Mt Ida Gold Project Exploration & Permitting Update
Highlights:
•
Additional results from current extensional and regional drill campaign, significant intercepts include;
o
1m @ 64 g/t Au from 45m in JPEX008 at Jupiter
o
3m @ 7.9g/t Au from 148m in BYRD027 at Bombay
o
6m @ 4.4g/t Au from 74m in WKEX034 at West Knell
o
1.54m @ 37.3g/t Au from 367.91m in IDRD325 at Baldock
o
5m @ 5.8g/t Au from 67m in WKEX025 at West Knell
o
2m @ 4.1g/t Au from 56m in WKEX039 at West Knell
•
Drilling of the 4-stage program1 has progressed well with two rigs expected to complete work in
coming weeks
•
The Company aims to update the Mt Ida Gold Project Mineral Resource Estimate 2 (MRE) of
752koz@3.5g/t in the June Quarter
•
Works Approval application submitted to the Department of Water and Environmental Regulation
(DWER) for the construction of up to a 1.5Mtpa gold Processing Plant and Tailings Storage Facility
(TSF)
•
Works Approval application is the key approval instrument for constructing a Processing Plant
and TSF
•
Mt Ida is currently fully permitted for open pit and underground mining with an approved Mining
Proposal, Mine Closure Plan and water abstraction license
•
Launch of interactive InvestorHub https://investors.deltalithium.com.au/
Delta Lithium Limited (ASX: DLI) (“Delta” or the “Company”) is pleased to provide an update for the
ongoing exploration and development activities at its 100% owned Mt Ida Gold Project in WA’s Eastern
Goldfields region. The 4-stage extensional drill program has continued to deliver strong results and have
confirmed more gold across the broader tenure of Mt Ida.
Importantly, the Company is progressing concurrent workstreams to accelerate Mt Ida’s development
including the submission of a Works Approval application to the Department of Water and Environmental
Regulation to construct a gold Processing Plant and Tailings Storage Facility with the potential capacity of
processing and tailings deposition of up to 1.5Mtpa.
1 Refer ASX Announcement 27 August 2024 titled ‘Delta continues to advance Mt Ida Gold Project’
2 Refer ASX Announcement 28 June 2024 titled ‘Major Upgrade to Mt Ida Gold Resource’
ASX ANNOUNCEMENT
26 March 2025
Commenting on the Mt Ida Project Update Managing Director, James Croser said;
“These continued high-grade extensional results bode well for the planned gold MRE update, with Delta
aiming to grow substantially upon our current 752,000 oz MRE at Mt Ida. The Company continues to search
for the edges of mineralisation at Baldock and test our regional prospects, with numerous exploration targets
already identified for future drill programs. The first assays back to Delta from the Bombay-West KnellJupiter prospects have confirmed more gold across a wider expanse of our regional tenure, with assays still
pending for 26 holes in the lab.
The recently submitted Works Approval application for onsite gold treatment is a critical step for Delta, being
the only outstanding permit required for Delta to construct a gold plant and TSF at Mt Ida, and is the
culmination of many hours of diligent work by Delta staff.
The broader gold landscape remains extremely strong with the spot price reaching record highs in recent
months. Delta’s longer-term strategy remains the continued advancement of the Mt Ida Gold Project
towards genuine standalone scale.”
Mt Ida Exploration Update
Mt Ida is located 100km northwest of
Menzies, and approximately 225km by road
from Kalgoorlie in Western Australia. The
Project area resides on granted mining leases
and is fully permitted for commencement of
open pit and underground mining at Baldock.
Two drill rigs are currently operating at the
project, focussed on resource extensions and
resource growth with a target to grow the
current 752,000oz @ 3.5g/t gold Mineral
Resource Estimate, including the high grade
Baldock deposit of 4.8Mt @ 4.4g/t gold for
674,000oz.
Delta’s recent exploration results are very
promising and provide further confirmation of
historical tenor and potential of the broader Mt
Ida Gold Project. Additional Intercepts at
Baldock continue to deliver exceptional
extensions to deep high-grade resources
including the delineation of an additional enechelon lode in the footwall of the lode 90
which hosts 504kt @ 6.9g/t Au for 112kOz1
– See Figure 2.This new lode is completely
open to the South and will add to the current
resource base at Baldock of 674kOz @ 4.4
g/t Au, which acts as the baseload of the Mt
Ida Gold Project.
Figure 1: Overview showing DLI Projects & Resources
2
ASX ANNOUNCEMENT
26 March 2025
Figure 2: Cross- section showing Baldock deep lodes beyond the current MRE and new high-grade structure that remains open to the South.
(Refer to white dashed line in Figure 3 for location of cross section)
The Company believes this newly identified footwall lode beneath lode 90 presents a compelling exploration
target and will be further tested by future drilling.
Previously released results from the extensional Baldock drilling include the following significant intercepts
as shown in Table 1. See Figure 3 for illustration of these recent intercepts in relation to the current Mineral
Resource Estimate at Baldock.
HoleID
IDRD309
IDRD310
IDRD329
IDRD321
IDRD327
IDRD330
IDRD333
IDRD352
IDRD362A
IDRD364
IDRD368
IDRD373
From
83
197
325.92
38
308
140
410.5
31
38
283
17
240
To
85
198
326.42
43
309
141
411.72
33
40
286
24
242
Length
2
1
0.5
5
1
1
1.22
2
2
3
7
2
Au g/t
9.3
6.5
13.42
4.7
8.8
9.3
10.1
4.1
4.92
18.18
2.92
4.08
Cu_ppm
1966
555
2390
1615
466
186
4604
1714
91
2265
892
116
3
ASX ANNOUNCEMENT
26 March 2025
HoleID
IDRD384
IDRD387
IDRD389
IDRD390
From
244
177
91
128
To
Length
245
180
97
129
1
3
6
1
Au g/t
5.84
3.25
13.4
7.1
Cu_ppm
44
1142
119
906
Table 1: Highlights of recent drill intercepts at Mt Ida from Baldock during the current program
Figure 3: Plan view showing Stage 1 -3 Intercepts around the Baldock area and Jupiter to the Northwest.
4
ASX ANNOUNCEMENT
26 March 2025
Stage 4 Regional Drilling
Initial assay results from the Company’s priority regional prospects including Bombay, West Knell and
Jupiter have been extremely promising with high grade intercepts being reported from each prospect – see
Table 2 and Figure 4 below.
HoleID
BYRD027
JPEX008
WKEX025
WKEX034
WKEX039
WKEX040
Prospect
Bombay
Jupiter
West Knell
West Knell
West Knell
West Knell
From
To
148
45
67
74
56
150
Length
151
46
72
80
58
157
Au g/t
3
1
5
6
2
7
7.9
64
5.76
4.41
4.07
2.01
Cu_ppm
795
341
529
Table 2: Highlights of recent regional drill intercepts at Mt Ida from Stage 4 drilling
3352
3386
Figure 4: Plan view of regional prospects in relation to Baldock with some recent significant Intercepts
Delta’s first drilling at West Knell has provided some excellent high-grade intercepts proving up local
continuity from a historical interval of 5m @ 72g/t from 50.5m – see Figure 5.
All exploration results will feed into the updated Mineral Resource Estimate scheduled to be completed in
the June Quarter, which is planned to be followed by an infill resource conversion campaign. There are still
5
ASX ANNOUNCEMENT
26 March 2025
more than 26 holes undergoing testing in the lab while further drilling at the Saturn and Unexpected
prospects will be commencing in the next week with the aim to further grow the Mt Ida regional resources.
Figure 5: 200m wide West Knell section facing West showing previous and recent significant intercepts
(historic drillhole information can be found in Appendix 3)
Works Approval
Delta has submitted a Works Approval application for onsite gold treatment and tailings deposition, being
the only outstanding permit required for Delta to construct a gold plant and TSF at Mt Ida.
The Works Approval application process may take up to six months. The timing of this submission and
approval process aligns with ongoing workflows at Mt Ida, which are currently focused on completion of the
current resource growth drilling and an updated MRE early in the June Quarter.
Next Steps
Stage 4 of the extensional drilling campaign at the Mt Ida project will be completed early in the June Quarter.
Outstanding assay results of the completed program, and indeed all results combined from the 4-stage
extensional program will form the basis of an updated Gold Mineral Resource Estimate. The Company will
look to release this update early in the upcoming June quarter.
6
ASX ANNOUNCEMENT
26 March 2025
Future planning for Mt Ida includes the commencement of infill drilling, at Baldock in particular, and at
sufficient density to underpin a multi-year Mining Plan and maiden Reserve statement. This planned infill
drilling program will target the conversion of remaining inferred material up to 250m depth at Baldock to
Indicated status, as well as geotechnical and metallurgical data collection to support a full Feasibility Study,
inclusive of an onsite processing scenario for all potential ore production.
Investor Hub
Delta Lithium is pleased to advise that it has have partnered with InvestorHub, a direct-to-investor
engagement software company that provides public companies the digital capabilities to build direct and
interactive relationships with investors.
In line with the Company’s commitments to better inform and engage with investors and stakeholders, Delta
has launched its interactive investor hub - bringing content and communication into a single integrated
platform. The Company will also be regularly uploading new content via the hub, including videos
accompanying select announcements, educational material, interviews, and corporate research.
Managing Director, James Croser, commented:
“InvestorHub provides our shareholders with the opportunity to engage more closely with the Company on
all matters regarding our public business, from ASX announcements, discussions on topics relevant to our
activities, to everyday goings-on at our projects. Please register your interest and sign up for a more
personal
shareholder
experience.
We
look
forward
to
seeing
you
there!”
https://investors.deltalithium.com.au/”
Release authorised by the Managing Director on behalf of the Board of Delta Lithium Limited.
For further information, please contact:
Delta Lithium
James Croser, Managing Director
Peter Gilford, CFO & Company Secretary
+61 8 6109 0104
info@deltalithium.com.au
Investor/Media Enquiries
Sodali & Co
Michael Weir +61 402 347 032
7
ASX ANNOUNCEMENT
26 March 2025
About Delta Lithium
Delta Lithium (ASX: DLI) is an exploration and development company focused on bringing high-quality, lithium-bearing pegmatite deposits, located
in Western Australia, into production. With current global JORC compliant resources of 40.4Mt@1.1%Li2O, strong balance sheet and an
experienced team driving the exploration and development workstreams, Delta Lithium is rapidly advancing its Projects.
The Mt Ida Project has coincident gold and lithium orebodies and holds a critical advantage over other developers with existing Mining Leases and
an approved Mining Proposal. Delta Lithium is pursuing a development pathway to unlock maximum value for shareholders. Delta is currently drilling
to extend the high-grade gold resources at Mt Ida.
Delta Lithium also holds the highly prospective Yinnetharra Lithium Project, with exciting lithium discoveries at the Malinda and Jamesons prospects.
The Company is currently conducting exploration activities at Yinnetharra with fieldwork commenced for 2025 across our large tenure package,
testing additional targets and building on the Maiden Resource at Malinda.
Competent Person's Statement
Information in this Announcement that relates to exploration results is based upon work undertaken by Mr. Shane Murray, a Competent Person
who is a Member of the Australasian Institute of Geoscientists (AIG). Mr. Murray has sufficient experience that is relevant to the style of
mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a ‘Competent Person’ as defined in
the 2012 Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’ (JORC Code). Mr. Murray
is an employee of Delta Lithium Limited and consents to the inclusion in this announcement of the matters based on his information in the form and
context in which it appears.
Refer to www.deltalithium.com.au for past ASX announcements.
Past Exploration results and Mineral Resource Estimates reported in this announcement have been previously prepared and disclosed by Delta
Lithium in accordance with JORC 2012. The Company confirms that it is not aware of any new information or data that materially affects the
information included in these market announcements. The Company confirms that the form and content in which the Competent Person's findings
are presented here have not been materially modified from the original market announcement, and all material assumptions and technical
parameters underpinning Mineral Resource Estimates in the relevant market announcement continue to apply and have not materially changed.
Refer to www.deltalithium.com.au for details on past exploration results and Mineral Resource Estimates.
Disclaimer
This release may include forward-looking and aspirational statements. These statements are based on Delta Lithium management’s expectations
and beliefs concerning future events as of the time of the release of this announcement. Forward-looking and aspirational statements are necessarily
subject to risks, uncertainties and other factors, some of which are outside the control of Delta Lithium, which could cause actual results to differ
materially from such statements. Delta Lithium makes no undertaking to subsequently update or revise the forward looking or aspirational statements
made in this release to reflect events or circumstances after the date of this release, except as required by applicable laws and the ASX Listing
Refer to www.deltalithium.com.au for past ASX announcements.
8
ASX ANNOUNCEMENT
26 March 2025
Appendix 1 Mt Ida Gold MRE summary table
Indicated
Cut off
Deposit
Inferred
Total
Tonnes
Grade
Ounces
Tonnes
Grade
Ounces
Tonnes
Grade
Ounces
(000s)
g/t Au
(000s)
(000s)
g/t Au
(000s)
(000s)
g/t Au
(000s)
Baldock
1,345
4.9
209.0
1,512
3.2
158
2,857
4.0
367
Open Pit Au
0.5 g/t
Kestrel
-
-
-
570
1.6
29
570
1.6
29
Golden Vale
-
-
-
496
1.7
27
496
1.7
27
0.0 g/t Au
Cut off
Mt Ida Tailings
-
-
-
500
0.5
8
500
0.5
8
Baldock
180
5.8
33.0
1,780
4.8
274
1,960
4.9
307
Kestrel
-
-
-
220
1.9
14
220
1.9
14
Golden Vale
-
-
-
-
-
-
-
-
-
500
0.5
8
500
0.5
8
Underground
1.5 g/t Au
Mt Ida Tailings
All
Baldock
1,525
4.9
242.0
3,292
4.1
432
4,817
4.4
674
Kestrel
-
-
-
790
1.7
43
790
1.7
43
Golden Vale
-
-
-
496
1.7
27
496
1.7
27
1,525
4.9
242.0
5,078
3.1
510
6,603
3.5
752
Total
Appendix 2 Recent Drilling Information
New Significant Results
HoleID
IDRD325
and
and
and
and
and
IDRD336
IDRD356
IDRD356W1
IDRD381
IDRD382
IDRD383
IDRD384
IDRD395
IDRD396
To
366.55
369.45
394.43
402
435.05
438.48
Length
0.81
1.54
1.12
1.05
1.05
0.48
Au g/t Cu_ppm
0.84
566
37.26
2176
2.52
1020
2.55
2148
5.14
420
0.55
155
Comments
tail outstanding
and
and
IDRD358
IDRD360
From
365.74
367.91
393.31
400.95
434
438
432
527.76
542.2
724.36
434
528.23
543
724.9
2
0.47
0.8
0.54
0.84
0.53
1.45
3.54
125
13
50
2360
252.16
289.25
253.04
292
0.88
2.75
1.53
1.99
2290
257
tail outstanding
tail outstanding
208
209
and
265.57
270.12
21
22
and
118
119
and
212.63
213.93
and
233.42
234.03
244
245
no significant results
no significant results
1
4.55
1
1
1.3
0.61
1
3.32
1.35
0.52
2.51
0.68
2.45
5.84
1950
1605
342
679
342
2800
44
tail outstanding
tail outstanding
9
ASX ANNOUNCEMENT
26 March 2025
HoleID
IDRD397
IDRD398
IDRD399
IDRD400
IDRD401
IDRD402
IDRD403
IDRD404
IDRD405
BYRD008
BYRD009
BYRD010
BYRD011
BYRD012
BYRD013
BYRD014
BYRD015
BYRD016
BYRD017
BYRD018
BYRD019
BYRD020
BYRD021
BYRD022
BYRD023
BYRD024
BYRD025
BYRD026
BYRD027
BYRD028
BYRD029
BYRD030
JPEX002
JPEX003
JPEX004
From
To
no significant results
no significant results
no significant results
no significant results
no significant results
no significant results
94
95
113
114
no significant results
no significant results
20
21
and
23
24
and
32
34
53
54
and
62
63
and
115
116
no significant results
no significant results
no significant results
no significant results
69
78
38
47
and
85
86
31
32
and
35
36
143
144
91
100
and
123
124
and
130
131
and
137
138
no significant results
72
73
no significant results
no significant results
no significant results
no significant results
no significant results
148
151
30
31
and
51
62
7
8
no significant results
31
32
Length
Au g/t
Cu_ppm
Comments
1
1
0.52
1.96
325 tail outstanding
72 tail outstanding
1
1
2
1
1
1
0.59
0.73
1.32
0.55
0.9
0.77
158
278
459
54
83
231
9
9
1
1
1
1
9
1
1
1
0.76
0.84
0.5
0.63
0.78
2.64
0.72
1.39
0.72
0.59
214
345
112
348
327
518
572
139
77
243
1
1.33
145
3
1
11
1
7.94
0.74
0.64
1.08
795
221
158
68
1
0.61
170
Assays Pending
Assays Pending
10
ASX ANNOUNCEMENT
26 March 2025
HoleID
JPEX005
JPEX006
JPEX007
JPEX008
JPEX009
JPEX010
JPEX011
JPEX012
JPEX013
JPEX014
JPEX015
JPEX016
SARD001
SARD002
SARD003
SARD004
SARD005
SARD006
SARD007
WKEX020
From
56
no significant results
45
199
WKEX021
WKEX022
and
WKEX023
and
and
WKEX024
WKEX025
and
WKEX032
WKEX033
WKEX034
WKEX035
WKEX036
Length
Au g/t
57
1
0.95
46
200
1
1
63.99
1.17
Cu_ppm
Comments
Assays Pending
Assays Pending
Assays Pending
Assays Pending
Assays Pending
Assays Pending
Assays Pending
Assays Pending
Assays Pending
Assays Pending
Assays Pending
Assays Pending
Assays Pending
Assays Pending
Assays Pending
and
and
and
WKEX026
WKEX027
WKEX028
WKEX029
WKEX030
WKEX031
To
20
33
44
86
40
17
62
96
101
116
67
61
67
21
35
45
87
41
27
67
97
102
117
68
63
72
1
2
1
1
1
10
5
1
1
1
1
2
5
1.24
0.56
0.7
3.07
0.66
0.95
0.57
0.59
0.62
0.79
0.6
0.89
5.76
474
669
3240
183
230
503
134
1605
807
1540
485
228
529
Assays Pending
Assays Pending
no significant results
no significant results
no significant results
49
and
52
35
27
and
89
74
51
56
36
28
91
80
2
4
1
1
2
6
0.56
0.72
0.82
0.72
0.64
4.41
Assays Pending
Assays Pending
11
ASX ANNOUNCEMENT
26 March 2025
HoleID
WKEX037
WKEX038
WKEX039
WKEX040
From
and
56
93
150
To
Length
Au g/t
2
1
7
4.07
0.9
2.01
58
94
157
Cu_ppm
WKEX041
WKEX042
Comments
Assays Pending
Assays Pending
Assays Pending
Assays Pending
New collar information for results received
HoleID
IDRD325
IDRD336
IDRD356
IDRD356W1
IDRD358
IDRD360
IDRD381
IDRD382
IDRD383
IDRD384
IDRD395
IDRD396
IDRD397
IDRD398
IDRD399
IDRD400
IDRD401
IDRD402
IDRD403
IDRD404
IDRD405
BYRD008
BYRD009
BYRD010
BYRD011
BYRD012
BYRD013
BYRD014
BYRD015
BYRD016
BYRD017
BYRD018
BYRD019
BYRD020
Depth
462
624.4
537.5
537.5
182
420.3
247.3
389.7
291.2
330
127
79
67
103
193
151
229
241
270
186
156
72
66
168
96
84
144
156
96
90
72
210
174
156
East
253419
253145.279
252797.344
252797.344
253118.387
252552
253475
252793
252900.98
252831.477
252717
252458.912
252433.161
252422.5
252356.043
252364.256
252329.382
252338.314
252759
253523
252423
248976
248938
248866
248966
249034
248821
248758
248748
248664
248601
248600
248664
248496
North
6778001
6778408
6778125
6778125
6777909
6779192
6778171
6778848
6778909
6778956
6778988
6779418
6779466
6779430
6779414
6779468
6779439
6779373
6778918
6777870
6779430
6783528
6783492
6783465
6783378
6783409
6783525
6783485
6783611
6783795
6783904
6783700
6783694
6783879
RL
476
472.82
479.42
479.42
477.382
469.554
481
472
470.057
469.918
472
467.947
467.666
467.976
468.311
468.079
468.497
468.873
472
484
468
449
450
451
450
450
451
452
450
447
448
448
448
449
Azi
55.56
56.57
56.3
56.3
54.19
60.59
60.73
63.06
52.08
59
60.2
60.94
59.96
46.4
58.15
64.36
67.61
65.65
61.65
58.72
59.23
60.91
59.7
61.36
59.22
61.21
62.41
59.81
61.2
59.47
60.02
62.81
61.61
61.3
Dip
-61.21
-78.52
-50.76
-50.76
-53.39
-57.6
-62.29
-56.43
-65.1
-57.92
-64.23
-60.46
-60.03
-54.7
-60.55
-60.02
-59.34
-61.04
-59.21
-66.43
-58.9
-60.25
-60.29
-60.32
-59.91
-60.44
-59.42
-60.38
-60.23
-60.74
-60.71
-60.33
-60.54
-60.71
12
ASX ANNOUNCEMENT
26 March 2025
HoleID
BYRD021
BYRD022
BYRD023
BYRD024
BYRD025
BYRD026
BYRD027
BYRD028
BYRD029
BYRD030
JPEX002
JPEX003
JPEX004
JPEX005
JPEX006
JPEX007
JPEX008
JPEX009
JPEX010
JPEX011
JPEX012
JPEX013
JPEX014
JPEX015
JPEX016
SARD001
SARD002
SARD003
SARD004
SARD005
SARD006
SARD007
WKEX020
WKEX021
WKEX022
WKEX023
WKEX024
WKEX025
WKEX026
WKEX027
WKEX028
WKEX029
WKEX030
WKEX031
WKEX032
Depth
90
162
222
180
127
198
212
150
78
277
108
108
180
187
108
108
186
204
114
186
144
246
150
210
114
120
60
96
132
120
102
126
114
132
72
174
102
90
198
210
48
108
96
96
114
East
248500
248437
248551.489
248910
248810
248709
248657
248804
248917
248767
251626
251610
251568
251596
251447
251489
251443
251409
251534
251483
251567
251528
251685
251629
251720
259447.219
259490.574
259537.274
259486
259547
259547
259372
256953.434
256993.186
256925.116
257049.863
257351.18
257355.03
257429.418
257434.651
256906
256970
257009
256964
256960
North
6783996
6783948
6783767
6783329
6783422
6783568
6783618
6783581
6783591
6783337
6779772
6779700
6779686
6779597
6780096
6779996
6779979
6780067
6779887
6779877
6779812
6779794
6779536
6779523
6779472
6773297
6773303
6773229
6773209
6773200
6773259
6773095
6783562
6783565
6783654
6783502
6783579
6783665
6783667
6783580
6783726
6783728
6783649
6783494
6783424
RL
448
448
448.08
450
451
451
449
451
449.81
451
470
469
468
469
465
467
466
465
470
468
468
468
470
470
471
479.231
477.395
476.402
470
475
477
479
443.137
443.177
442.703
443.5
445.074
445.715
446.975
445.965
442
443
443
443
444
Azi
61.06
60.86
61.99
59.14
58.56
62.76
60.62
63.14
62.56
61.11
60.63
59.56
62.08
59.25
65.71
65.83
61.67
65.49
63.69
67.86
63.23
63.99
60.69
67.69
63.34
92.66
92.75
250.2
64.57
251.61
269.76
91.31
272.53
274.32
271.57
273.29
273.89
268.28
274.84
270.26
272.86
273.8
270.53
273.9
275.01
Dip
-60.46
-61.38
-60.17
-59.57
-60.42
-61.19
-60.89
-59.81
-60.17
-59.11
-60.01
-60.18
-58.85
-60.31
-58.49
-57.92
-57.5
-57.86
-58.13
-57.27
-60.29
-58.85
-60.41
-57.67
-59.74
-56.17
-55.71
-55.45
-55.35
-54.79
-56.21
-54.23
-60.6
-60.21
-60.08
-60.73
-59.99
-60.1
-60.59
-60.23
-59.16
-60.08
-59.47
-59.97
-60.03
13
ASX ANNOUNCEMENT
26 March 2025
HoleID
WKEX033
WKEX034
WKEX035
WKEX036
WKEX037
WKEX038
WKEX039
WKEX040
WKEX041
WKEX042
Depth
113
168
132
186
96
174
85
180
186
162
East
257161
257161
257200
257281
257160
257222
257184
257235
257039
257047
North
6783786
6783786
6783859
6783866
6783719
6783723
6783649
6783652
6783735
6783660
RL
444
444
445
445
444
444
444
444
443
443
Azi
272.85
270.22
271.21
268.7
271.91
270.24
272.13
271.47
272.79
269.56
Dip
-59.51
-59.89
-59.64
-60.08
-60.15
-59.72
-60.39
-60.81
-59.79
-58.96
ENDDATE
1-Jan-84
1-Jan-84
23-Apr-20
23-Apr-20
24-Apr-20
24-Apr-20
25-Apr-20
26-Apr-20
2-May-20
30-Jun-04
30-Jun-04
30-Jun-04
30-Jun-04
30-Jun-04
30-Jun-04
30-Jun-04
30-Jun-04
30-Jun-04
30-Jun-04
30-Jun-04
30-Jun-04
30-Jun-04
30-Jun-04
30-Jun-04
30-Jun-04
30-Jun-04
30-Jun-04
30-Jun-04
30-Jun-04
28-May-96
DIP
-60
-60
-60
-60
-60
-60
-70
-60
-60
-60
-60
-60
-60
-60
-60
-60
-60
-60
-60
-60
-60
-60
-60
-60
-60
-60
-60
-60
-60
-90
Appendix 3 Historic Drilling Information
Historic Collar Information - West Knell & Bombay
Hole ID
DDH1
DDH3
IDRC055
IDRC056
IDRC057
IDRC058
IDRC059
IDRC061
IDRC062
MIB549
MIB554
MIB556
MIB558
MIB559
MIB560
MIB561
MIB563
MIB564
MIB565
MIB566
MIB567
MIB568
MIB569
MIB574
MIB575
MIB576
MIB578
MIB579
MIB580
SNR6783400-4
Depth
East
North
RL
122 257357.4 6783633 445.5002
119
257388 6783646 446.0288
90
256921 6783695 442.8167
90
256988 6783699 442.7644
100
257040 6783701 443.2667
109
256973 6783601 443.001
80
256909 6783604 443.0118
90
256997 6783499 443.6024
132
257028 6783498 443.7509
45
256930 6783800 442.3079
43
256870 6783700 442.5685
45
256910 6783700 442.6367
45
256950 6783700 442.3344
46
256970 6783700 442.5768
46
256990 6783700 442.7836
39
257010 6783700 442.9653
41
256890 6783600 443.0001
42
256910 6783600 443.0208
48
256930 6783600 443.0304
41
256950 6783600 443.0046
46
256970 6783600 443.0021
40
256990 6783600 443.001
51
257010 6783600 442.7734
49
256950 6783500 443.5006
48
256970 6783500 443.5278
54
256990 6783500 443.5772
30
256870 6783400 444.012
45
256890 6783400 443.9917
51
256910 6783400 443.994
42
256938 6783558 443.3785
AZI
249.06
249.06
269.89
269.89
269.89
269.89
89.89
269.89
269.89
270
270
270
270
270
270
270
270
270
270
270
270
270
270
270
270
270
270
270
270
0
14
ASX ANNOUNCEMENT
26 March 2025
Hole ID
SNR6783600-12
BR6783400-4
BR6783400-5
BR6783600-8
BYDD002
BYDD003
BYRD004
BYRD005
IDA 1
IDA 2
IDA 3
IDA 6
IDA 7
IDR006
IDR024
IDR027
IDR056
IDR057
IDR058
IDR177
IDR220
IDRC001
IDRC002
IDRC003
IDRC005
IDRC007
IDRC010
IDRC011
IDRC014
IDRC015
IDRC016
SE1
SE2
SE3
SE4
Depth
38
43
36
36
86.2
299.2
350.5
252.5
40
59
32
67
73
63
59
46
54
44
40
50
60
150
114
65
110
90
80
110
90
100
90
54
30
30
24
East
256888
248886
248936
248786
249020
248875.2
249064
249060
248866.9
248847.3
248825.5
248929.8
249004
248679
248759
248842
248958
248984
249004
248589
248681
248642
248660
248689
248748
248908
248990
248971
248642
248603
248571
248874.2
248897.2
248855.3
248886.3
North
6783758
6783557
6783557
6783757
6783474
6783418
6783494
6783491
6783599
6783620
6783646
6783530
6783450
6783774
6783592
6783624
6783450
6783461
6783470
6783954
6784193
6783758
6783766
6783777
6783686
6783538
6783464
6783456
6783868
6783854
6783946
6783604
6783577
6783627
6783613
RL
442.0348
451.1088
449.232
448.1166
448.5044
449.8278
451
451
451.2823
451.1308
450.9133
449.7304
449.3641
447.4763
450.5203
451.1103
449.5953
449.4614
449.2098
449.1531
445.1362
447.5379
447.4996
447.4358
449.3663
450.197
449.4032
449.5009
447.8811
448.087
449.0514
451.015
450.5488
451.0186
450.3793
ENDDATE
28-May-96
Length
2
1.25
0.5
1
1.5
1
1
Au g/t
185.9
4.48
0.67
0.78
2.08
0.83
2.17
DIP
-90
-90
-90
-90
-61.1
-60.2
-56.9
-49.1
-60
-60
-60
-60
-60
-60
-60
-60
-60
-60
-60
-60
-60
-59.45
-59.06
-60.09
-59.47
-59.54
-59.27
-59.52
-59.14
-59.75
-59.44
-60
-60
-60
-60
AZI
0
0
0
0
249.3
72.3
250.9
250.5
50
44
44
44
44
70
70
70
70
70
70
70
70
73.51
72.11
73.53
72.81
72.05
74.33
72.59
73.36
71.28
71.41
59.89
54.89
54.89
54.89
Historic Significant Intercepts – West Knell & Bombay
HoleID
DDH1
and
and
DDH3
and
IDRC055
and
From
50.5
54.5
65.5
99.5
107.5
29
51
To
52.5
55.75
66
100.5
109
30
52
Cu ppm
127.5
197
1500
1428.5
101
1926
15
ASX ANNOUNCEMENT
26 March 2025
HoleID
IDRC056
and
and
IDRC057
IDRC058
and
and
IDRC059
IDRC061
and
IDRC062
MIB549
MIB554
MIB556
and
and
MIB558
MIB559
and
MIB560
and
and
MIB561
MIB563
MIB564
MIB565
and
MIB566
and
MIB567
MIB568
MIB569
MIB574
MIB575
and
MIB576
and
MIB578
MIB579
and
MIB580
BR6783400-4
BR6783400-5
BR6783600-8
BYDD002
From
17
25
70
62
23
34
93
33
58
64
76
21
13
17
42
44
22
20
29
18
23
26
29
24
30
32
35
19
26
19
33
42
25
42
46
44
53
26
36
38
29
21
17
32
62.25
To
20
32
71
63
26
36
94
38
59
69
81
22
14
21
43
45
29
24
30
20
24
27
32
25
32
33
36
20
40
22
37
46
26
44
48
45
54
27
37
39
32
31
25
35
62.8
Length
3
7
1
1
3
2
1
5
1
5
5
1
1
4
1
1
7
4
1
2
1
1
3
1
2
1
1
1
14
3
4
4
1
2
2
1
1
1
1
1
3
10
8
3
0.55
Au g/t
0.78
0.67
0.56
1.24
0.95
0.76
1.41
0.99
0.62
0.79
3.2
0.7
0.58
0.66
0.55
0.74
0.87
2.17
4.32
0.82
0.58
0.78
1.01
1.61
0.82
0.63
1.11
0.82
1.64
2.21
0.73
0.94
0.81
0.66
0.5
1.22
1.23
1.76
0.55
0.87
0.55
0.65
0.88
3.48
1.11
Cu ppm
1132
273.14
1057
15888
448
227.5
75
1141.2
573
2907.8
871.8
188
337.25
149.67
543
16
ASX ANNOUNCEMENT
26 March 2025
HoleID
and
and
BYDD003
BYRD004
and
BYRD005
and
IDA 1
IDA 2
IDA 3
IDA 6
and
IDA 7
IDR006
IDR024
IDR027
IDR056
IDR057
and
IDR058
IDR177
IDR220
IDRC001
IDRC002
IDRC003
IDRC005
and
IDRC007
IDRC010
and
IDRC011
IDRC014
IDRC015
IDRC016
SE1
and
and
and
SE2
and
and
SE3
and
and
From
69.9
73.8
124.73
112.3
202
113
194.2
15
24
25
27
20
27
20
33
1
23
46
17
39
28
28
45
82
61
27
25
41
25
19
41
36
21
55
43
0
7
17
24
24
27
30
0
5
24
To
71
74.3
137
115
203
114
195.2
18
26
26
31
22
33
22
56
3
25
48
18
40
30
32
49
83
66
36
30
42
34
36
44
46
22
65
44
1
8
18
30
25
28
33
1
7
30
Length
1.1
0.5
12.27
2.7
1
1
1
3
2
1
4
2
6
2
23
2
2
2
1
1
2
4
4
1
5
9
5
1
9
17
3
10
1
10
1
1
1
1
6
1
1
3
1
2
6
Au g/t
2.84
0.81
0.83
1.98
0.64
1
8.6
1.09
1.12
1.94
1.01
1.42
1.11
1.22
1.55
0.8
0.78
0.61
1.14
0.51
5.62
2.52
0.57
1.15
1.31
0.88
0.91
0.89
1.52
0.89
2.88
3.31
1.37
0.7
1.94
0.55
1.07
0.5
1.01
0.7
0.52
2.16
0.5
4.53
3.15
Cu ppm
663.36
345
513.33
17
ASX ANNOUNCEMENT
26 March 2025
HoleID
SE4
From
16
To
24
Length
8
Au g/t
0.85
Cu ppm
JORC Code, 2012 Edition
Table 1; Section 1: Sampling Techniques and Data Mt Ida
Criteria
Explanation
Sampling
techniques
Nature and quality of sampling (e.g. cut
channels, random chips, or specific
specialised industry standard measurement
tools appropriate to the minerals under
investigation, such as down hole gamma
sondes, or handheld XRF instruments, etc).
These examples should not be taken as
limiting the broad meaning of sampling.
Include reference to measures taken to
ensure sample representivity and the
appropriate calibration of any measurement
tools or systems used. Aspects of the
determination of mineralisation that are
Material to the Public Report. In cases where
‘industry standard’ work has been done this
would be relatively simple (e.g. ‘reverse
circulation drilling was used to obtain 1 m
samples from which 3 kg was pulverised to
produce a 50 g charge for fire assay’). In
other cases more explanation may be
required, such as where there is coarse gold
that has inherent sampling problems. Unusual
commodities or mineralisation types (e.g.
submarine nodules) may warrant disclosure
of detailed information
Drilling techniques
Drill type (e.g. core, reverse circulation, openhole hammer, rotary air blast, auger, Bangka,
sonic
Share your feedback
Discover