Delta Lithium Limited (ASX: DLI) (“Delta” or the “Company”) is pleased to provide the following report on
activities undertaken during the September Quarter, 2024.
September Quarter Highlights
•
Underground Mining Approval received from Department of Energy, Mines, Industry, Regulation
and Safety (DEMIRS) at the Mt Ida Gold Project (“Mt Ida”)
•
Mt Ida is underpinned by a Mineral Resource Estimate (MRE) of:
o
o
6.6 Mt @ 3.5g/t Au for 752,000 ounces (at various cut-off grades)
Including the Baldock Area, which is one of the highest-grade undeveloped deposits in WA
containing 4.8Mt @ 4.4g/t Au for 674,000 oz
•
Baldock Area now fully permitted for Open Pit and Underground mining
•
Favourable Metallurgy test work results at Baldock average +92% recovery
•
Studies on standalone Processing Plant are advanced
•
4-stage Gold exploration program commenced comprised of 35-40,000m Reverse Circulation
and Diamond Drilling
•
Strategic Review commenced to assess the best path to deliver shareholder value from the Mt
Ida Project
o
Bell Potter has been appointed as Financial Advisor to the Strategic Review
•
Mt Ida Internal scoping study recently completed
•
Gold exploration at Mt Ida ongoing to target high-grade resource extensions and regional targets
•
Continued exploration success at the Malinda Prospect at the Yinnetharra Lithium Project,
highlights from resource definition include:
o
25m @ 2.84% Li2O from 148m in YDRD050 at M36
o
124m @ 1.1% Li2O from 11m in YDPT005 at M1 (metallurgical hole – not true width)
o
78m @ 0.8% Li2O from 105m in YRRD668 at M47
o
46m @ 1.1% Li2O from 203m in YDGT002 at M1
including 22m @ 1.4% Li2O from 160m
Commenting on the quarter, Managing Director of Delta Lithium, Mr James Croser said:
“Delta has achieved multiple key milestones throughout the quarter with continued exploration success at
Yinnetharra and the Mt Ida Gold Project receiving all necessary permits to proceed with development.
“In September, the Company appointed Bell Potter as Financial Advisor to undertake a strategic review of
the Mt Ida Gold Opportunity. Concurrently, we are completing metallurgical and geotechnical studies as
well as extensional and exploration drilling, with the objective being to continue to grow the existing resource
to in excess of 1-million ounces.
1
ASX ANNOUNCEMENT
30 OCTOBER 2024
“The team’s decision to complete a strategic review is timely with our recently updated Mineral Resource
and the current stage we’re in with the commodity price cycle. The sustained strength in the price of gold
has presented a compelling opportunity for Delta to explore the optimal monetisation pathway for Mt Ida
while preserving our core lithium assets. This decision is in line with our strategy of becoming a major lithium
producer in the future.”
MT IDA PROJECT
Mt Ida is located approximately 100km northwest of Menzies, and approximately 225km by road from
Kalgoorlie in Western Australia’s prolific Eastern Goldfields mining region (Figure 1). The Project area
resides on granted mining leases and is approved for open pit and underground mining at Baldock, which
hosts the majority of the high-grade gold Mineral Resource at Mt Ida
At Mt Ida, an RC rig has mobilised and has commenced limited lithium exploration and gold resource
development drilling. A subsequent diamond drill program has mobilised to target extensions to the existing
high-grade gold resource.
Figure 1: Location of Mt Ida Project with Gold and Lithium Resources stated
Mt Ida Project Development - Lithium
Mapping and surface rock chips identified the Drake and Bonny lithium prospects on the eastern granite
margin. The prospects show a strike extent of at least 250m and returned rock chip assays up to 2.1% Li2O.
The Company recently mobilised an RC rig to Mt Ida to commence Stage 1 of a modest four stage drill
program.
2
ASX ANNOUNCEMENT
30 OCTOBER 2024
The program commenced on first-pass reconnaissance of a surface spodumene target at the Bonny &
Drake lithium prospects followed by targeted gold drilling. Initial results from the first 2 Bonny holes have
been returned which have intercepted pegmatite, however they did not intercept the high-grade plunge of
the spodumene observed at surface. Modelling and reinterpretation of this data is ongoing. This first pass
program has drilled 1,200m to test these prospects and final assay results when received will determine
future actions.
Mt Ida Project Development - Gold
Delta has recently announced an updated gold resource for its 100% owned Mt Ida Project (refer ASX
announcement 28 June 2024 titled) “Mt Ida Gold MRE Update”.
The Mineral Resource estimate for Mt Ida Gold is 6.6Mt @ 3.5 g/t Au for 752,000 ounces.
This includes the high grade Baldock Deposit 4.8Mt @ 4.4g/t Au for 674,000 oz.
Currently, the majority of the ounces at Baldock reside in 5 Main Lodes, namely:
•
•
•
•
086 Lode at the south end of strike
90/100 Lodes in the southern half of strike and highest grade, located in the vicinity of the Sister
Sam lithium resource
110 Lode central to Baldock strike, located in the vicinity of the Timoni lithium resource
Meteor North 140 Lode, at the northern end of strike
Following completion of the reconnaissance drilling at Bonny and Drake, the RC rig has moved onto
resource extension gold drilling at Baldock and regional gold drilling. The four-stage program will consist of
approximately 35-40,000 drill metres including both RC and diamond drilling.
Metallurgy Test Work
Metallurgical test work has been completed on composited representative samples collected across the
main Baldock resource lodes as shown in Figure 4.
Each of the five Main Lodes that make up the Baldock area were composited to present spatially variable
and representative samples for both Open Pit and Underground potential ore sources at a range of grind
sizes. The test work will be used for subsequent flowsheet development for studies on a standalone
process plant.
Results of testing have indicated that all types of ore are amenable to processing via a standard crushing,
grinding, CIL adsorption plant, with gravity recovery of coarse gold. Reagent usage, does not indicate
major issues surrounding copper content (primarily as lower solubility chalcopyrite) even more so when
potential ore blending considerations are applied.
3
ASX ANNOUNCEMENT
30 OCTOBER 2024
Figure 2: Baldock Longsection showing metallurgy test work sample collection locations
Processing Plant
Delta has received non-binding indicative terms for toll treatment processing from a number of third parties,
which are being progressed and are commercially sensitive.
Delta has also engaged GR Engineering Services Ltd (GRES) for studies related to a standalone
Processing Plant. The assumed processing route is a standard crush, grind, gravity and CIL adsorption to
produce a dore.
Potential Resource Growth
The Company approved a $5-6M exploration drilling program at Mt Ida. This is the first program that is
primarily targeting the gold resources since Delta’s acquisition of the project in 2021. The majority of
previous drilling that has been undertaken at Mt Ida has been focused on LCT mineralisation which also
intercepted the gold lodes due to their spatial relationship with the pegmatites.
Stages 1-3 are comprised of RC and diamond drilling at the Baldock area. This drilling will target shallow
resource extensions along the 3km strike of the Baldock Deposit and deeper drilling to test the downdip and
plunge extensions to higher grade shoots. See Figure 5 for the staged approach to the Baldock drilling.
4
ASX ANNOUNCEMENT
30 OCTOBER 2024
Figure 3: Baldock Deposit Long Section showing 3-stage Drill Program targeting Gold
Stage 1 progressed during the quarter with the RC rig mobilised to the Baldock area. This drilling has
targeted shallow resource extensions and further along the 3km strike of the Baldock Deposit.
Stage 2 to follow this program will complete step out RC drilling of the existing JORC Compliant resources
including Kestrel. This stage will also complete pre-collars for the diamond drill rig.
Stage 3 will comprise of Diamond drilling to test the downdip and plunge extensions to higher grade shoots
of the Baldock Deposit. Note that all resource extensional drilling from Stages 1 – 3 will be completed on
granted mining leases and within the scope of existing Programs of Work (PoW’s).
Stage 4 RC drilling will assess a number of defined regional prospects. Drillholes have been designed to
follow up historic high-grade intercepts and represent compelling upside for the gold potential of the Mt Ida
project.
Drill programs are progressing well and results will be released to market as they become available.
Internal Scoping Study
An internal Scoping Study has been completed by the Company. Due to the proportion of inferred material,
the Company is not permitted to release the production physicals and cost estimate information. However,
the positive results provide sufficient encouragement for the Company to invest further in improving the gold
resource confidence and scale at Mt Ida.
The Scoping Study considered all material modifying factors such as mining assumptions, geotechnical,
metallurgy as well as groundwater and surface water studies, project infrastructure, environmental and
social factors.
The Scoping Study contemplated a conventional open pit and underground operation. A typical sections of
one of the open pits at Baldock is shown below.
5
ASX ANNOUNCEMENT
30 OCTOBER 2024
Upon completion of the drilling referenced in this announcement and upon the basis of the reported
metallurgy results and further testwork, Delta intends to update the Mineral Resource Estimate and build
upon the work completed by Scoping Study to publish a Pre-Feasibility Study and maiden Reserve
Statement. This is anticipated to be completed in the current Financial Year.
Mt Ida Strategic Review
Delta Lithium has appointed Bell Potter Securities Limited (“Bell Potter”) as financial adviser to conduct the
Strategic Review and explore various options for Mt Ida Gold. Delta Lithium will use the Strategic Review
to determine how to best monetise the substantial gold potential of the Baldock deposit, and broader assets
package that comprises Mt Ida Gold.
The Strategic Review will progress in parallel with ongoing development studies and exploration. The recent
scoping study contemplated a toll treating or ore purchase agreement for the gold resource only, while
preserving the lithium resource for a future investment decision.
The decision is in line with Delta Lithium’s strategy to maintain a principal focus on its lithium assets at the
Mt Ida Lithium Project and the Yinnetharra Project. There is no guarantee that the Strategic Review will
result in any specific transactional outcome.
Figure 4: Cross Section of Baldock 086 Optimised Pit Shell at 6,778,224mN
6
ASX ANNOUNCEMENT
30 OCTOBER 2024
Figure 5: Cross Section of Baldock 090 & 100 Optimised UG development
YINNETHARRA LITHIUM PROJECT
Exploration and Resource Development
The Yinnetharra project is in the Gascoyne region of Western Australia targeting Lithium mineralisation.
Delta Lithium has 1,769km2 of tenure owned outright and as Farm-in Joint Ventures. A maiden MRE was
released in December 2023 of 25.7Mt @ 1% Li2O 1. Farm-In Joint Venture Agreements have expanded the
prospective stratigraphy to over 80km in length.
Exploration throughout the quarter has focused on the completion of the resource definition program for
Malinda and the diamond drill programs to collect representative bulk samples for metallurgical testwork.
Results have continued to demonstrate strong lithium intercepts from the M1, M36 and M47 pegmatites,
which form the bulk of the MRE. Highlights from the most recent round of drilling can be found in table 1.
1 Refer ASX Announcement 27 December 2023 titled “Yinnetharra Lithium Project Maiden Mineral Resource Estimate”
7
ASX ANNOUNCEMENT
30 OCTOBER 2024
HoleID
YDPT005
YDPT006
YDRD050
YRRD668
YDRD052
YRRD690
YDPT004
YDGT002
YRRD671
YDRD056
YDPT001
YDPT006
YRRD640
YRRD663A
YRRD577
YDPT002
JREX030A
YRRD618
YRRD690A
YDRD053
YRRD678A
YRRD679
YRRD588
YRRD660
YRRD634
YRRD633A
From m To m
Length m Li2O pct Ta2O5 ppm Fe2O3%
11.0
135.1
124.1
1.1
50.8
2.6
119
217
108
0.7
54.8
2.7
148
173
25
2.8
111.2
2.5
105
183
78
0.8
217.3
3.2
80.6
117.0
36.4
1.5
54.3
0.8
62
105
43
1.2
68.1
1.1
82.7
154.2
71.5
0.7
63.9
0.7
203.0
248.6
45.6
1.1
63.1
0.8
202.1
237.4
35.3
1.18
77
1.53
148.5
191.0
42.5
1.0
58.9
0.5
23.8
52.5
28.6
1.3
70.6
0.9
119
161
42
0.8
38.1
1.6
202
219
17
1.85
116
2.94
149
178
29
1.0
76.9
2.5
170
197
27
1.0
23.2
0.9
37.3
61.1
23.8
1.1
76.5
1.2
113
123
10.0
2.2
55.7
1.1
152.5
170.6
18.1
1.0
58.9
1.2
32
59
27
0.7
47.3
2.5
89
100
11
1.3
26.3
0.7
186
195
9.0
1.5
25.4
0.8
89.0
101.3
12.3
1.1
45.1
4.9
86
99
13
1.0
55.4
1.0
39
59
20
0.7
242.4
1.1
171
184
13
1.0
53.1
3.9
150
159
9
1.3
46.1
4.2
Table 1: Highlight of recent drilling results from Yinnetharra
In Table 1, Hole identifiers YDPT relate to PQ diamond core drilled non-perpendicular into M1 for
metallurgical pilot testwork. YDGT identifier relates to geotechnical holes drilled to procure samples for
geotechnical logging and testwork.
Lithium resources at Malinda are largely present in three main pegmatites, the M1, M36 and M47.
Mineralisation extends from surface to a depth of >300m although recent drilling has other near surface
mineralisation from two other pegmatites M42 and M20.
The current drill campaign at Malinda completed in October having tested regional targets at Talisker,
Caribou and Calypso. Assays are pending for these targets. Field teams continue to undertake detailed
geological mapping and geochemical surface sampling across prospective areas of the tenement package.
Ongoing exploration efforts and cooperation with Traditional Owners will support the expansion and further
definition of target prospects as the Company moves into development phases at Malinda while also
continuing regional efforts across the tenure.
See Figure 6 for Yinnetharra prospect locations.
8
ASX ANNOUNCEMENT
30 OCTOBER 2024
Figure 6: Yinnetharra regional prospects.
Yinnetharra Project Development
Environmental baseline studies have progressed at Yinnetharra including flora and fauna, materials
characterisation, surface and groundwater studies. These studies will be ongoing for the balance of
CY2024 with a view to determining the permitting route by the end of CY2024 in collaboration with the
relevant Government Agencies.
Targeted geotechnical drilling in conjunction with the identification and acquisition of core for metallurgical
variability testwork across the Malinda orebody has now been completed.
A metallurgical test work programme to a DFS level of detail was approved by the Delta Board late in the
Quarter to target the M1 pegmatite orebody, which hosts the majority of the Resource at Malinda. This test
work, including a 4 tonne pilot plant test on the M1 will be ongoing for the remainder of CY2024 and is
expected to be completed early in the March Quarter of 2025. Material results will be reported as they
become available.
Geotechnical studies on the M1, M36 and M47 will also be ongoing for the remainder of CY2024.
The metallurgy and geotechnical studies on the M1 are designed to support a Maiden Reserve in
conjunction with the next Resource update at Malinda which will incorporate recent drilling designed to
upgrade the Inferred component to an Indicated category.
9
ASX ANNOUNCEMENT
30 OCTOBER 2024
Malinda Metallurgy
Flotation variability metallurgical test work has advanced with results from the M1 demonstrating the
potential for high recovery of spodumene to high grade low impurity concentrates. Advanced M1 flowsheet
development and optimisation is nearing completion with recent results tabulated below in Table 2,
consistently showing excellent spodumene recoveries. Similar sample collection and flotation variability test
work has commenced and will continue on the M36 and M47 pegmatites.
Although test work was completed with Perth tap water, the base case scenario for processing water on
site is RO treatment of groundwater from a borefield, so tap water is considered a reasonable substitute
for the test work. Subsequent tests, including the 4t pilot will utilise RO water generated at site.
Head Feed
Program
Flowsheet
Development
Test
Parameter
Composite
Grade
Mags & Slimes
Spodumene Concentrate
Grade
Recovery
Global
Recovery
Grade
(%
Li2O)
(%
Fe2O3)
(%
Li2O)
(% Li2O)
(%
Li2O)
(%
Fe2O3)
(% Li2O)
BC1
106um
Bulk
1
0.4
1
12
6.8
0.4
78
BC2
125um
Bulk
1
0.4
0.9
10
6.8
0.4
79
BC3
150um
Bulk
1
0.4
0.9
8
6.7
0.4
80
BC45
180um
Bulk
1
0.4
1
7
6.4
0.4
81
BC46
212um
Bulk
1
0.4
1
6
6.2
0.4
81
Table 2: M1 Metallurgical grind size variability flotation results
Figure 7: Malinda Plan view showing block models with selected recent intercepts
10
ASX ANNOUNCEMENT
30 OCTOBER 2024
CORPORATE
During the quarter, Delta’s management team attended the Noosa Mining Conference in July and Diggers
and Dealers in August. These conferences provided valuable opportunities for the Company to provide
updates to key institutional investors and brokers in the market.
Subsequent to the end of the quarter Delta disposed of the non-core Eureka gold project to Javelin Minerals
for $1.5M cash consideration, $1.5M in Javelin shares and up to $1M deferred consideration subject to
recommencement of mining operations or achieving a resource in excess of 200,000ozs.
Cash and Cash Equivalents
Cash at the end of the quarter was $76.4M.
ASX Compliance
For the purpose of Listing Rule 5.3.2, the Company confirms that there were no mining production and
development activities during the quarter by the Company or its subsidiaries.
In accordance with section 6 of the Appendix 5B, the Company advises that $290k was paid to related
parties of the entity and their associates during the quarter, including Executive and Non-Executive Director
fees.
Release authorised by the Board of Delta Lithium Limited.
For further information, please contact:
Delta Lithium
James Croser, Managing Director
Peter Gilford, CFO & Company Secretary
+61 8 6109 0104
info@deltalithium.com.au
Investor/Media Enquiries
Sodali & Co
Michael Weir +61 402 347 032
About Delta Lithium
Delta Lithium (ASX: DLI) is an exploration and development company focused on bringing high-quality, lithium-bearing pegmatite deposits, located
in Western Australia, into production. With current global JORC compliant resources of 40.4Mt@1.1%Li2O, strong balance sheet and an
experienced team driving the exploration and development workstreams, Delta Lithium is rapidly advancing its Projects.
The Mt Ida Project has coincident gold and lithium orebodies and holds a critical advantage over other developers with existing Mining Leases and
an approved Mining Proposal for both OP & UG mining. Delta Lithium is pursuing a development pathway to unlock maximum value for
shareholders. Delta Lithium is currently drilling to extend the high-grade gold resources at Mt Ida Gold.
Delta Lithium also holds the highly prospective Yinnetharra Lithium Project that is already showing signs of becoming one of Australia’s most
exciting lithium regions, with exciting lithium discoveries at the Malinda and Jamesons prospects. The Company is currently conducting exploration
activities at Yinnetharra with drilling and fieldwork ongoing throughout 2024 across our large tenure package, testing additional targets and building
on the Maiden Resource released in December 2023.
11
ASX ANNOUNCEMENT
30 OCTOBER 2024
Competent Person's Statement
Information in this announcement that relates to exploration results is based upon work undertaken by Mr. Shane Murray, a Competent Person who
is a Member of the Australasian Institute of Geoscientists (AIG). Mr. Murray has sufficient experience that is relevant to the style of mineralisation
and type of deposit under consideration and to the activity which he is undertaking to qualify as a ‘Competent Person’ as defined in the 2012 Edition
of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’ (JORC Code). Mr. Murray is an employee of
Delta Lithium and consents to the inclusion in this announcement of the matters based on his information in the form and context in which it appears.
Refer to www.deltalithium.com.au for past ASX announcements.
Past Exploration results and Mineral Resource Estimates reported in this announcement have been previously prepared and disclosed by Delta
Lithium in accordance with JORC 2012. The Company confirms that it is not aware of any new information or data that materially affects the
information included in these market announcements. The Company confirms that the form and content in which the Competent Person's findings
are presented here have not been materially modified from the original market announcement, and all material assumptions and technical
parameters underpinning Mineral Resource Estimates in the relevant market announcement continue to apply and have not materially changed.
Refer to www.deltalithium.com.au for details on past exploration results and Mineral Resource Estimates.
Disclaimer
This release may include forward-looking and aspirational statements. These statements are based on Delta Lithium management’s expectations
and beliefs concerning future events as of the time of the release of this announcement. Forward-looking and aspirational statements are necessarily
subject to risks, uncertainties and other factors, some of which are outside the control of Delta Lithium, which could cause actual results to differ
materially from such statements. Delta Lithium makes no undertaking to subsequently update or revise the forward looking or aspirational statements
made in this release to reflect events or circumstances after the date of this release, except as required by applicable laws and the ASX Listing
No New Information
This document should be read in conjunction with Delta’s other periodic and continuous disclosure announcements lodged with the ASX, which are
available on Delta’s website.
12
ASX ANNOUNCEMENT
30 OCTOBER 2024
JORC Tables
Table 3: Global Lithium Mineral Resource Estimate Summary Table
Delta Lithium Group Mineral Resource estimate
Cut-off
Resource category
Li2O
Ta2O5
grade
Tonnes
Grade
Li2O
Grade
(Li2O%)
(Mt)
(% Li2O)
(Kt)
(Ta2O5 ppm)
-
-
-
-
6.7
1.0
65
51
19.0
1.0
181
67
Total Resource
25.7
1.0
246
62
Measured
-
-
-
-
7.8
1.3
104
224
6.8
1.1
76
154
14.6
1.2
180
191
Total Measured
-
-
-
-
Total Indicated
14.5
1.2
169
144
Total Inferred
25.8
1.0
257
90
Total
40.4
1.1
426
109
Measured
Indicated
Yinnetharra
0.5
Inferred
Indicated
Mt Ida
0.5
Inferred
Total Resource
Notes:
Tonnages and grades have been rounded to reflect the relative uncertainty of the estimate. Inconsistencies in
the totals are due to rounding.
Table 4: Mt Ida Project; global gold Mineral Resource
Mt Ida Gold Mineral Resource Estimate
Indicated
Cut off
Open cut Au
0.5 g/t
0.0 g/t Au Cut
off
Underground
1.5 g/t Au
Deposit
Inferred
Tonnes
Grade
Ounces
Tonnes
Grade
Ounces
Tonnes
Grade
Ounces
(000s)
g/t Au
(000s)
(000s)
g/t Au
(000s)
(000s)
g/t Au
(000s)
Baldock
1,345
4.9
209.0
1,512
3.2
158
2,857
4.0
367
Kestrel
-
-
-
570
1.6
29
570
1.6
29
Golden Vale
-
-
-
496
1.7
27
496
1.7
27
Mt Ida Tailings
-
-
-
500
0.5
8
500
0.5
8
Baldock
180
5.8
33.0
1,780
4.8
274
1,960
4.9
307
Kestrel
-
-
-
220
1.9
14
220
1.9
14
Golden Vale
-
-
-
-
-
-
-
-
-
500
0.5
8
500
0.5
8
Mt Ida Tailings
All
Total
Baldock
1,525
4.9
242.0
3,292
4.1
432
4,817
4.4
674
Kestrel
-
-
-
790
1.7
43
790
1.7
43
Golden Vale
-
-
-
496
1.7
27
496
1.7
27
1,525
4.9
242.0
5,078
3.1
510
6,603
3.5
752
Total
13
ASX ANNOUNCEMENT
30 OCTOBER 2024
Appendix 1 – Tenement Listing
Project
Location
Tenement
Status
Interest
at start
of
Quarter
Eureka
Western Australia
L24/0234
Granted
100%
100%
Eureka
Western Australia
M24/0189
Granted
100%
100%
Eureka
Western Australia
M24/0584
Granted
100%
100%
Eureka
Western Australia
M24/0585
Granted
100%
100%
Eureka
Western Australia
M24/0586
Granted
100%
100%
Eureka
Western Australia
P24/5116
Granted
100%
100%
Eureka
Western Australia
P24/5548
Granted
100%
100%
Eureka
Western Australia
P24/5549
Granted
100%
100%
Mt Ida
Western Australia
E29/0640
Granted
100%
100%
Mt Ida
Western Australia
E29/0771
Granted
100%
100%
Mt Ida
Western Australia
E29/0944
Granted
100%
100%
Mt Ida
Western Australia
E29/0964
Granted
100%
100%
Mt Ida
Western Australia
E29/1238
Granted
100%
100%
Mt Ida
Western Australia
E29/1239
Granted
100%
100%
Mt Ida
Western Australia
E29/1240
Granted
100%
100%
Mt Ida
Western Australia
E29/1262
Application
100%
100%
Mt Ida
Western Australia
M29/0002
Granted
100%
100%
Mt Ida
Western Australia
M29/0094
Granted
100%
100%
Mt Ida
Western Australia
M29/0165
Granted
100%
100%
Mt Ida
Western Australia
M29/0422
Granted
100%
100%
Mt Ida
Western Australia
M29/0429
Granted
100%
100%
Mt Ida
Western Australia
M29/0444
Granted
100%
100%
Mt Ida
Western Australia
P29/2397
Granted
100%
100%
Mt Ida
Western Australia
P29/2398
Granted
100%
100%
Mt Ida
Western Australia
P29/2399
Granted
100%
100%
Mt Ida
Western Australia
P29/2400
Granted
100%
100%
Mt Ida
Western Australia
P29/2401
Granted
100%
100%
Mt Ida
Western Australia
P29/2402
Granted
100%
100%
Mt Ida
Western Australia
P29/2403
Granted
100%
100%
Mt Ida
Western Australia
P29/2404
Granted
100%
100%
Mt Ida
Western Australia
P29/2405
Granted
100%
100%
Mt Ida
Western Australia
P29/2406
Granted
100%
100%
Mt Ida
Western Australia
P29/2407
Granted
100%
100%
Mt Ida
Western Australia
P29/2666
Granted
100%
100%
Mt Ida
Western Australia
P29/2667
Granted
100%
100%
Mt Ida
Western Australia
P29/2668
Granted
100%
100%
Interest
at end of
Quarter
14
ASX ANNOUNCEMENT
30 OCTOBER 2024
Project
Location
Tenement
Status
Interest
at start
of
Quarter
Mt Ida
Western Australia
P29/2669
Granted
100%
100%
Mt Ida
Western Australia
L29/166
Granted
100%
100%
Mt Ida
Western Australia
L29/171
Granted
100%
100%
Mt Ida
Western Australia
L29/186
Application
10%
100%
Mt Ida**
Western Australia
L29/174
Granted
100%
100%
Mt Ida**
Western Australia
L29/175
Granted
100%
100%
Mt Ida**
Western Australia
L29/176
Granted
100%
100%
Mt Ida**
Western Australia
L29/177
Granted
100%
100%
Mt Ida**
Western Australia
L30/094
Granted
100%
100%
Yinnetharra
Western Australia
E09/2169
Granted
100%
100%
Yinnetharra
Western Australia
E09/2170
Granted
100%
100%
Yinnetharra
Western Australia
E09/2283
Granted
100%
100%
Yinnetharra
Western Australia
E09/2545
Granted
100%
100%
Yinnetharra
Western Australia
E09/2621
Granted
100%
100%
Yinnetharra
Western Australia
E09/2705
Application
100%
100%
Yinnetharra
Western Australia
E09/2716
Application
100%
100%
Yinnetharra
Western Australia
E09/2772
Application
100%
100%
Yinnetharra
Western Australia
E09/2806*
Application
100%
100%
Yinnetharra
Western Australia
E09/2808*
Application
100%
100%
Yinnetharra
Western Australia
E09/2814
Application
100%
100%
Western Australia
E09/18241
Granted
100%
100%
Lyons River
Western Australia
E09/18251
Granted
100%
100%
Lyons River
Western Australia
E09/20981
Granted
100%
100%
Lyons River
Western Australia
E09/21021
Granted
100%
100%
Western Australia
E09/23041
Granted
100%
100%
Lyons River
Western Australia
E09/23051
Granted
100%
100%
Lyons River
Western Australia
E09/23121
Granted
100%
100%
Lyons River
Western Australia
E09/27131
Granted
100%
100%
Lyons River
Lyons River
Camel Hill2
Interest
at end of
Quarter
Western Australia
E09/23542
Granted
0%
0%
Camel Hill2
Western Australia
E09/23882
Granted
0%
0%
Morrissey Hill2
Western Australia
E09/23752
Granted
0%
0%
Morrissey Hill2
Western Australia
M09/1012
Granted
0%
0%
Morrissey Hill2
Western Australia
E09/28052*
Application
0%
0%
Morrissey Hill2
Western Australia
E09/28072*
Application
0%
0%
Ti-Tree Project3
Western Australia
E09/25033
Granted
0%
0%
Ti-Tree Project3
Western Australia
E09/24703
Application
0%
0%
Western Australia
E09/25223
Application
0%
0%
Western Australia
E09/29353
Application
0%
0%
Ti-Tree Project3
Ti-Tree Project3
15
ASX ANNOUNCEMENT
30 OCTOBER 2024
*Application remains in ballot
**Miscellaneous Licences are for the purpose for groundwater search only
1 100% LCT (lithium-caesium-tantalum) Mineral Rights only within Dalaroo Metals Ltd Lyons River Project
2 Earn-In & JV Agreement with Reach Resources Limited for Camel Hill & Morrissey Hill Projects
3 Earn-In & JV Agreement with Voltaic Strategic Resources Limited for Ti-Tree Lithium Project
16
Rule 5.5
Appendix 5B
Mining exploration entity and oil and gas exploration entity
quarterly cash flow report
Name of entity
DELTA LITHIUM LIMITED (ASX CODE: DLI)
ABN
Quarter ended (“current quarter”)
67 107 244 039
30 SEPTEMBER 2024
Consolidated statement of cash flows
Current quarter
$A’000
Year to date
-
-
(61)
(61)
(b) development
-
-
(c)
production
-
-
(d) staff costs
(479)
(479)
(e)
(474)
(474)
-
-
1.
Cash flows from operating activities
1.1
Receipts from customers
1.2
Payments for
(a)
exploration & evaluation (if expensed)
administration and corporate costs
(3 months)
$A’000
1.
Share your feedback
Discover