Major Mineral Resource Estimate (MRE) upgrade for gold at Mt Ida.
Inferred and Indicated Mineral Resources of:
6.6Mt @ 3.5 g/t Au for 752,000 ounces (at various cut-off grades see Table 1)
•
Upgrade represents an 82% increase in contained gold for the Mt Ida Project with new Mineral
Resource Estimate (MRE) prepared by External Consultant Snowden Optiro
•
82% Increase in the Baldock Deposit to 4.8Mt @ 4.4g/t gold for 674,000 ounces
•
Maiden Mineral Resource Estimate for the Golden Vale Prospect of 27,000 ounces @ 1.7g/t Au
•
Significant potential for further resource growth being tested now with drilling underway at Mt Ida
•
The Baldock Deposit becomes one of only a handful of high-grade gold deposits exceeding
500,000 ounces in Western Australia
•
Mining Approval granted for Phase 1 Open Pit mining at Mt Ida
•
The growth in the MRE presents Delta with further optionality to monetise gold assets at Mt Ida and
drive progress at Delta’s core lithium business.
•
A Scoping Level gold development study for Mt Ida is expected to be released within the coming
months
Delta Lithium Limited (ASX: DLI) (“Delta” or the “Company”), is pleased to announce an update for the
ongoing activities at its 100% owned Mt Ida Project, a shovel ready lithium and gold project, 100km west of
Leonora in the Eastern Goldfields Province of Western Australia.
The recent Mineral Resource Estimate has significantly increased the contained gold at Mt Ida,
demonstrating the presence of a large gold system.
All mineral resources at the Mt Ida Project are located on granted Mining Leases, with granted mining
approval received late in 2023. This allows the Company to start mining immediately if studies support this
outcome.
Commenting on the results Managing Director, James Croser said;
“This is a wonderful result for Delta shareholders, reaffirming our long-held belief that the gold system at Mt
Ida has significant scale and upside. The Baldock is fast becoming one of very few, large high-grade
undeveloped gold deposits in WA in excess of 500koz.
The commencement of open pit mining has been approved, and the underground approval with the
Department is submitted and pending. We are investigating the best options for Delta shareholders to
crystalise value from our gold, which can then be applied to further developing our core lithium business.
“The efforts of Delta’s Geology team have been tireless and driven toward this success. We have already
started follow up gold drilling at Mt Ida to target resource growth beyond 1Moz.”
ASX ANNOUNCEMENT
28 June 2024
Mt Ida Gold Mineral Resource Update
Snowden Optiro was contracted to undertake a Mineral Resource Estimate (MRE) for gold at the Mt Ida
Project in June 2024. The updated mineral resource estimates are for the Baldock and Golden Vale
Deposits. The Kestrel deposit Mineral Resource Estimate has not changed since Delta’s Maiden Gold MRE
Announcement on 11th October 2023. All material information pertaining to this updated resource is to be
found in Appendix 1 Material Information Summaries
Indicated
Cut off
Open cut Au
0.5 g/t
0.0 g/t Au
Cut off
Underground
1.5 g/t Au
Deposit
Inferred
Tonnes
Grade
Ounces
Tonnes
Grade
Ounces
Tonnes
Grade
Ounces
(000s)
g/t Au
(000s)
(000s)
g/t Au
(000s)
(000s)
g/t Au
(000s)
Baldock
1,345
4.9
209.0
1,512
3.2
158
2,857
4.0
367
Kestrel
-
-
-
570
1.6
29
570
1.6
29
Golden Vale
-
-
-
496
1.7
27
496
1.7
27
Mt Ida Tailings
-
-
-
500
0.5
8
500
0.5
8
Baldock
180
5.8
33.0
1,780
4.8
274
1,960
4.9
307
Kestrel
-
-
-
220
1.9
14
220
1.9
14
Golden Vale
-
-
-
-
-
-
-
-
-
500
0.5
8
500
0.5
8
Mt Ida Tailings
All
Total
Baldock
1,525
4.9
242.0
3,292
4.1
432
4,817
4.4
674
Kestrel
-
-
-
790
1.7
43
790
1.7
43
Golden Vale
-
-
-
496
1.7
27
496
1.7
27
1,525
4.9
242.0
5,078
3.1
510
6,603
3.5
752
Total
Table 1: June 2024 Mt Ida Gold mineral resource estimate Table (rounding errors may have occurred)
The update to the MRE is the result of an additional 431 drillholes for 51,604m completed by Delta
subsequent to the release of the Maiden Mt Ida Gold MRE on 11 October 2023, and 199 historical drillholes
for 11,830m at Golden Vale. Material drill results which have allowed for the update to the MRE have all
previously been released to the ASX in announcements on 10 November 2023 ‘Yinnetharra and Mt Ida
Exploration Update’ and 15 February 2024 ‘Yinnetharra and Mt Ida Exploration Update’, data pertaining to
the Golden Vale MRE is found in Appendix 2.
Material drill results used in the Maiden Mt Ida Gold MRE released on 11 October 2023 have all previously
been released to the ASX in the announcements detailed in the Bibliography.
Key changes to the Mineral Resource Estimate released on 11 October 2023 are:
•
A more conservative approach to reporting of MRE has been taken, in accordance with
Reasonable Prospects of Eventual Economic Extraction (RPEEE) guidelines to the JORC2012
Code
•
Mineralisation previously referred to as “Western Lodes” now referred to as the Baldock Deposit
•
82% Increase in the overall MRE for the Mt Ida Project from 412koz @ 4.1 g/t Au to 752koz @ 3.5
g/t Au
•
82% Increase in the overall MRE for the Baldock Deposit from 370koz to 674koz
o 17% Increase in total Indicated Resources from 206koz @ 5.7 g/t Au to 242koz @ 4.9 g/t
Au
ASX ANNOUNCEMENT
28 June 2024
o
153% Increase in open cut Resources reported into an optimised ultimate pit shell
(reported at 0.5 g/t Au cut off) from 145koz @ 5.5 g/t Au to 367koz @ 4 g/t Au
o
90% Increase in open cut Indicated Resources reported into an optimised ultimate pit shell
(reported at 0.5 g/t Au cut off) from 110koz @ 6.6g/t Au to 209koz @ 4.8g/t Au
o
36% increase in underground resources reported into optimised stopes (reported at 1.5g/t
Au cut off) from 225koz @ 4.7g/t Au to 307koz @ 4.9 g/t Au
•
Addition of maiden Golden Vale MRE of 27koz @ 1.7 g/t Au reported into an optimised ultimate pit
shell at 0.5 g/t Au cut off
•
No change to Kestrel MRE of 43koz
Figure 1: Location of Mt Ida Project
ASX ANNOUNCEMENT
28 June 2024
Figure 2: Grade tonnage curve for combined June 2024 Baldock Deposit MRE
(NB: Does not include Mt Ida Tailings, Kestrel or Golden Vale)
Figure 3: ‘Charles on Mullock’ photo showing Timoni headframe and historic mine dumps at the Baldock Deposit
ASX ANNOUNCEMENT
28 June 2024
Baldock Deposit
The Baldock deposit is a series of steeply west-south-west dipping gold lodes in the vicinity of the historic
Baldock and Timoni gold mines, located within Delta’s 100% owned Mt Ida Project (see Figure 1). There is
a close relationship between the Baldock Lodes and the Timoni and Sister Sam lithium deposits (see ASX
announcement dated 3rd October 2023 entitled ‘Mt Ida Lithium Mineral Resource Estimate Update’). Gold
mineralisation is associated with quartz and sulphide development within shear zones. The MRE extends
over 2km of strike, with the mineralised system identified over 4km of strike with only a handful of holes
testing the strike outside the MRE (See Figure 4).
Figure 4: Long section showing Baldock Deposit MRE with mineralised drillholes present outside of the resource.
HOLEID
IDRD146
IDRD030
SSRD044
IDRD066
TIC0122
TIB0060
TIC0104
GWV086_097
TIC0096
GCS0068
TIC0186
TIC0118
TIC0123
From
82.9
303.5
84.0
191.4
218.0
20.0
246.0
65.0
113.0
79.0
289.0
250.0
220.0
To
84.0
309.1
93.0
197.1
229.0
30.0
250.0
71.0
118.0
83.0
304.0
255.0
229.0
Length Au g/t
gm
1.1
302.0
323.1
5.6
52.7
295.6
9.0
26.5
238.3
5.7
35.7
203.6
11.0
18.4
202.5
10.0
18.3
182.8
4.0
43.3
173.4
6.0
28.5
170.9
5.0
33.4
167.1
4.0
41.2
164.9
15.0
10.5
157.1
5.0
30.7
153.4
9.0
16.8
150.9
Table 2: Selected list of significant intercepts from the Baldock deposit used within this MRE (material data informing this updated
resource can be found in previous announcements listed in the Bibliography, intercepts are reported as downhole length not true
width, where possible drilling is normal to orientation of lodes but may not be a reflection of the true width of mineralisation)
ASX ANNOUNCEMENT
28 June 2024
Golden Vale
The Golden Vale deposit is a series of shallow east-south-east dipping gold lodes that were first mined in
the early 1990’s from a ~300m long by ~120m wide open pit (see Figure 1). Gold mineralisation is
associated with quartz and sulphide development within a shear zone. The MRE expands over 700m of
strike with the mineral system identified over 1km of strike (see Figure 5 below).
Figure 5: Long section showing Golden Vale MRE with mineralised drillholes present outside of the resource.
HOLEID
GV063
GV082
GV063
GVP6775600-01
GV004
RCGV005
GV035
GV172
GV009
GV026
GV040
GV062
GV168
GV168
GV163
From
To
Length
10.0
22.0
12.0
26.0
38.0
12.0
37.0
38.0
1.0
54.0
58.0
4.0
40.0
44.0
4.0
26.0
34.0
8.0
18.0
21.0
3.0
4.0
15.0
11.0
44.0
45.0
1.0
46.0
47.0
1.0
24.0
30.0
6.0
11.0
12.0
1.0
31.0
33.0
2.0
11.0
17.0
6.0
34.0
36.0
2.0
Au g/t
gm
150.4
1804.7
20.3
244.0
220.0
220.0
18.3
73.2
17.8
71.2
8.1
64.6
20.9
62.7
4.3
47.6
44.5
44.5
41.5
41.5
6.7
40.4
39.0
39.0
17.7
35.5
5.6
33.5
16.5
32.9
Table 3: Table showing selected list of significant intercepts from the Golden Vale deposit used within this MRE (a full list of
significant intercepts and collar information can be found in Appendix 2, intercepts are reported as downhole length not true width,
where possible drilling is normal to orientation of lodes but may not be a reflection of the true width of mineralisation)
ASX ANNOUNCEMENT
28 June 2024
Potential Resource Growth
The Company has undertaken very little gold specific exploration at Mt Ida since the acquisition of the
project in 2021 (see ASX Announcement dated 24th September 2021 entitled: ‘Completion of Mt Ida
Acquisition’). The majority of drilling that has been undertaken and used for this gold MRE update was
drilled targeting lithium. In addition to the excellent resource growth potential immediately along strike and
down dip of existing resources at Baldock (See Figure 4), Golden Vale (See figure 5) and Kestrel (Maiden
Mt Ida Gold MRE on 11 October 2023), there are numerous drilling results exceeding 1g/t Au within the
project that sit outside current resource estimates (See Figure 6 and Table 4).
Drilling is currently underway at the Mt Ida Project and will target high-grade resource extension
opportunities to grow the resource significantly.
Figure 6: Plan showing simplified geology, position of Gold MRE’s, drilling intercept disks greater than 1g/t Au, intercepts are
reported as downhole length not true width, where possible drilling is normal to orientation of lodes but may not be a reflection of
the true width of mineralisation
ASX ANNOUNCEMENT
28 June 2024
HOLEID
From
To
Length
Au g/t
gm
WEX001
65
67
2
17.8
35.6
CAC029
0
3
3
108.7
326.1
IDRC011
36
46
10
3.3
33
IDR006
40
56
16
2
32
IDRC010
24
36
12
1.1
13.2
SE3
24
30
6
3.1
18.6
RCGV013
38
47
9
1.9
17.1
FB32
6
9
3
9.9
29.7
MIR160
34
39
5
6
30
SDP3
36
44
8
1.5
12
MIB566
32
40
8
2.6
20.8
DDH1
50.5
52.5
2
185.9
371.8
WKEX019
34.9
42
7.1
2.1
14.91
SDAC030
9
17
8
2.3
18.4
Table 4: Table showing selected list of significant intercepts outside of any MRE demonstrating significant exploration upside at
the Mt Ida Project (material data pertaining to the regional drill hits can be found in previous announcements listed in the
Bibliography. Intercepts are reported as downhole length not true width, where possible drilling is normal to orientation of lodes but
may not be a reflection of the true width of mineralisation)
Next Steps
Delta has recommenced drilling activities at Mt Ida, with an RC rig recently mobilised to test both lithium and
gold targets. This program will include holes to test down-dip and plunge extensions to multiple high-grade
lodes identified in the current gold resource at Baldock. Further holes are also planned at Kestrel and Golden
Vale, along with regional follow up on high-grade assays such as those highlighted in Figure 6.
In parallel with site activities, Scoping Level assessment of the gold resource is underway to define scale and
scope of potential future gold mining options at Mt Ida.
Delta remains open to all options around crystalising value from the gold resources at Mt Ida.
Release authorised by the Board of Delta Lithium Limited.
For further information, please contact:
Delta Lithium
James Croser, Managing Director
Peter Gilford, CFO & Company Secretary
+61 8 6109 0104
info@deltalithium.com.au
Investor/Media Enquiries
Morrow Sodali
Michael Weir +61 402 347 032
About Delta Lithium
Delta Lithium (ASX: DLI) is an exploration and development company focused on bringing high-quality, lithium-bearing pegmatite deposits, located
in Western Australia, into production. With current global JORC compliant resources of 40.4Mt@1.1%Li2O, strong balance sheet and an
experienced team driving the exploration and development workstreams, Delta Lithium is rapidly advancing its Lithium Projects. The Mt Ida Lithium
Project holds a critical advantage over other lithium developers with existing Mining Leases and an approved Mining Proposal. Delta Lithium is
pursuing a development pathway to unlock maximum value for shareholders.
Delta Lithium also holds the highly prospective Yinnetharra Lithium Project that is already showing signs of becoming one of Australia’s most
exciting lithium regions. The Company is continuing exploration activities at Yinnetharra, with an extensive multi-rig campaign ongoing throughout
2024 to test additional regional targets and build on the Maiden Resource released in December 2023.
ASX ANNOUNCEMENT
28 June 2024
Competent Person's Statement
Information in this Announcement that relates to exploration results is based upon work undertaken by Mr. Charles Hughes, a Competent Person
who is a Member of the Australasian Institute of Mining and Metallurgy (AUSIMM). Mr. Hughes has sufficient experience that is relevant to the style
of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a ‘Competent Person’ as defined
in the 2012 Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’ (JORC Code). Mr. Hughes
is an employee of Delta Lithium Limited and consents to the inclusion in this announcement of the matters based on his information in the form and
context in which it appears.
The information in this report which relates to Mineral Resources for the Baldock and Golden Vale gold deposits at the Mt Ida Lithium Project was
prepared by Michael Andrew an employee of Snowden Optiro. Mr Andrew is a Fellow of the Australasian Institute of Mining and Metallurgy and
has sufficient experience relevant to the style of mineralisation, the type of deposit under consideration and to the activity undertaken to qualify as
Competent Persons as defined in the 2012 edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore
Reserves’. Mr Andrew consents to the inclusion of the information in the release in the form and context in which it appears.
Refer to www.deltalithium.com.au for past ASX announcements.
Past Exploration results and Mineral Resource Estimates reported in this announcement have been previously prepared and disclosed by Delta
Lithium in accordance with JORC 2012. The Company confirms that it is not aware of any new information or data that materially affects the
information included in these market announcements. The Company confirms that the form and content in which the Competent Person's findings
are presented here have not been materially modified from the original market announcement, and all material assumptions and technical
parameters underpinning Mineral Resource Estimates in the relevant market announcement continue to apply and have not materially changed.
Refer to www.deltalithium.com.au for details on past exploration results and Mineral Resource Estimates.
Disclaimer
This release may include forward-looking and aspirational statements. These statements are based on Delta Lithium management’s expectations
and beliefs concerning future events as of the time of the release of this announcement. Forward-looking and aspirational statements are necessarily
subject to risks, uncertainties and other factors, some of which are outside the control of Delta Lithium, which could cause actual results to differ
materially from such statements. Delta Lithium makes no undertaking to subsequently update or revise the forward looking or aspirational statements
made in this release to reflect events or circumstances after the date of this release, except as required by applicable laws and the ASX Listing
Refer to www.deltalithium.com.au for past ASX announcements.
Bibliography
Yinnetharra & Mt Ida Exploration Update ASX Announcement 15 February 2024
Yinnetharra & Mt Ida Exploration Update ASX Announcement 10 November 2023
Mt Ida Lithium Mineral Resource Estimate Upgrade. ASX announcement 2 October 2023
Complementary High Grade Gold at Mt Ida. ASX announcement 4 September 2023
Drilling update for Mt Ida Lithium. ASX announcement 8 August 2023
Further Outstanding Gold Assays including 7m @ 15.3g/t Au. ASX announcement 27 July 2022
Further Outstanding drill Assays inc. 5.6m @ 52.7 g/t Au. ASX announcement 27 June 2022
Mt Ida - A New Lithium Province (Historic results.) ASX announcement 28 September 2021
Mt Ida Acquisition, Capital Raise and Presentation. ASX announcement 7 September 2021
ASX ANNOUNCEMENT
28 June 2024
Appendix 1: Material Information Summaries Section 5.8 Geological Interpretation and Estimation
Parameters
The following is a material information summary relating to the Mineral Resource estimate, consistent with ASX Listing
Rule 5.8.1 requirements. Further details are provided in the JORC Code Table 1 (Appendix 3).
Location, geology and geological interpretation
Delta’s Mt Ida Lithium Project (Mt Ida or the Project) is located 350 km northwest of Kalgoorlie in the Eastern Goldfields
region of Western Australia. Project tenements are 100% owned by wholly owned subsidiaries of Delta Lithium Ltd
and cover approximately 170km2 of the Mt Ida-Ularring Greenstone Belt, with multiple granted prospecting,
exploration, and mining licences. The Mineral Resources are located within M29/002, M29/165, M29/094 and M29/422
(Figure 1).
The Project is situated in the Archaean Mt Ida-Ularring Greenstone Belt within the Kalgoorlie Terrane of the Yilgarn
Craton. Gold mineralisation is hosted within discrete structures associated with major faults and silica and sulphide
alteration.
The area has undergone strong folding and deformation with two large anticlines present within the area; the Mt Ida
Anticline and the Kurrajong Anticline with major shear zones located between the anticlines and a noticeable absence
of a syncline. It is this complex structural history that, particularly along the Timoni trend that has resulted in the gold
endowment observed today.
Gold mineralisation has been identified in numerous prospects throughout the project area. The mineralisation is
hosted in lodes and exhibits the following characteristics:
•
•
•
•
•
Form in shear zones that dip steeply to the South West and associated flat south west dipping shear zones that
form between the steeper shear zones
Associated with quartz veining, silica alteration of country rock, sulphide development
Range in thickness from about 0.5 to 12 m
Gold as fine free gold coating sulphide species, dominantly pyrrhotite, chalcopyrite and pyrite
Gangue minerals for the gold lodes are mainly quartz chlorite, biotite, albite, hornblende
Mineralisation wireframes were interpreted using Leapfrog Geo 3D software, with graphical selection of intervals used
to form vein models of the mineralisation for all projects. Continuity and plunge orientations were established by
applying the structural measurements collected from oriented diamond core, surface mapping, regional interpretation
of the structural setting and exploratory data analysis. Weathering surfaces were interpreted using regolith logging
data.
Drilling techniques
The drilling database used to define the Mineral Resource comprises 1471 reverse circulation (RC) drillholes for a
total of 153,463 m, 240 RC holes with diamond tails (RCD) for a total of 88,361.56 m and 185 diamond holes (DD) for
a total of 29542.05 m (Table 6). Aircore (AC), and rotary air-blast (RAB) drillholes were used to aid in geological
interpretation; however, samples collected by AC and RAB were not used in the MRE.
Delta drilling comprised RC drilling used a 143 mm face-sampling hammer bit. Diamond core was drilled using HQ2
and NQ2 bits. Drilling is generally spaced at 40m by 40m out to 80m by 80m. Delta has drilled 178 drill holes for
35,619m since acquisition of the project in 2021.
Historic drilling completed by other companies prior to Delta had limited or no QAQC available. As such if the MRE
was informed by historic data it was classified as Inferred Resources. The Kestrel MRE was informed by only historic
data. The Baldock and Golden Vale deposits were informed by Delta and historic drilling. Material historic results have
previously disclosed to the market as outlined in the bibliography to this announcement. Golden Vale drilling, the data
for which was acquired with the project in 2022 has been validated by Delta and is released in Appendix 2.
ASX ANNOUNCEMENT
28 June 2024
Company
DELTA
Year
2021-2024
G&M
HAMILL
1992
2001-2002
HOOPER
IGL
2020
2003-2004
LA MANCHA
2006
MOONLIGHT WILUNA
NEWCREST
ORABANDA MINING
1968
1997
2020
QUEENMARGARET
GOLDMINES
1980-1988
QUEENSROAD
1980-1990
SABMINCO
1987-1998
SPARGOS
VALIANT
1981-1982
Total
Drill No of
Metres
type holes
drilled
DD
124
19,998.06
RC
809
87,863
RCD
945 111,068.66
RC
81
3,761
DD
9
1,476.96
RC
158
24,238
RC
17
3,144
DD
6
1,653.5
RC
80
19,994
DD
4
1,652.23
RC
14
1800
DD
18
1,344.6
RC
4
770
RC
3
526
RCDD
2
642.9
DD
RC
DD
RC
DD
RC
DD
RC
DD
8
30
2
121
5
46
6
108
3
2,603
1,378.5
884.5
100
4840
701.4
2471
1,116.8
3,171.5
120
294,716.61
Table 5: Drilling history of the Mt Ida Project
Sampling and assaying
RC samples were passed through an in-line cone splitter and 2-3kg samples collected from 1m intervals. Delta
diamond core was logged in detail, with observations based on lithological boundaries. Half core samples were taken,
generally on 1m intervals or on geological boundaries where appropriate (minimum of 0.3m to maximum of 1.1m).
DD sampling is undertaken by lithological/alteration domain to a maximum of 1.1m and a minimum of 0.3m. Core is
cut in half with one half sent to the lab and one half retained in the core tray. Occasional wet RC samples were
encountered, extra cleaning of the splitter was carried out afterward. RC and DD samples have been analysed for Au
by 50g fire assay by ALS, Nagrom, NAL and SGS, and via photon assay by ALS. Samples analysed by via fire assay
at ALS, Nagrom, NAL and SGS were dried, crushed and pulverised to 80% passing 75 microns before undergoing a
selected peroxide fusion digest or 4 acid digest with ICPMS finish or fire assay with ICPMS finish.
Samples analysed via photon assay at ALS are dried and crushed to 3mm with 500g of material utilised for the
analysis. RC duplicate field samples were carried out at a rate of 1:20 and were sampled directly from the splitter on
the rig. These were submitted for the same assay process as the primary samples and the laboratory are unaware of
such submissions.
Historic chip sampling methods include single metre riffle split and 4m composites that were either scoop or spear
sampled, while historic core was cut onsite and half core sampled .
Historic samples were analysed at LLAS, Genalysis and unspecified laboratories.
ASX ANNOUNCEMENT
28 June 2024
Historic Au analysis techniques generally included crushing, splitting if required, and pulverisation, with aqua regia or
fire assay with AAS finish used to determine concentration.
Field blanks and industry certified standards were inserted by Delta at a rate of 1 per 20 samples and field duplicates
for RC were collected by Delta at a rate of 1 every 60 samples. No drill core duplicates have been completed at this
stage. Laboratory Certified Reference Materials (CRMs) and/or in-house controls, blanks, splits and replicates were
analysed with each batch of samples by the laboratory. Selected samples were re-analysed to confirm anomalous
results.
Metallurgy
Extensive metallurgical testwork has been undertaken by Delta Lithium in 2024 (See 22 April 2024 Announcement:
‘Company Update and strong start to Jameson Drilling’), and clearly demonstrates a straightforward CILP flowsheet
can achieve recoveries in excess of 90%.
Table 6: Results from three ore type composites created from >70 individual composites demonstrating excellent Au extraction
and negligible cyanide consumption from copper present in the samples.
Bulk density
Bulk density was measured from 3,761 core samples from diamond drillholes using Archimedes measurements. The
majority of the measurements are from fresh rock. Dry bulk density factors, assigned by rock type and weathering,
have been applied to generate resource tonnages.
Estimation methodology
Grade estimation was into parent blocks of 5m(E) x 10m(N) x 10m(RL). Block dimensions were selected from kriging
neighbourhood analysis and reflect the variability of the deposit as defined by the current drill spacing. Sub-cells, to a
minimum dimension of 1m(E) x 1m(N) x 1m(RL), were used to represent volume. Assay data was selected within the
modelled lode wireframes and composited to one metre lengths grade caps ranging from 1 g/t Au to 115 g/t Au applied
on a lode by lode basis. Block grade estimation of gold and copper by lode was completed using ordinary kriging (OK)
into parent block cells. Gold and copper were estimated independently. Variogram analyses were undertaken to
determine the grade continuity and the kriging estimation parameters used for the OK. Hard grade boundaries were
applied to the estimation of each lode. Given the increased amount of drilling undertaken by Delta and after review
against the historic data, both data sets were used to inform the Baldock resource. The Golden Vale lodes were
informed by only historic data.
Cut-off grades
The Mineral Resource estimates for the Mt Ida Project gold resources have been reported above a cut-off grade of
0.5 g/t Au and 1.5 g/t Au to represent the portion of the Mineral Resource that may be considered for eventual economic
extraction by combined open pit and potential underground methods respectively. The cut-off grades selected by Delta
in consultation with Snowden Optiro based on current experience and in-line with cut-off grades applied for reporting
of similar gold resources elsewhere in Australia. Given the stage of the Project and classification applied to the Mineral
Resource, the cut-off grades are considered reasonable.
Mining factors
ASX ANNOUNCEMENT
28 June 2024
The Mineral Resource has been reported under conditions where the Company believes there are reasonable
prospects of eventual economic extraction through a combination of open pit and potential underground mining
methods. Open pit resources have been reported within optimised pit shells based on a gold price of US$2,300/oz
(0.60 AUD exchange rate), 90% gold recovery, mining cost AUD$6.50/t, process cost AUD$25/t and nominal 45
degree slopes, at a cut-off grade of 0.5g/t Au. Underground resources are reported within Optimised Stope shapes at
based on a nominal 1m minimum mining width and 15m strike and 25m level extents at a cut-off of 1.5g/t Au on
mineralisation below the optimised pit shells. Historic production from the Baldock was approximately 265kozs gold at
a grade of 16.3g/t Au. A release on the Delta website dated 7 September 2021 references a Mineral Resource reported
under the JORC Code 2004. The MRE being reported by Delta in accordance with the JORC 2012 Code is materially
different to the historic estimate reflecting the drilling completed by Delta since 2021.The production data is likely to
be based on a higher cut-off used to define the lodes, but supports the MRE being reported by Delta.
Metallurgical factors or assumptions
An approximate metallurgical recovery of 90% has been assumed in determining reasonable prospects of eventual
economic extraction. Delata has undertaken extensive metallurgical testwork in recent months that demonstrates Au
metallurgical recoveries of in excess of 90%.
Mineral Resource classification
The Mineral Resource has been classified following the guidelines of the Australasian Code for Reporting of
Exploration Results, Mineral Resources and Ore Reserves, 2012 (the JORC Code). The Mineral Resource has been
classified as Indicated and Inferred on the basis of confidence in geological, grade and mineralogical continuity and
by taking into account the quality of the sampling and assay data, and confidence in estimation of the gold grade. The
classification criteria were assigned based on the robustness of the grade estimate as determined from the drillhole
spacing, geological (including mineralogy) confidence and grade continuity.
The Baldock Indicated Mineral Resources are supported by drilling with a nominal 40m by 20m to 40m by 40m spacing
and where geological and grade continuity is demonstrated. Inferred Mineral Resources are defined where drilling is
at a wider spacing than used for definition of Indicated Mineral Resources. Golden Vale is estimated using only historic
data and has been classified as Inferred, in line with the previously reported Kestrel resource.
ASX ANNOUNCEMENT
28 June 2024
Appendix 2: Drill hole details for new holes reported in this release (Golden Vale)
Table 7: Sigints greater than 0.5
Share your feedback
Discover