Mt Ida Maiden Gold Mineral Resource Estimate
Released
Released
Announcement PDF
ASX ANNOUNCEMENT
11 October 2023
Mt Ida Maiden Gold Mineral Resource Estimate
Highlights:
•
Delta Lithium is pleased to report its maiden Mineral Resource Estimate (MRE) for gold at Mt Ida.
Inferred and Indicated Mineral Resources of:
3.1Mt @ 4.1g/t Au for 412,000 ounces (at OP and UG cut offs)*
•
50% of the gold MRE is in the higher confidence Indicated Resource category.
•
85% of the gold MRE is co-located adjacent to the lithium resources, potentially providing
complementary revenue to the lithium operation.
•
100% of the gold MRE sits within granted Mining Leases.
•
85% of the gold MRE sits within areas subject to a Mining Proposal currently under assessment.
•
This maiden MRE includes two shallow high-grade discoveries, the Baldock 086 lode and the
Meteor North 140 lode.
o
o
Baldock 086
High grade shallow resource of 0.24Mt @ 9g/t Au for 70koz potentially amenable to open
pit mining and in close proximity to the top of the Sister Sam lithium resource.
Meteor North 140
High grade shallow resource of 0.6Mt @ 4.7g/t Au for 91koz, also with potential to mine via
open pit.
•
The co-located gold resource (Figure 3) has potential to enhance and de-risk the development of
the Mt Ida Lithium project, offering the opportunity for early cash flow from the sale or toll treatment
of shallow gold ore. Additionally, with market pricing for lithium and gold uncorrelated, Delta is
uniquely positioned among its peers.
•
100% of the drilling completed by Delta and used in this MRE is the result of lithium exploration and
resource development drilling.
*See Table 1, 2 and 3 below for full breakdown of MRE
Delta Lithium Limited (ASX:DLI) (“Delta” or the “Company”), is pleased to announce a maiden gold
MRE for its 100% owned Mt Ida Lithium Project in the Goldfields region of Western Australia.
The independent maiden gold MRE has been prepared by Snowden Optiro for the Mt Ida Lithium Project.
Delta’s Managing Director, James Croser comments;
“The definition of Delta’s maiden gold resource at Mt Ida, predominantly within the existing Mining Leases,
is a tremendous value add at the Mt Ida Lithium Project.
The key highlight of this MRE is the favourable location of the gold ore adjacent to the top of the Sister Sam
lithium ore, potentially allowing mining to occur within the same planned pit shell whilst adding minimal
incremental cost to the open pit operation. This affords us significant ability to derisk as we progress mining
studies.
While further metallurgical work on the gold mineralisation will be conducted, there are several gold
processing plants in the region and discussions will be conducted to investigate downstream processing
options.”
1
ASX ANNOUNCEMENT
11 October 2023
The Mineral Resource Estimate
The maiden independent gold MRE was prepared by Snowden Optiro on multiple gold lodes at the
Company’s wholly owned Mt Ida Lithium Project in the Eastern Goldfields Region of Western Australia.
Delta has drilled 178 drill holes for 35,619m, providing the basis to report an Indicated Mineral Resource
Estimate. Other than those results referred to as new in Table 4, all results have previously been released
to the market as detailed in the bibliography.
Table 1:Maiden gold Mineral Resource Estimate - Open pit.
Cut-off
Au g/t
0.5
Prospect
Classification
Western
Lodes
Kestrel
Indicated
Inferred
Inferred
Inferred
Total
Tonnes
Mt
0.52
0.30
0.57
0.86
1.38
Grade
Au g/t
6.6
3.7
1.6
2.3
3.9
Metal
Au koz
110
35
29
64
174
Table 2:Maiden gold Mineral Resource Estimate - Underground.
Cut-off
Au g/t
1.5
Prospect
Classification
Western
Lodes
Kestrel
Indicated
Inferred
Inferred
Inferred
Total
Tonnes
Mt
0.60
0.89
0.22
1.11
1.71
Grade
Au g/t
5.0
4.5
1.9
4.0
4.3
Metal
Au koz
97
128
14
142
238
The total combined gold Open Pit and Underground Mineral Resources is reported below in Table 3.
Table 3: Mt Ida Lithium Project; global gold Mineral Resource.
Cut-off
Au g/t
0.5 Open Pit
1.5 Underground
Prospect
Classification
Combined
Indicated
Inferred
Total
Tonnes
Mt
1.12
1.97
3.10
Grade
Au g/t
5.7
3.2
4.1
Metal
Au koz
206
206
412
In compliance with ASX Listing Rule 5.8.1, Appendix 1 and JORC Table 1 (see Appendix 3) contain all the
geological and estimation criteria utilised in the estimation of the Mt Ida Gold Mineral Resource.
2
ASX ANNOUNCEMENT
11 October 2023
Figure 1: Mt Ida Project Location
Figure 2: Plan view for gold Mineral Resources location at the Mt Ida Lithium Project
3
ASX ANNOUNCEMENT
11 October 2023
Figure 3: Oblique 3D view of drillholes and gold block models and Li bock models at Mt Ida coloured by grade
Figure 4: Plan views for the western side of the granite showing projections to surface of gold MRE wireframes and block models
(Yellow) and lithium MRE wireframes and models with geology image on the left and magnetics image on the right
4
ASX ANNOUNCEMENT
11 October 2023
Gold results from ongoing drilling has underpinned this maiden gold MRE at Mt Ida. The drilling has defined
two new high grade shallow gold discoveries; the Baldock 086 lode (Figure 5 & 6) and the North Meteor
140 lode (Figure 2). Table 4 below details new gold results received and differentiates between which results
are included in this maiden MRE and which will be included in a later MRE update.
Figure 5: Close up 3D view of Baldock 086 Au MRE blocks and Sister Sam Li2O MRE blocks within an optimised pit shell
Table 4: New gold results from drilling at the Mt Ida Lithium Project
HoleID
From
To
Length
Au g/t
Cu_ppm
gram M
in MRE
AURD002
58
60.3
2.3
12.24
2158
28.152
N
IDRD243N2
718.19
720
1.81
2.04
1132
3.6924
Y
IDRD249
943.07
944.29
1.22
14.07
1350
17.1654
Y
IDRD259
22
32
10
8.94
2817
89.4
Y
IDRD260
52
57
5
9.92
2448
49.6
Y
IDRD262
47
56
9
3.21
3288
28.89
Y
IDRD265
52
57
5
10.04
2042
50.2
Y
IDRD266
81
82
1
25.3
2130
25.3
Y
96
97
1
12.6
4930
12.6
IDRD269
50
57
7
10
3474
70
Y
IDRD273
61
64
3
5.75
1683
17.25
Y
IDRD277
49
54
5
2.2
2299
11
Y
and
5
ASX ANNOUNCEMENT
11 October 2023
HoleID
From
To
Length
Au g/t
Cu_ppm
gram M
in MRE
IDRD282
40
48
8
2.29
415
18.32
Y
LSEX001
294.09
294.61
0.52
73
4590
37.96
N
LSEX002
590.87
594.02
3.15
6.99
2004
22.0185
Y
TIRD070
32
40
8
3.69
153
29.52
Y
GWV086_036
34
35
1
17.8
148
17.8
Y
GWV086_046
28
37
9
4.28
38.52
N
GWV086_047
32
35
3
11.96
35.88
N
GWV086_049
41
46
5
3.06
15.3
N
GWV086_050
43
47
4
10.92
43.68
N
GWV086_058
32
37
5
4.65
880.8
23.25
Y
GWV086_059
36
40
4
20.2
460.25
80.8
Y
GWV086_060
48
53
5
2.87
328.6
14.35
Y
GWV086_061
31
34
3
5.25
15.75
Y
GWV086_063
77
79
2
6.2
12.4
N
GWV086_065
32
35
3
4.4
13.2
N
GWV086_066
34
38
4
24
96
N
GWV086_067
48
52
4
7.31
29.24
N
GWV086_068
50
54
4
4.23
16.92
N
43
49
6
5.06
30.36
55
60
5
7.76
38.8
Y
and
59
62
3
7.55
22.65
Y
and
50
57
7
3.97
27.79
Y
GWV086_087
61
65
4
10.71
42.84
N
GWV086_088
59
63
4
4.22
16.88
N
GWV086_089
60
66
6
9.34
56.04
N
GWV086_096
62
65
3
19.26
57.78
N
GWV086_097
65
70
5
34.01
170.05
N
GWV086_124
72
77
5
10.35
51.75
N
GWV086_132
62
63
1
19.07
19.07
N
and
GWV086_076
Note: See Appendix 2 for drillhole details
6
ASX ANNOUNCEMENT
11 October 2023
Figure 6: Cross section of Baldock 086 Au MRE blocks and Sister Sam Li2O MRE blocks within an optimised pit shell
The maiden gold MRE also considered gold mineralisation at the Kestrel prospect (Table 1, 2 and 3 and
Figure 7 below) located to the east of the granite on M29/422 (See Figure 1 and 2 for location). The drilling
completed to date at Kestrel has been undertaken by previous owners of the project.
Figure 7; Cross section of Kestrel Au MRE blocks within an optimised pit shell
7
ASX ANNOUNCEMENT
11 October 2023
Figure 8: Long sectional view of gold intercepts and gold and lithium block models at Mt Ida colored by grade looking to the east
Next steps for the Mt Ida Lithium Project
Grade control drilling is underway for Mt Ida with a focus on the shallow portion of the Sister Sam lithium
mineralisation as well as the adjacent gold mineralisation, to enable detailed mine plannning to feed into
operational planning for early works.
Resource drilling is progressing with diamond drill rigs for the purpose of converting the remaining lithium
and gold Inferred Mineral Resoures above the 0m RL elevation, for inclusion in future resource updates.
Significant potential for additional gold resources exists outside of the area where gold has already been
identified as shown in Figure 8.
Metallurgical testwork to date on Mt Ida core has returned global lithia recoveries for a whole-of-ore flotation
flowsheet of 76 - 83% for both concentrate products. The sale or toll treatment of a gold ore is set to provide
a third revenue stream in addition to the anticipated lithia concentrate products which would be produced
from the base-case process flowsheet.
Feasibility studies are underway for the longer-term lithium concentrate project. Metallurgical drilling is
ongoing with a DFS level metallurgical testwork program to commence in the coming weeks.
Further metallurgical work will be undertaken on drill core and RC chips for gold specific studies.
Geotechnical work is progressing, focussed on potential underground and open pit mining.
Several options exist for the sale or toll treatment of gold ore in the vicinity of Mt Ida.
ENDS
8
ASX ANNOUNCEMENT
11 October 2023
Release authorised by the Board of Delta Lithium Limited.
For further information, please contact:
Delta Lithium
James Croser, Managing Director
Peter Gilford, CFO & Company Secretary
+61 8 6109 0104
info@deltalithium.com.au
Investor/Media Enquiries
Citadel-MAGNUS
Michael Weir +61 402 347 032
Jono van Hazel +61 411 564 969
About Delta Lithium
Delta Lithium (ASX: DLI) is an exploration and development company focused on bringing high-quality, lithium-bearing pegmatite deposits, located
in Western Australia, into production. With a strong balance sheet and an experienced team driving the exploration and development workstreams,
Delta Lithium is rapidly advancing its Mt Ida Lithium Project towards production. The Mt Ida Lithium Project holds a critical advantage over other lithium
developers with existing Mining Leases in place. To capitalise on the prevailing buoyant lithium market, Delta Lithium is pursuing a rapid development
pathway to unlock maximum value for shareholders.
Delta Lithium also holds the highly prospective Yinnetharra Lithium Project that is already showing signs of becoming one of Australia’s most exciting
lithium regions. The Company is currently undergoing an extensive 400 drill hole campaign to be completed throughout 2023.
Competent Person's Statement
Information in this Announcement that relates to exploration results is based upon work undertaken by Mr. Charles Hughes, a Competent Person
who is a Member of the Australasian Institute of Mining and Metallurgy (AusIMM). Mr. Hughes has sufficient experience that is relevant to the style
of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a ‘Competent Person’ as defined
in the 2012 Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’ (JORC Code). Mr. Hughes
is an employee of Delta Lithium Limited and consents to the inclusion in this announcement of the matters based on his information in the form and
context in which it appears.
The information in this report which relates to Mineral Resources for the Sister Sam, Timoni and Sparrow deposits at the Mt Ida Lithium Project was
prepared by Ms Susan Havlin and reviewed by Dr Andrew Scogings, both employees of Snowden Optiro. Ms Havlin is a Member and Chartered
Professional of the Australasian Institute of Mining and Metallurgy and Dr Scogings is a Member of the Australian Institute of Geoscientists (RPGeo
industrial minerals) and they have sufficient experience relevant to the style of mineralisation, the type of deposit under consideration and to the
activity undertaken to qualify as Competent Persons as defined in the 2012 edition of the ‘Australasian Code for Reporting of Exploration Results,
Mineral Resources and Ore Reserves’. Ms Havlin and Dr Scogings consent to the inclusion of the information in the release in the form and context
in which it appears.
The information in this report which relates to Mineral Resources for the Western Lode and Kestrel gold deposits at the Mt Ida Lithium Project was
prepared by Michael Andrew an employee of Snowden Optiro. Mr Andrew is a Fellow of the Australasian Institute of Mining and Metallurgy and
and has sufficient experience relevant to the style of mineralisation, the type of deposit under consideration and to the activity undertaken to qualify
as Competent Persons as defined in the 2012 edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore
Reserves’. Mr Andrew consents to the inclusion of the information in the release in the form and context in which it appears.
Refer to www.deltalithium.com.au for past ASX announcements.
Bibliography
Mt Ida Lithium Mineral Resource Estimate Upgrade. ASX announcement 2 October 2023.
Complementary High Grade Gold at Mt Ida. ASX announcement 4 September 2023
Drilling update for Mt Ida Lithium. ASX announcement 8 August 2023.
Further Outstanding Gold Assays including 7m @ 15.3g/t Au. ASX announcement 27 July 2022
Further Outstanding drill Assays inc. 5.6m @ 52.7 g/t Au. ASX announcement 27 June 2022
Mt Ida - A New Lithium Province (Historic results. ASX announcement 28 September 2021
Mt Ida Acquisition, Capital Raise and Presentation. ASX announcement 7 September 2021.
9
ASX ANNOUNCEMENT
11 October 2023
Appendix 1: Section 5.8 Geological Interpretation and Estimation Parameters
The following is a material information summary relating to the Mineral Resource estimate, consistent with ASX Listing
Rule 5.8.1 requirements. Further details are provided in the JORC Code Table 1 (Appendix 3).
Location, geology and geological interpretation
Delta’s Mt Ida Lithium Project (Mt Ida or the Project) is located 350 km northwest of Kalgoorlie in the Eastern Goldfields
region of Western Australia. Project tenements are 100% owned by wholly owned subsidiaries of Delta Lithium Ltd
and cover approximately 170km2 of the Mt Ida-Ularring Greenstone Belt, with multiple granted prospecting,
exploration, and mining licences. The Mineral Resources are located within M29/002, M29/165 and M29/422 (Figure
1, Figure 2).
The Project is situated in the Archaean Mt Ida-Ularring Greenstone Belt within the Kalgoorlie Terrane of the Yilgarn
Craton. Lithium mineralisation is hosted within shallow to moderate north-west dipping pegmatites which intrude a
thick package of upper greenschist-lower amphibolite facies with metamorphosed, steeply south-west dipping, mafic
volcanics and intrusives. Pegmatites within the area of interest are preferentially hosted within a thick anorthositeleucogabbro unit. This has occurred due to the brittle nature of the coarse-grained stratigraphy which has allowed
existing structures to be exploited and hydraulically fractured creating optimal conditions for pegmatite development
and subsequent emplacement (Figure 4).
The area has undergone strong folding and deformation with two large anticlines present within the area; the Mt Ida
Anticline and the Kurrajong Anticline with major shear zones located between the anticlines and a noticeable absence
of a syncline. It is this complex structural history that, particularly along the Timoni trend that has resulted in the GoldCopper endowment we see today. There is a distinct interaction between these Gold related shear structures and the
pegmatites (Figure 3, Figure 5, Figure 6, Figure 8)
Gold mineralisation has been identified in numerous prospects throughout the project area. The mineralisation is
hosted in lodes and exhibits the following characterisitics:
•
•
•
•
•
Form in shearzones that dip steeply to the South West and associated flat south west dipping shear zones that
form betwee the steeper shear zones
Associated with quartz veining, silica alteration of country rock, sulphide development
Range in thickness from from about 0.5 to 12 m
Gold as fine free gold coating sulphide species, dominantly pyrrohtite, chalcopyrite and pyrite
Gangue minerals for the gold lodes are mainly quartz chlorite, biotite, albite, hornblende
Lithium mineralisation has been identified at three deposits: Sister Sam, Timoni and Sparrow. The mineralisation is
hosted within pegmatites that exhibit the following characteristics:
•
•
•
•
•
•
Preferentially emplaced in anorthosite-leucogabbro lithologies adjacent to a major series of shear zones.
Shallow to moderate north-westerly dips, increasing to almost vertical at the deepest extents of the Sister Sam
and Timoni deposits.
Pegmatite bodies have been intersected to around 1,000 m down dip and extend to about 150 m along strike.
Range in thickness from from about 2 to 35 m
Lithium-bearing minerals include spodumene, lepidolite and trilithionite
Gangue minerals are mainly quartz and albite, with some microcline and muscovite
Mineralisation wireframes were interpreted using Leapfrog Geo 3D software, with graphical selection of intervals used
to form vein models of the mineralisation for all projects. Continuity and plunge orientations were established by
applying the structural measurements collected from oriented diamond core, surface mapping, regional interpretation
of the structural setting and exploratory data analysis. Weathering surfaces were interpreted using regolith logging
data.
10
ASX ANNOUNCEMENT
11 October 2023
Drilling techniques
The drilling database used to define the Mineral Resource comprises 423 reverse circulation (RC) drillholes for a total
of 49,355 m, 65 RC holes with diamond tails (RCD) for a total of 21,910 m and 43 diamond holes (DD) for a total of
7163 m (Table 5). Aircore (AC), and rotary air-blast (RAB) drillholes were used to aid in geological interpretation;
however, samples collected by AC and RAB were not used in the MRE.
Delta drilling comprised RC drilling used a 143 mm face-sampling hammer bit. Diamond core was drilled using HQ2
and NQ2 bits. Drilling is generally spaced at 40 m by 40 m out to 80 m by 80 m. Delta has drilled 178 drill holes for
35,619m since acquisition of the project in 2021.
Historic drilling completed by other companies prior to Delta had limited or no QAQC available. As such if the MRE
was informed by historic data it was classified as Inferred Resources. The Kestrel MRE was informed by only historic
data. The Western Lodes were informed by Delta and historic drilling. Material historic results have previously
disclosed to the market as outlined in the bibliography to this announcement.
Table 5: Drilling history at the Mt Ida Lithium deposit – within gold resource area
Company
QUEEN
MARGARET
SPARGOS
VALIANT
G&M Exploration
Year
Drill
type
1980
DD
6
1,079
1988
19811982
19861988
1992
RC
19
579
DD
2
432
RC
17
539
RC
50
2,525
DD
6
757
RC
94
14,654
DD
4
365
RC
49
2,337
RCD
1
82
DD
4
1,190
RC
55
13,860
DD
3
899
RC
12
1,262
DD
4
241
RC
23
1086
RC
2
280
RCD
2
642
RC
13
2,549
RC
37
5,956
RCD
56
18,198
DD
9
1628
HAMILL
20012002
HAWK
19851987
IGL
20032004
La Mancha
20062007
NORGOLD
1988
OBM
2020
2021
Delta
2022
2023
Total
Metres
drilled
Number of drillholes
RC
52
3728
RCD
6
2,988
DD
5
572
531
78,428
11
ASX ANNOUNCEMENT
11 October 2023
Sampling and assaying
RC samples were passed through an in-line cone splitter and 2-3 kg samples collected from 1m intervals. Delta
diamond core was logged in detail, with observations based on lithological boundaries. Half core samples were taken,
generally on 1m intervals or on geological boundaries where appropriate (minimum of 0.3 m to maximum of 1.1 m).
DD sampling is undertaken by lithological/alteration domain to a maximum of 1.1m and a minimum of 0.3m. Core is
cut in half with one half sent to the lab and one half retained in the core tray. Occasional wet RC samples were
encountered, extra cleaning of the splitter was carried out afterward. RC and DD samples have been analysed for Au
by 50g fire assay by ALS, Nagrom, NAL and SGS, and via photon assay by ALS. Samples analysed by via fire assay
at ALS, Nagrom, NAL and SGS were dried, crushed and pulverised to 80% passing 75 microns before undergoing a
selected peroxide fusion digest or 4 acid digest with ICPMS finish or fire assay with ICPMS finish
Samples analysed via photon assay at ALS are dried and crushed to 3mm with 500g of material utilised for the
analysis. RC duplicate field samples were carried out at a rate of 1:20 and were sampled directly from the splitter on
the rig. These were submitted for the same assay process as the primary samples and the laboratory are unaware of
such submissions.
Historic chip sampling methods include single metre riffle split and 4m composites that were either scoop or spear
sampled, while historic core was cut onsite and half core sampled
Historic samples were analysed at LLAS, Genalysis and unspecified laboratories
Historic Au analysis techniques generally included crushing, splitting if required, and pulverisation, with aqua regia or
fire assay with AAS finish used to determine concentration.
Field blanks and industry certified standards were inserted by Delta at a rate of 1 per 20 samples and field duplicates
for RC were collected by Delta at a rate of 1 every 60 samples. No drill core duplicates have been completed at this
stage. Laboratory Certified Reference Materials (CRMs) and/or in-house controls, blanks, splits and replicates were
analysed with each batch of samples by the laboratory. Selected samples were re-analysed to confirm anomalous
results.
Metallurgy
Testwork undertaken in 2010 on Mt Ida mineralised material provided the basis for a recovery of 92 % to be used to
assess the potential of the depòsit to be mined and processed. The test work included some samples with elevated
copper grades which flagged the possibility of a flotation stage to manage the presence of copper in the form of
chalcopyrite. It is consdiered that the copper grades could be managed by blending to Good gravity gold recoveries
were obtained (54%) and a derated value of 40% was considered to be appropriate at the plant scale. .
Bulk density
Bulk density was measured from 2,896 core samples from diamond drillholes using Archimedes measurements. The
majority of the measurements are from fresh rock. Dry bulk density factors, assigned by rock type and weathering,
have been applied to generate resource tonnages.
Estimation methodology
Grade estimation was into parent blocks of 5 m(E) x 10 m(N) x 10 m(RL). Block dimensions were selected from kriging
neighbourhood analysis and reflect the variability of the deposit as defined by the current drill spacing. Sub-cells, to a
minimum dimension of 1 m(E) x 1 m(N) x 1 m(RL), were used to represent volume. Assay data was selected within
the modelled lode wireframes and composited to one metre lengths grade caps ranging from 1 g/t Au gto 32 g/t Au
appliedon a lode by lode basis. Block grade estimation of Histgold and copper by lode was completed using ordinary
12
ASX ANNOUNCEMENT
11 October 2023
kriging (OK) into parent block cells. Gold and copper were estimated independently. Variogram analyses were
undertaken to determine the grade continuity and the kriging estimation parameters used for the OK. Hard grade
boundaries were applied to the estimation of each lode. A two stage approach was undertaken to estimate the Western
Lodes, a first pass using only Delta drill data was undertaken Any uninformed blocks were then estimated with both
Delta and històric drill data. Blocks informed on this pass were flagged as Inferred Resources. The Kestrel lodes were
informed by only historic data and were classified as Inferred Resources.
Cut-off grades
The Mineral Resource estimates for the Mt Ida gold resources have been reported above a cut-off grade of 0.5 g/t Au
and 1.5 g/t Au to represent the portion of the Mineral Resource that may be considered for eventual economic
extraction by combined open pit and potential underground methods respectively. The cut-off grades selected by Delta
in consultation with Snowden Optiro based on current experience and in-line with cut-off grades applied for reporting
of similar gold resources elsewhere in Australia. Given the stage of the Project and classification applied to the Mineral
Resource, the cut-off grades are considered reasonable.
Mining factors
The Mineral Resource has been reported under conditions where the Company believes there are reasonable
prospects of eventual economic extraction through a combination of open pit and potential underground mining
methods. Open pit resources have been reported within optimised pit shells based on a gold price of US$2,000/oz
(0.60 AUD exchange rate), 92% gold recovery, mining cost AUD$6.50/t, process cost AUD$12/t and nominal 45
degree slopes, at a cut-off grade of 0.5 g/t Au. Underground resources are reported at a cut-off of 1.5 g/t Au on
mineralisation below the optimised pit shells. No consideration to the mining of the lithium resources has been
incorportated in the open pit optimisation of the gold resources. Historic production from the Western Lodes is
approximately 265 kOzs gold at a grade of 16.3 g/t Au. A release on the Delta website dated 7 September 2021
references a Mineral Resource reported under the JORC Code 2004. The MRE being reported by Delta in accordance
with the JORC 2012 Code is materially different to the historic estimate reflecting the drilling completed by Delta since
2021.The production data is likely to be based on a higher cut-off used to define the lodes, but supports the MRE
being reported by Delta.
Metallurgical factors or assumptions
An approximate metallurgical recovery of 92% has been assumed in determining reasonable prospects of eventual
economic extraction, based on historic testwork which calculated a gold recovery of 96 %.
Mineral Resource classification
The Mineral Resource has been classified following the guidelines of the Australasian Code for Reporting of
Exploration Results, Mineral Resources and Ore Reserves, 2012 (the JORC Code). The Mineral Resource has been
classified as Indicated and Inferred on the basis of confidence in geological, grade and mineralogical continuity and
by taking into account the quality of the sampling and assay data, and confidence in estimation of the gold grade. The
classification criteria were assigned based on the robustness of the grade estimate as determined from the drillhole
spacing, geological (including mineralogy) confidence and grade continuity.
The Western Lode Indicated Mineral Resources are supported by drilling with a nominal 40 m by 20 m to 80 m by 40
m spacing and where geological and grade continuity is demonstrated and only Delta drill data has been used to
inform the MRE. Inferred Mineral Resources are defined where drilling is at a wider spacing than used for definition of
Indicated Mineral Resources and historic data was used to inform the MRE.
13
ASX ANNOUNCEMENT
11 October 2023
Appendix 2: Drill hole details for new holes reported in this release
HoleID
Depth
East
North
RL
Azi
Dip
AURD002
129.9
253174
6778723
471
61.03
-79.37
GWV086_036
50
253568
6778318
473
58.74
-60.53
GWV086_046
55
253583
6778315
473
59.42
-60.83
GWV086_047
60
253574
6778310
473
60.41
-60.15
GWV086_049
66
253557
6778300
473
59.24
-60.73
GWV086_050
66
253548
6778295
473
59.4
-60.9
GWV086_058
54
253583
6778304
473
58.93
-58.12
GWV086_059
60
253576
6778299
473
59.1
-60.47
GWV086_060
72
253556
6778286
472
59.6
-59.95
GWV086_061
54
253555
6778286
473
58.61
-69.99
GWV086_063
85
253553
6778283
473
0
-90
GWV086_065
50
253596
6778301
473
60.37
-60.56
GWV086_066
41
253594
6778299
473
59.68
-78.56
GWV086_067
66
253567
6778282
473
54.14
-57.19
GWV086_068
70
253563
6778280
473
58.98
-60.36
GWV086_076
67
253569
6778272
474
59.26
-55.14
GWV086_087
78
253568
6778264
474
64.63
-53.34
GWV086_088
78
253565
6778264
474
68.82
-60.83
GWV086_089
72
253559
6778254
474
59.4
-58.29
GWV086_096
102
253580
6778245
474
44.19
-55.28
GWV086_097
78
253567
6778244
474
54.14
-57.19
GWV086_124
78
253568
6778236
474
59.94
-50.71
GWV086_132
72
253613
6778242
474
359.3
-50.52
IDRD243N2
807.1
252654.6
6779307
469.49
149.56
-50.68
IDRD249
967.2
252500.8
6778458
476.55
87.34
-50.27
IDRD259
60
252635
6779599
467
54.29
-60.3
IDRD260
78
252616
6779585
467
52.94
-60.36
IDRD262
72
252633
6779565
467
54.99
-60.46
IDRD265
78
252645
6779534
467
51.84
-60.35
IDRD266
114
252626
6779520
468
52.88
-60.64
IDRD269
96
252664
6779511
468
53.83
-60.09
IDRD273
84
252678
6779486
468
51.82
-60.54
IDRD277
96
252697
6779456
468
52.76
-61.03
IDRD282
70
252670
6779402
468
52.45
-61.04
LSEX001
270
253713.5
6777955
475.34
159
-52.27
LSEX002
300
253876.2
6777569
478
151.25
-48.21
TIRD070
622.2
252537.3
6779293
469.723
155.45
-61.11
Note: See Table 4 for assay results.
14
ASX ANNOUNCEMENT
11 October 2023
Appendix 3: JORC Code, 2012 Edition
The following table provides a summary of important assessment and reporting criteria used for the reporting of the Mt Ida Lithium
Project Mineral Resource in accordance with the Table 1 checklist in The Australasian Code for the Reporting of Exploration
Results, Mineral Resources and Ore Reserves (The J
Share your feedback
Discover