and laboratory procedures used
and whether the technique is considered
partial or total. Nature of quality control
procedures adopted (e.g. standards, blanks,
duplicates, external laboratory checks) and
whether acceptable levels of accuracy (i.e.
lack of bias) and precision have been
established.
For geophysical tools, spectrometers,
handheld XRF instruments, etc, the
parameters used in determining the analysis
including instrument make and model,
reading times, calibrations factors applied and
their derivation, etc.
•
•
•
•
•
•
•
.
•
DD sampling is undertaken by lithological/alteration
domain to a maximum of 1.1m and a minimum of 0.3m.
Core is cut in half with one half sent to the lab and one
half retained in the core tray
Occasional wet RC samples are encountered, extra
cleaning of the splitter is carried out afterward
RC and core samples have been analysed for Li suite
elements by ALS Laboratories, Samples are crushed and
pulverised to 85% passing 75 microns for peroxide fusion
digest followed by ICPOES or ICPMS determination
Historic RC sampling methods included single metre
static cone split from the rig or via scoop from the green
bags, field duplicates were inserted at a rate of 1:20
within the pegmatite zones
Historic samples were recorded as being mostly dry
Historic samples were analysed by Nagrom or ALS
Laboratories where 3kg samples were crushed and
pulverised to 85% passing 75 microns for a sodium
peroxide fusion followed by ICP-MS determination for 25
elements.
Semi-Quantitative XRD analysis was carried out by
Microanalysis Australia using a representative subsample that was lightly ground such that 90% was
passing 20 µm to eliminate preferred orientation
Samples have been analysed by an external laboratory
utilising industry standard methods
The assay method utilised by ALS for core sampling
allows for total dissolution of the sample where required
Standards and blanks are inserted at a rate of 1 in 20 in
RC and DD sampling, all QAQC analyses were within
tolerance
The sodium peroxide fusion used for historic assaying is
a total digest method
All historic samples are assumed to have been prepared
and assayed by industry standard techniques and
methods
In the historic data field duplicates, certified reference
materials (CRMs) and blanks were inserted into the
sampling sequence at a rate of 1:20 within the pegmatite
zone
Internal standards, duplicates and repeats were carried
out by Nagrom and ALS as part of the assay process
No standards were used in the XRD process
ASX ANNOUNCEMENT
14 March 2024
Criteria
Explanation
Verification of
sampling and
assaying
The verification of significant intersections by
either independent or alternative company
personnel. The use of twinned holes.
Documentation of primary data, data entry
procedures, data verification, data storage
(physical and electronic) protocols. Discuss
any adjustment to assay data
Commentary
•
•
•
•
•
Location of data
points
Accuracy and quality of surveys used to
locate drill holes (collar and down-hole
surveys), trenches, mine workings and other
locations used in Mineral Resource
estimation. Specification of the grid system
used. Quality and adequacy of topographic
control
•
•
•
•
•
Data spacing and
distribution
Orientation of data
in relation to
geological structure
Sample security
Data spacing for reporting of Exploration
Results. Whether the data spacing and
distribution is sufficient to establish the
degree of geological and grade continuity
appropriate for the Mineral Resource and Ore
Reserve estimation procedure(s) and
classifications applied. Whether sample
compositing has been applied.
Whether the orientation of sampling achieves
unbiased sampling of possible structures and
the extent to which this is known, considering
the deposit type. If the relationship between
the drilling orientation and the orientation of
key mineralised structures is considered to
have introduced a sampling bias, this should
be assessed and reported if material
•
•
•
Drill holes were orientated to intersect the pegmatite
zones as close to perpendicular as possible; drill hole
orientation is not considered to have introduced any bias
to sampling techniques utilised as true orientation of the
pegmatites is yet to be determined
The measures taken to ensure sample
security
•
Samples are prepared onsite under supervision of DLI
Metals staff and transported by a third party directly to the
laboratory
Historic samples were collected, stored, and delivered to
the laboratory by company personnel
•
•
Audits or reviews
Significant intercepts have been reviewed by senior
personnel
Some holes in the current diamond program have been
designed to twin historic RC drillholes and verify
mineralised intercepts
Primary data is collected via excel templates and thirdparty logging software with inbuilt validation functions, the
data is forwarded to the Database administrator for entry
into a secure SQL database
Historic data was recorded in logbooks or spreadsheets
before transfer into a geological database
No adjustments to assay data have been made other
than conversion from Li to Li2O and Ta to Ta2O5
Drill collars are located using a handheld GPS unit, all
holes will be surveyed by third party contractor once the
program is complete
GDA94 MGA zone 50 grid coordinate system was used
Downhole surveys were completed by DDH1 and PXD
using a multishot tool
Historic collars were located using handheld Garmin GPS
u
Share your feedback
Discover