Mt Ida Exploration Update
Released
Released
Announcement PDF
ASX ANNOUNCEMENT
14 November 2024
Activities Update from Mt Ida Gold Project
Highlights:
•
Fully permitted Baldock Area resources continue to grow through current drilling programs
•
Initial focus is expanding the current Baldock gold resource which sits at 4.8Mt @ 4.4g/t Au for
674,000 oz
•
The first batch of extensional drilling results from Stage 1 include;
o
2m @ 9.3g/t Au from 83m in IDRD309
o
5m @ 4.7 g/t from 38m in IDRD321
o
2m @ 4.1g/t Au from 31m in IDRD352
o
1m @ 8.8g/t Au from 308m in IDRD327
o
o
•
1m @ 6.5g/t Au from 197m in IDRD310
-
Including 2m @ 10.3g/t Au from 38m
1m @ 9.3 g/t Au from 140m in IDRD330
Project Development activities continue with Works Approval process underway and hydro drilling
commencing
Delta Lithium Limited (ASX: DLI) (“Delta” or the “Company”), is pleased to provide an update for the
ongoing exploration activities at its 100% owned Lithium and Gold Mt Ida Project in the Goldfields region of
Western Australia. The Mt Ida Project gold resource is “shovel ready’ and the ongoing drill programs aim to
grow the resource base to standalone scale while development activities progress concurrent with a
Strategic Review. The Strategic Review is assessing the best path to deliver shareholder value from the
gold resource and is in line with Delta’s principal focus on its lithium assets.
Recent drilling at Baldock continues to provide high-grade results extending known mineralisation both
along strike and at depth. In particular, these initial results have confirmed shallow, high-grade continuous
mineralisation 300m South of the Baldock 086 resource. Recent highlights can be seen below in Figure 1,
with a full list of results in Appendix 3.
Commenting on the results Managing Director, James Croser said;
“Stage 1 results from this drilling campaign have delivered positive, shallow extensions, north and south of
the current resources at Baldock, with that resource remaining open at the surface extents. These
highlighted holes are expected to represent modest additions to the current resource model.
We will now shift our focus towards advancing Stage 2 and 3 of the drilling campaign, targeting deeper
mineralisation that is of higher-grade material proximal to the anticipated mining areas at Baldock. The
current program is expected to break over the Christmas period and recommence in early January with an
expected completion in the first quarter of calendar year 2025 after the planned regional phase.
The team’s exploration success throughout the year has provided us the opportunity to complete further
drilling at Mt Ida concurrent with our strategic review. I am very proud of the tireless effort by our exploration
team and look forward to providing further updates to the market as we continue to execute on our key
objective of growing the existing resource.”
1.
Refer ASX Announcement 3 October 2023 titled ‘Mt Ida Mineral Resource Estimate Update’
2.
Refer to Appendix 1 for full drill hole information
ASX ANNOUNCEMENT
14 November 2024
Mount Ida Activities Update
Mt Ida is located approximately 240km north of Kalgoorlie in Western Australia. The Project area resides
on granted mining leases and is fully permitted for commencement of open pit and underground mining at
Baldock. One reverse circulation (RC) rig and one Diamond Drill (DD) rig are currently operating at the
project carrying out resource extensional and exploration programs.
Figure 1: Location of Mount Ida Project
The Company is undertaking a four-stage drill program consisting of approximately 35-40,000 drill metres
including both RC and diamond drilling at Baldock, then regional RC drilling across the wider Mt Ida tenure
including Kestrel and Golden Vale. Stage 1 is almost complete, and Stages 2 & 3 are underway. Stage 2
will aim to further extend the existing JORC resources at Baldock and Kestrel while Stage 3 is focusing on
deeper high-grade chutes at Baldock via diamond drilling from RC pre-collars.
The first batch of assays have been returned which are highlighted in Figure 2 below. Drilling to date has
demonstrated continuity and confirmed the extension of mineralisation beyond the current MRE, both along
strike and at depth. In particular, recent results following up on historical drilling has confirmed shallow,
high-grade mineralisation to the South of Baldock.
ASX ANNOUNCEMENT
14 November 2024
Figure 2: Section showing historic and new Significant Intersections proximal to the Baldock resource
Upon completion of Stages 2 & 3, the RC rig will commence Stage 4 to complete first pass drilling programs
across the highest priority regional prospects (Figure 3), all of which are within a 12km radius of the Baldock
hub. These initial programs will aim to delineate further resources from five regional prospects across the
Mt Ida tenure with many other prospects to be tested in future. Current planned programs are anticipated
to be completed by early CY25 which will be followed by an updated gold Mineral Resource Estimate for
the Mt Ida Project.
Project development studies are progressing well with the current focus on;
• Submittal of a Works Approval for a Processing Plant & Tails Storage Facility (Integrated Waste
Landform)
• PFS UG Geotechnical Assessment
These work streams are being completed alongside current programs with the intention to have all
modifying factors at or above PFS level to support the release of a maiden reserve statement by Mid CY25.
ASX ANNOUNCEMENT
14 November 2024
Figure 3: Plan showing the potential Baldock mining hub, surrounding JORC Resources and planned
regional drilling
Strategic Review
The Company is currently conducting a Strategic Review of the Mt Ida gold asset, led by Bell Potter with the aim
of establishing the optimal pathway forward, and to maximise shareholder value in the current strong gold price
environment.
This process is anticipated to be completed in coming weeks with the Board using the outcome of the Review
to determine next steps.
ASX ANNOUNCEMENT
14 November 2024
Next Steps
•
•
•
•
•
•
Complete Stages 2 - 4 of drilling
Complete Strategic Review and assess results
Carry out geological modelling & release an updated Au MRE
Complete infill resource conversion drilling
Increase Geotechnical UG assessment to PFS level
Release of a PFS and a Maiden Reserve Statement CY25
Release authorised by the Managing Director on behalf of the Board of Delta Lithium Limited.
For further information, please contact:
Delta Lithium
James Croser, Managing Director
Peter Gilford, CFO & Company Secretary
+61 8 6109 0104
info@deltalithium.com.au
Investor/Media Enquiries
Sodali & Co
Michael Weir +61 402 347 032
About Delta Lithium
Delta Lithium (ASX: DLI) is an exploration and development company focused on bringing high-quality, lithium-bearing pegmatite deposits, located
in Western Australia, into production. With current global JORC compliant resources of 40.4Mt@1.1%Li2O, strong balance sheet and an
experienced team driving the exploration and development workstreams, Delta Lithium is rapidly advancing its Lithium Projects. The Mt Ida Lithium
Project holds a critical advantage over other lithium developers with existing Mining Leases and an approved Mining Proposal. Delta Lithium is
pursuing a development pathway to unlock maximum value for shareholders.
Delta Lithium also holds the highly prospective Yinnetharra Lithium Project that is already showing signs of becoming one of Australia’s most
exciting lithium regions. The Company has recommenced exploration activities at Yinnetharra in the new calendar year, and an extensive multi-rig
campaign will be ongoing throughout 2024 to test additional targets and build on the Maiden Resource released in December 2023.
Competent Person's Statement
Information in this Announcement that relates to exploration results is based upon work undertaken by Mr. Shane Murray, a Competent Person
who is a Member of the Australasian Institute of Geosciences (AIG). Mr. Murray has sufficient experience that is relevant to the style of mineralisation
and type of deposit under consideration and to the activity which he is undertaking to qualify as a ‘Competent Person’ as defined in the 2012 Edition
of the ‘Australasian Code for Reporting of Exploration Results. (JORC Code). Mr. Murray is an employee of Delta Lithium Limited and consents to
the inclusion in this announcement of the matters based on his information in the form and context in which it appears.
Refer to www.deltalithium.com.au for past ASX announcements.
Past Exploration results and Mineral Resource Estimates reported in this announcement have been previously prepared and disclosed by Delta
Lithium in accordance with JORC 2012. The Company confirms that it is not aware of any new information or data that materially affects the
information included in these market announcements. The Company confirms that the form and content in which the Competent Person's findings
are presented here have not been materially modified from the original market announcement, and all material assumptions and technical
parameters underpinning Mineral Resource Estimates in the relevant market announcement continue to apply and have not materially changed.
Refer to www.deltalithium.com.au for details on past exploration results and Mineral Resource Estimates.
Disclaimer
This release may include forward-looking and aspirational statements. These statements are based on Delta Lithium management’s expectations
and beliefs concerning future events as of the time of the release of this announcement. Forward-looking and aspirational statements are necessarily
subject to risks, uncertainties and other factors, some of which are outside the control of Delta Lithium, which could cause actual results to differ
materially from such statements. Delta Lithium makes no undertaking to subsequently update or revise the forward looking or aspirational statements
made in this release to reflect events or circumstances after the date of this release, except as required by applicable laws and the ASX Listing
Refer to www.deltalithium.com.au for past ASX announcements.
ASX ANNOUNCEMENT
14 November 2024
Appendix 1 Lithium MRE summary table
Delta Lithium Group Mineral Resource estimate
Cut-off
Resource category
Li2O
Ta2O5
grade
Tonnes
Grade
Li2O
Grade
(Li2O%)
(Mt)
(% Li2O)
(Kt)
(Ta2O5 ppm)
-
-
-
-
6.7
1.0
65
51
19.0
1.0
181
67
Total Resource
25.7
1.0
246
62
Measured
-
-
-
-
7.8
1.3
104
224
6.8
1.1
76
154
14.6
1.2
180
191
Total Measured
-
-
-
-
Total Indicated
14.5
1.2
169
144
Total Inferred
25.8
1.0
257
90
Total
40.4
1.1
426
109
Measured
Indicated
Yinnetharra
0.5
Inferred
Indicated
Mt Ida
0.5
Inferred
Total Resource
Notes:
Tonnages and grades have been rounded to reflect
estimate. Inconsistencies in the totals are due to rounding.
the
relative
uncertainty
of
the
Appendix 2 Mt Ida Gold MRE summary table
Indicated
Cut off
Open Pit Au
0.5 g/t
0.0 g/t Au
Cut off
Underground
1.5 g/t Au
Deposit
Inferred
Tonnes
Grade
Ounces
Tonnes
Grade
Ounces
Tonnes
Grade
Ounces
(000s)
g/t Au
(000s)
(000s)
g/t Au
(000s)
(000s)
g/t Au
(000s)
Baldock
1,345
4.9
209.0
1,512
3.2
158
2,857
4.0
367
Kestrel
-
-
-
570
1.6
29
570
1.6
29
Golden Vale
-
-
-
496
1.7
27
496
1.7
27
Mt Ida Tailings
-
-
-
500
0.5
8
500
0.5
8
Baldock
180
5.8
33.0
1,780
4.8
274
1,960
4.9
307
Kestrel
-
-
-
220
1.9
14
220
1.9
14
Golden Vale
-
-
-
-
-
-
-
-
-
500
0.5
8
500
0.5
8
Mt Ida Tailings
All
Total
Baldock
1,525
4.9
242.0
3,292
4.1
432
4,817
4.4
674
Kestrel
-
-
-
790
1.7
43
790
1.7
43
Golden Vale
-
-
-
496
1.7
27
496
1.7
27
1,525
4.9
242.0
5,078
3.1
510
6,603
3.5
752
Total
Notes:
Tonnages and grades have been rounded to reflect the relative uncertainty of the estimate. Inconsistencies
in the totals are due to rounding.
ASX ANNOUNCEMENT
14 November 2024
Appendix 3 Recent Drilling Information
HoleID
IDRD306
and
and
IDRD307
IDRD308
and
and
IDRD309
and
and
and
IDRD310
and
and
nsi
IDRD311
IDRD311A
IDRD312
nsi
IDRD312A
and
and
and
IDRD313
IDRD314
and
IDRD315
nsi
IDRD316
nsi
IDRD317
IDRD318
nsi
IDRD319
and
IDRD320
and
IDRD321
Including
IDRD322
nsi
IDRD323
nsi
IDRD324
and
IDRD325
IDRD326
and
IDRD327
and
and
From
17
42
52
60
55
60
96
83
115
128
135
97
105
197
To
18
43
53
68
56
61
99
85
118
129
141
98
106
198
Length
1
1
1
8
1
1
3
2
3
1
6
1
1
1
Au gpt
0.55
0.62
0.78
1.16
0.79
1.87
0.76
9.3
1.13
0.84
0.6
1.22
0.62
6.53
Cu ppm
313
6710
631
595
8190
1490
505
1966
270
568
744
147
241
555
125
127
2
1.06
191
148
157
166
174
189
24
146
150
161
168
175
190
25
147
2
4
2
1
1
1
1
3.33
2.04
2.58
0.95
3.42
0.53
1.13
2645
601
857
1205
273
84
408
174
175
1
0.86
132
20
60
23
40
38
38
21
61
24
44
43
40
1
1
1
4
5
2
1.19
0.56
0.91
1.77
4.66
10.3
11
97
65
153
241
163
94
171
210
252
261
155
242
164
95
173
211
253
262
2
1
1
1
2
1
1
1
1.89
2.8
0.56
0.85
1.31
1.16
0.56
0.68
653
2400
377
633
75
570
135
3650
1615
ASX ANNOUNCEMENT
14 November 2024
HoleID
and
and
Including
and
IDRD328
and
and
IDRD329
IDRD330
IDRD331
IDRD332
and
IDRD333
IDRD334
IDRD335
IDRD336
and
Assays pending
nsi
and
and
IDRD337
IDRD338
IDRD339
IDRD340
IDRD341
nsi (Pre-collar)
nsi (Pre-collar)
nsi (Pre-collar)
and
and
IDRD342
IDRD343
IDRD344
IDRD345
IDRD346
IDRD347
IDRD348
Including
nsi
and
and
IDRD349
and
and
IDRD350
IDRD351
IDRD352
Including
IDRD353
and
From
299
307
307
333
129
178
241
123
140
266
42
78
244
266
To
301
310
308
338
131
179
245
124
141
268
44
80
248
267
Length
2
3
1
5
2
1
4
1
1
2
2
2
4
1
Au gpt
2.29
3.31
8.8
1.61
0.94
0.91
1.64
0.53
9.26
3.25
0.82
1.7
0.98
2.81
Cu ppm
1850
466
61
396.8
470.66
451.32
62
400.7
471.35
452.78
1
3.9
0.69
1.46
0.77
1.67
1.94
2.63
389
187
295
476
0
160
208
212
69
79
80
4
161
209
220
70
82
81
4
1
1
8
1
3
1
0.95
1.76
0.91
0.76
0.96
2.42
5.44
759
1075
39
123.5
504
807
63
29
19
49
64
187
192
201
71
82
31
31
94
103
64
30
20
50
65
188
193
202
72
83
41
32
95
104
1
1
1
1
1
1
1
1
1
1
10
2
1
1
1.11
2.59
0.93
1.14
1.45
1.94
0.53
0.91
3.01
1.52
1.61
4.3
1.23
0.79
826
1885
31
590
692
632
1435
501
947
903
1714
728
434
267
537
686
186
1578
731
209
76.5
876
124
66
ASX ANNOUNCEMENT
14 November 2024
HoleID
and
and
and
IDRD354
and
IDRD355
IDRD356
IDRD357
IDRD358
IDRD359
IDRD360
IDRD361
nsi (Pre-collar)
nsi (Pre-collar)
nsi (Pre-collar)
and
and
nsi (abandoned)
IDRD362
IDRD362A Assays pending
IDRD363
and
Assays pending
IDRD364
Assays pending
IDRD365
Assays pending
IDRD366
Assays pending
IDRD367
Assays pending
IDRD368
Assays pending
IDRD369
Assays pending
IDRD370
Assays pending
IDRD371
Assays pending
IDRD372
Assays pending
IDRD373
Assays pending
IDRD374
Assays pending
IDRD375
Assays pending
IDRD376
From
173
176
183
125
137
135
157
To
175
177
184
128
138
136
159
Length
2
1
1
3
1
1
2
Au gpt
2.51
4.37
2.4
0.98
0.55
1.79
1.1
Cu ppm
1032
149
2190
153
157
4
1.25
46
68
192
268
51
70
194
270
5
2
2
2
1.5
2.99
0.92
0.86
152
178
190
179
191
1
1
1.08
0.94
307
588
ASX ANNOUNCEMENT
14 November 2024
Appendix 4 Drillhole Collar Information
HOLEID
IDRD306
IDRD307
IDRD308
IDRD309
IDRD310
IDRD311
IDRD311A
IDRD312
IDRD312A
IDRD313
IDRD314
IDRD315
IDRD316
IDRD317
IDRD318
IDRD319
IDRD320
IDRD321
IDRD322
IDRD323
IDRD324
IDRD325
IDRD326
IDRD327
IDRD328
IDRD329
IDRD330
IDRD331
IDRD332
IDRD333
IDRD334
IDRD335
IDRD336
IDRD337
IDRD338
IDRD339
IDRD340
IDRD341
IDRD342
IDRD343
IDRD344
IDRD345
IDRD346
DEPTH
EAST
NORTH
132 252436.8
6779893
150 252416.5
6779880
132 252415.7
6779924
150 252395.5
6779911
240 252372.5
6779903
90 252341.3
6779876
222 252346.8
6779880
25 252383.3
6779756
204 252388.4
6779760
210
252373
6779812
210
252482
6779560
84
252477
6779379
210
252413
6779325
228
252433
6779262
264
252671
6778583
108
253732
6777994
150
253700
6777945
72
253765
6777948
96
253778
6777858
102
253822
6777772
270
253460
6778033
324
253419
6778001
276
253510
6777985
378
253451
6777943
264 253358.1
6778345
240 252565.9
6779256
252 252631.3
6779213
312 252693.5
6779104
307 252739.2
6779057
330 253369.3
6777995
228
253412
6777910
258 253613.9
6777939
156
253144
6778407
126
253234
6777986
126
253306
6777886
276
253176
6777788
255
253103
6777734
246 253102.1
6778505
255 253040.1
6777947
132 252382.5
6779958
192
252365
6779947
228 252342.3
6779934
288
253578
6777915
RL
AZIMUTH DIP
464.979
54.63
-60.54
465.176
55.12
-61.54
464.562
55.24
-59.65
464.935
52.93
-59.98
464.967
57.75
-65.28
465.08
52.04
-64.21
465.013
358.79
0
465.987
52.69
-56.51
465.909
56.12
-61.63
465
46.2
-65.55
466.7
54.35
-56.24
468
56.09
-60.26
469
46.45
-56.73
469
68.43
-59.89
475
56.61
-60.62
474
53.81
-65.67
475
59.61
-60.09
474
106.76
-65.16
475
56.46
-61.86
476
61.6
-61.65
475
55.4
-60.61
476
55.56
-61.21
476
55.78
-60.99
476
54.93
-60.39
473.326
55.67
-58.78
469.566
55.71
-60.74
469.462
55.57
-60.77
470.297
56.53
-60.91
470.323
58.56
-60.43
475.719
62.86
-61.74
477.782
53.16
-60.1
477.597
59.92
-60.62
473
57.18
-77.71
476
54.32
-58.67
478
56.38
-57.73
479
51.62
-56.86
479
57.75
-56.83
472.67
358.79
0
477.187
61.3
-54.75
464.619
61.09
-61.07
464.634
59.35
-60.09
464.717
60.57
-59.12
483
63.4
-61.12
ASX ANNOUNCEMENT
14 November 2024
HOLEID
IDRD347
IDRD348
IDRD349
IDRD350
IDRD351
IDRD352
IDRD353
IDRD354
IDRD355
IDRD356
IDRD357
IDRD358
IDRD359
IDRD360
IDRD361
IDRD362
IDRD362A
IDRD363
IDRD364
IDRD365
IDRD366
IDRD367
IDRD368
IDRD369
IDRD370
IDRD371
IDRD372
IDRD373
IDRD374
IDRD375
IDRD376
DEPTH
EAST
NORTH
90
253766
6777950
120 253778.9
6777858
282
253727
6777725
114
253823
6777774
156
253699
6777819
144
253765
6777950
234
253665
6777905
252
252906
6778642
182
252519
6779144
276
252797
6778123
192
253317
6777784
182
253119
6777907
252
253028
6778118
240
252554
6779191
270 252492.1
6779282
44 252776.5
6778651
312
252784
6778642
288
252820
6778613
336
252667
6779078
156
252820
6778613
60
252820
6778613
96
252820
6778613
60 252400.7
6780052
108 252334.3
6780041
114
252205
6780255
264 252420.7
6779202
240 253213.2
6778363
276 252454.5
6779103
168 252446.4
6779311
324 252386.4
6779600
324
252329
6779664
RL
474
475.22
477
476
476
474
482
472
470
480
478
477
476
470
468.809
473.359
482
482
471
482
482
482
463.835
463.929
462.346
469.361
472.576
470.13
468.753
466.799
467
AZIMUTH DIP
65.77
-50.74
60.45
-51.04
61.69
-60.52
46.25
-50.78
60.86
-51.62
125.44
-50.95
74.66
-59.75
34.8
-67.3
60.99
-60.98
56.3
-50.76
57.16
-51.13
54.19
-53.39
60.9
-57.1
61.55
-58.43
62.53
-60.43
54.46
-58.24
59.78
-56.14
60.35
-60.77
63.34
-61.7
60.7
-60.78
60.5
-59.88
58.59
-60.07
59.74
-60.26
60.92
-58.11
62.14
-60.31
59.67
-60.7
57.02
-59.46
66.06
-58.7
60.92
-55.89
67.43
-61.21
62.69
-60.45
ASX ANNOUNCEMENT
14 November 2024
JORC Code, 2012 Edition
Table 1; Section 1: Sampling Techniques and Data Mount Ida
Criteria
Explanation
Sampling
techniques
Nature and quality of sampling (e.g. cut
channels, random chips, or specific
specialised industry standard measurement
tools appropriate to the minerals under
investigation, such as down hole gamma
sondes, or handheld XRF instruments, etc).
These examples should not be taken as
limiting the broad meaning of sampling.
Include reference to measures taken to
ensure sample representivity and the
appropriate calibration of any measurement
tools or systems used. Aspects of the
determination of mineralisation that are
Material to the Public Report. In cases where
‘industry standard’ work has been done this
would be relatively simple (e.g. ‘reverse
circulation drilling was used to obtain 1 m
samples from which 3 kg was pulverised to
produce a 50 g charge for fire assay’). In
other cases more explanation may be
required, such as where there is coarse gold
that has inherent sampling problems. Unusual
commodities or mineralisation types (e.g.
submarine nodules) may warrant disclosure
of detailed information
Drilling techniques
Drill type (e.g. core, reverse circulation, openhole hammer, rotary air blast, auger, Bangka,
sonic, etc) and details (e.g. core diameter,
triple or standard tube, depth of diamond tails,
face-sampling bit or other type, whether core
is oriented and if so, by what method, etc).
Commentary
•
•
•
•
•
•
•
•
•
•
•
•
Reverse circulation (RC) drilling has been carried out by
DLI at the Mt Ida Project
RC samples are collected from a static cone splitter
mounted directly below the cyclone on the rig
DD sampling, when completed is generally carried out to
lithological/alteration domains with lengths between 0.31.1m
Historical data has been supplied by the previous project
owner (Ora Banda Ltd), reverse circulation (RC) drilling
and diamond drilling has been completed at the Project..
Limited historical data has been supplied, historic
sampling has been carried out by Hammill Resources,
International Goldfields, La Mancha Resources, Eastern
Goldfields and Ora Banda Mining, and has included RC,
DD and rotary air blast (RAB) drilling
Historic sampling of RC drilling has been carried out via a
static cone splitter mounted beneath a cyclone return
system to produce a representative sample, or via scoop.
Reports suggest that historic sampling of DD core has
been completed to constrain mineralisation and to
lithological boundaries.
These methods of sampling are considered to be
appropriate for this style of exploration
Diamond drilling is generally carried out by Frontline Drilling
utilising a Sandvik DE880 truck mounted multipurpose rig
and is HQ or NQ diameter. RC drilling is carried out by
Orlando Drilling using a Schramm T685 rig
Some RC precollars will be completed, diamond tails will be
completed in the coming weeks on these holes
Historic RC drilling was completed using a T450 drill rig with
external booster and auxiliary air unit, or unspecified
methods utilising a 133mm face sampling bit
It is assumed industry standard drilling methods and
equipment were utilised for all drilling
ASX ANNOUNCEMENT
14 November 2024
Criteria
Explanation
Drill sample
recovery
Method of recording and assessing core and
chip sample recoveries and results assessed.
Measures taken to maximise sample recovery
and ensure representative nature of the
samples. Whether a relationship exists
between sample recovery and grade and
whether sample bias may have occurred due
to preferential loss/gain of fine/coarse
material.
Commentary
•
•
•
•
•
Logging
Whether core and chip samples have been
geologically and geotechnically logged to a
level of detail to support appropriate Mineral
Resource estimation, mining studies and
metallurgical studies. Whether logging is
qualitative or quantitative in nature. Core (or
costean, channel, etc) photography. The total
length and percentage of the relevant
intersections logged.
•
•
•
•
•
•
Sample condition is recorded for every RC drill metre
including noting the presence of water or minimal sample
return, inspections of rigs are carried out daily
Recovery on diamond core is generally recorded by
measuring the core metre by metre
Poor recoveries can occasionally be encountered in near
surface drilling due to the weathered nature
RC recoveries were visually estimated on the rig, bulk
reject sample from the splitter was retained on site,
generally in green bags for use in weighing and
calculating drill recoveries at a later date if required
Sample weights were recorded by the laboratory
Quantitative and qualitative geological logging of drillholes
adheres to company policy and includes lithology,
mineralogy, alteration, veining and weathering
Diamond core and RC chip logging records lithology,
mineralogy, alteration, weathering, veining, RQD, SG and
structural data
All diamond drillholes and RC chip trays are photographed in
full
A complete quantitative and qualitative logging suite was
supplied for historic drilling including lithology, alteration,
mineralogy, veining and weathering
No historic chip photography has been supplied
Logging is of a level suitable to support Mineral resource
estimates and subsequent mining studies
ASX ANNOUNCEMENT
14 November 2024
Criteria
Explanation
Sub-sampling
techniques and
sample preparation
If core, whether cut or sawn and whether
quarter, half or all core taken.
If non-core, whether riffled, tube sampled,
rotary split, etc and whether sampled wet or
dry. For all sample types, the nature, quality
and appropriateness of the sample
preparation technique.
Quality control procedures adopted for all
sub-sampling stages to maximise
representivity of samples.
Measures taken to ensure that the sampling
is representative of the in situ material
collected, including for instance results for
field duplicate/second-half sampling. Whether
sample sizes are appropriate to the grain size
of the material being sampled.
Quality of assay
data and laboratory
tests
The nature, quality and appropriateness of
the assaying and laboratory procedures used
and whether the technique is considered
partial or total. Nature of quality control
procedures adopted (e.g. standards, blanks,
duplicates, external laboratory checks) and
whether acceptable levels of accuracy (i.e.
lack of bias) and precision have been
established.
For geophysical tools, spectrometers,
handheld XRF instruments, etc, the
parameters used in determining the analysis
including instrument make and model,
reading times, calibrations factors applied and
their derivation, etc.
Commentary
DD sampling is generally undertaken by
lithological/alteration domain to a maximum of 1.1m and a
minimum of 0.3m. Core is cut in half with one half sent to
the lab and one half retained in the core tray
•
Occasional wet RC samples are encountered, extra
cleaning of the splitter is carried out afterward
•
When pegmatites are intercepted, RC and core samples
are analysed for Li suite elements by ALS Laboratories,
Samples are crushed and pulverised to 85% passing 75
microns for peroxide fusion digest followed by ICPOES or
ICPMS determination
•
When potential Au/Cu lodes are intercepted, RC and core
samples are analysed first via Photon / Fire assay
methods and then subsequently MICP61 L for the base
metal suite by ALS Laboratories, Samples are crushed
and pulverised to 85% passing 75 microns before 4 acid
digest with ICPMS finish or fire assay with ICPMS finish
•
Samples analysed via photon assay at ALS are dried and
crushed to 3mm with 500g of material utilised for the
analysis
•
To ensure a robust geochemical database and to ensure
all mineralisation haloes are captured for MRE purposes,
in some cases samples are submitted for both the Li suite
and the Photon/FA & MICP61 L. This is due to the spatial
relationship between the Au/Cu lodes and the LCT
pegmatites.
•
Historic RC sampling methods included single metre
static cone split from the rig or via scoop from the green
bags, field duplicates were manually inserted at a rate of
within the pegmatite / gold zones
•
Historic samples were recorded as being mostly dry
•
Historic samples were analysed by Nagrom or ALS
Laboratories where 3kg samples were crushed and
pulverised to 85% passing 75 microns for a sodium
peroxide fusion followed by ICP-MS determination for 25
elements.
•
Semi-Quantitative XRD analysis was carried out by
Microanalysis Australia using a representative subsample that was lightly ground such that 90% was
passing 20 µm to eliminate preferred orientation
TIMA sampling was also completed on pulverised lab
•
pulp material, this was completed to quantify the
mineralogical makeup of pegmatites in particular.
•
Various samples from across the Au/Cu orebodies were
extracted and sent to ALS laboratories for subsequent
metallurgical analysis and flowsheet development.
Samples have been analysed by an external laboratory
utilising industry accredited standard method.
The assay method utilised by ALS for core sampling allows
for total dissolution of the sample where required
Standards and blanks are inserted at a rate of 1 in 20 in RC
and DD sampling, all QAQC analyses were within tolerance
The sodium peroxide fusion used for historic assaying is a
total digest method
All historic samples are assumed to have been prepared and
assayed by industry standard techniques and methods
In the historic data field duplicates, certified reference
materials (CRMs) and blanks were inserted into the
sampling sequence at a rate of 1:20 within mineralised
zones.
Internal standards, duplicates and repeats were carried out
by Nagrom and ALS as part of the assay process
No standards were used in the XRD/TIMA process
•
•
•
•
•
•
•
•
.
•
ASX ANNOUNCEMENT
14 November 2024
Criteria
Explanation
Verification of
sampling and
assaying
The verification of significant intersections by
either independent or alternative company
personnel. The use of twinned holes.
Documentation of primary data, data entry
procedures, data verification, data storage
(physical and electronic) protocols. Discuss
any adjustment to assay data
Commentary
•
•
•
•
Location of data
points
Accuracy and quality of surveys used to
locate drill holes (collar and down-hole
surveys), trenches, mine workings and other
locations used in Mineral Resource
estimation. Specification of the grid system
used. Quality and adequacy of topographic
control
•
•
•
•
•
Data spacing and
distribution
Orientation of data
in relation to
geological structure
Sample security
Drill collars are located using a handheld GPS unit, all
holes will be surveyed by trained DLI personnel using a
Trimble DGPS once the program is complete
GDA94 MGA zone 51 grid coordinate system was used
Downhole surveys were completed by Frontline/Orlando
drilling using a multishot tool
Historic collars were located using handheld Garmin GPS
unit with +/- 5m accuracy
Some historic holes were not downhole surveyed,
planned collar surveys were provided
Data spacing for reporting of Exploration
Results. Whether the data spacing and
distribution is sufficient to establish the
degree of geological and grade continuity
appropriate for
Share your feedback
Discover