Managing Directors AGM Presentation
Released
Released
Announcement PDF
ANNUAL
GENERAL MEETING
27 NOVEMBER 2024
BOARD AND KEY MANAGEMENT
BOARD OF DIRECTORS
James Croser
Nader El Sayed
Non-Executive Chairman
Managing Director
• Current Managing Director of
Multiplant Holdings – a mining
and civil services provider
• Background in risk
management, corporate
governance, strategy and
finance
• 25+ years operational,
technical and management
experience in the Australian
mining sector
• Engineering background
Joshua Thurlow
Tim Manners
Steve Kovac
Non-Executive Director
Non-Executive Director
Non-Executive Director
• 20+ years experience in mining
and resources across Asia
Pacific, Africa & North America
• Background in corporate
strategy, social responsibility,
business development and
growth and operations
leadership
• 25+ years experience in
corporate finance, accounting
and business development
functions in the resources
sector
• Held senior financial positions
in various sectors including
precious and base metals,
industrial minerals and bulk
commodities
• Current CEO of Idemitsu
Australia
• 23+ years experience in the
mining sector
• Held Senior Management and
Executive level roles for the
past 14 years
DELTA LITHIUM | CORPORATE UPDATE
2
RESOLUTION 1 – ADOPTION OF REMUNERATION REPORT
To consider and, if thought fit, to pass, with or without amendment, the following resolution as a nonbinding resolution:
“That, pursuant to and in accordance with section 250R(2) of the Corporations Act and for all other purposes, Shareholders
approve the adoption of the Remuneration Report as contained in the Company’s Annual Report for the financial year ended 30
June 2024 on the terms and conditions in the Explanatory Memorandum.”
For
Against
Open
Abstain/Excluded
291,949,401
2,314,872
610,698
730,289
DELTA LITHIUM | RESOLUTIONS
3
RESOLUTION 2 – ELECTION OF DIRECTOR – TIM MANNERS
To consider and, if thought fit, to pass with or without amendment, as an ordinary resolution the following:
“That, pursuant to and in accordance with Listing Rule 14.5, clause 14.2 of the Constitution, Listing Rule 14.4 and for all other
purposes, Tim Manners, a Director, retires, and being eligible, is elected as a Director on the terms and conditions in the
Explanatory Memorandum.”
For
Against
Open
Abstain/Excluded
284,362,223
10,294,747
904,652
43,638
DELTA LITHIUM | RESOLUTIONS
4
RESOLUTION 3 – ELECTION OF DIRECTOR – JOSH THURLOW
To consider and, if thought fit, to pass with or without amendment, as an ordinary resolution the following:
“That, pursuant to and in accordance with Listing Rule 14.5, clause 14.2 of the Constitution, Listing Rule 14.4 and for all other
purposes, Josh Thurlow, a Director, retires, and being eligible, is elected as a Director on the terms and conditions in the
Explanatory Memorandum.”
For
Against
Open
Abstain/Excluded
284,717,604
9,896,934
941,241
49,481
DELTA LITHIUM | RESOLUTIONS
5
RESOLUTION 4 – ISSUE OF PERFORMANCE RIGHTS TO MR JAMES CROSER
To consider and, if thought fit, to pass with or without amendment, as an ordinary resolution the following:
“That, pursuant to and in accordance with Listing Rule 10.14, Part 2D.2 of the Corporations Act (including sections 200B and 200E
of the Corporations Act), Listing rule 10.19 and for all other purposes, Shareholders approve the issue of 2,600,000 Performance
Rights to Mr James Croser (and/or his nominee(s)) under the Plan on the terms and conditions in the Explanatory Memorandum.”
For
Against
Open
Abstain/Excluded
282,797,416
11,748,804
604,652
454,388
DELTA LITHIUM | RESOLUTIONS
6
RESOLUTION 5 – ISSUE OF OPTIONS TO DIRECTOR –TIM MANNERS
To consider and, if thought fit, to pass with or without amendment, as an ordinary resolution the following:
“That, pursuant to and in accordance with Listing Rule 10.14, Part 2D.2 of the Corporations Act (including sections 200B and 200E
of the Corporations Act), Listing rule 10.19 and for all other purposes, approval is given for the Company to issue of 1,000,000
Options to Mr Tim Manners (and/or his nominee(s)) under the Plan on the terms and conditions set put in the Explanatory
Memorandum.”
For
Against
Open
Abstain/Excluded
203,125,840
91,425,089
579,352
474,979
DELTA LITHIUM | RESOLUTIONS
7
RESOLUTION 6 – ISSUE OF OPTIONS TO DIRECTOR – NADER EL SAYED
To consider and, if thought fit, to pass with or without amendment, as an ordinary resolution the following:
“That, pursuant to and in accordance with Listing Rule 10.14, Part 2D.2 of the Corporations Act (including sections 200B and 200E
of the Corporations Act), Listing rule 10.19 and for all other purposes, approval is given for the Company to issue of 1,000,000
Options to Mr Nader El Sayed (and/or his nominee(s)) under the Plan on the terms and conditions set put in the Explanatory
Memorandum.”
For
Against
Open
Abstain/Excluded
202,840,644
91,726,249
579,352
459,015
DELTA LITHIUM | RESOLUTIONS
8
RESOLUTION 7 – ISSUE OF OPTIONS TO DIRECTOR – STEVE KOVAC
To consider and, if thought fit, to pass with or without amendment, as an ordinary resolution the following:
“That, pursuant to and in accordance with Listing Rule 10.14, Part 2D.2 of the Corporations Act (including sections 200B and 200E
of the Corporations Act), Listing rule 10.19 and for all other purposes, approval is given for the Company to issue of 1,000,000
Options to Mr Steve Kovac (and/or his nominee(s)) under the Plan on the terms and conditions set put in the Explanatory
Memorandum.”
For
Against
Open
Abstain/Excluded
203,533,144
91,024,860
589,352
457,904
DELTA LITHIUM | RESOLUTIONS
9
DELTA LITHIUM AGM PRESENTATION 2024
ACTIVITIES REPORT 12 months to 31-OCT
DELTA LITHIUM | AGM PRESENTATION NOVEMBER 2024
1
HUMAN RESOURCES & LABOUR HOURS
AGE DIVERSITY
41 - 50
20%
50+
8%
GENDER DIVERSITY
18 - 30
36%
FEMALE
39%
MALE
61%
31 - 40
36%
LABOUR HOURS
(STAFF)
PERTH
16,022
EMPLOYMENT TYPE
PARTTIME
9%
CASUAL
8%
Total Manhours
168,434
First Aid Incidents
16
Medical Treated Incidents
2
Lost Time Injury
2
MT IDA
24,525
YINNETHARRA
53,996
FULLTIME
83%
DELTA LITHIUM | AGM PRESENTATION NOVEMBER 2024
11
CASHFLOW WATERFALL
Note: Corporate includes overhead, net interest, rebates, fixed asset & financial asset acquisitions & disposals.
DELTA LITHIUM | AGM PRESENTATION NOVEMBER 2024
12
EXPLORATION ASSETS BY CATEGORY
Yinnetharra
DELTA LITHIUM | AGM PRESENTATION NOVEMBER 2024
Mt Ida
13
THE LAST 12 MONTHS
YINNETHARRA PROJECT
Maiden Lithium MRE for Malinda
25.7Mt @ 1.0% Li2O & 62ppm Ta2O5
Full Engagement on Heritage with
Wajarri Yamatji and Yinggarda
Traditional Owner groups
• 8 completed surveys across
over 6,000ha
• Native Title discussions
advanced
Holes
Drilled
RC
metres
drilled
DD
metres
drilled
Rockchip
samples
Geochem
samples
Assays
received
799
126,084
21,483
2,344
4,908
89,962
DELTA LITHIUM | AGM PRESENTATION NOVEMBER 2024
Wajarri Yamatji survey August
Refer to ASX announcement 27 December 2023 “Yinnetharra Lithium
Project Maiden Mineral Resource Estimate”
14
YINNETHARRA PROJECT
ENVIRONMENT SURVEYS COMPLETED across tenure:
•
Flora & Vegetation
•
Terrestrial Fauna & SRE
•
Targeted Yinnetharra Rock Dragon
•
Aquatic Fauna
•
Subterranean Fauna
•
Materials Characterisation
•
Tailings Characterisation
•
Soils and Rehab Characterisation
•
Hydrogeological and Hydrological Survey
PROJECT DEVELOPMENT
Hydrology, Regional Water Exploration and 4 permanent Bore Installations
METALLURGY 5t Pilot Plant 75% COMPLETE on M1 – Confirming sighter recoveries
Geometallurgy, Whole-Of-Ore Flotation Flowsheet development testwork ongoing M1, M36, M47
Bi-product Tantalum testwork underway
APPROVALS RECEIVED
•
Groundwater Licence for 250,000kL to support camp & site development
WHAT’S NEXT?
MINING LEASE APPLICATION submission for Malinda
MINING PROPOSAL submission for Malinda inclusive environmental survey data
MRE UPDATE for Malinda
METALLURGY
DELTA LITHIUM | AGM PRESENTATION NOVEMBER 2024
Over 330 drill pads rehabilitated
Water bore install
15
MT IDA PROJECT
THE LAST 12 MONTHS
Gold MRE Update June’24
6.6Mt @ 3.5g/t Au for 752koz
Holes
Drilled
RC
metres
drilled
DD
metres
drilled
Rockchip
samples
Geochem
samples
Assays
received
309
35,063
8,341
309
1,131
62,503
APPROVALS RECEIVED
•
•
•
•
•
•
Mining Proposal and Mine Closure Plan for Baldock Area
Native Vegetation Clearing Permit for Baldock Area
Works Approval – Crushing & Screening 2Mtpa
Groundwater Licence 1.27GLpa
Mining Lease M29/444, L29/186 granted
Shire Road Diversion east of Baldock
Refer to ASX Announcement 28 Jun 2024 “Major Upgrade to Mt Ida Gold Resource”
DELTA LITHIUM | AGM PRESENTATION NOVEMBER 2024
16
MT IDA PROJECT
Timoni Headframe sunrise
ENVIRONMENT SURVEYS COMPLETED:
GOLDEN VALE – in support future Mining Approvals submission
Flora & Vegetation Survey
Fauna Survey
Hydrological Surveys
FOR SHIRE ROAD DIVERSION east of Baldock Mining Centre length 5km
Flora & Vegetation Survey
Fauna Survey
PROJECT DEVELOPMENT
Regional water drilling to support stand-alone Gold and/or Lithium processing plant
Timoni Underground dewater volume +211ML down to 185mbs and counting…
…on GOLD…
METALLURGY composites on 5 MAIN LODES at Baldock return +90% avg.rec
Grade Control drilling 086 & 140 Lode Pit locations
Internal Scoping Study FAVOURABLE – enough to support current
40,000m drill program
STRONG GOLD MARKET PROMPTS STRATEGIC REVIEW ON MT IDA GOLD
Spodumene flourescence
DELTA LITHIUM | AGM PRESENTATION NOVEMBER 2024
17
Burringurrah Primary
School
COMMUNITY ENGAGEMENT
& SPONSORSHIP
WEST PERTH FOOTBALL CLUB
AFLW LEAGUE TEAM
BURRINGURRAH REGIONAL
COMMUNITY SCHOOL
GASCOYNE JUNCTION
REGIONAL COMMUNITY
SCHOOL
Gascoyne Junction
Primary School
Winners !
SHIRE OF UPPER GASCOYNE
CORE LEARNING FOUNDATION
WA PARKS FOUNDATION
WASM ALUMNI
DELTA LITHIUM | AGM PRESENTATION NOVEMBER 2024
18
INVESTOR
ENGAGEMENT
RIU CONFERENCE FREMANTLE
RESOURCE CONNECT ASIA SINGAPORE
MID-WEST & GASCOYNE MAJOR
PROJECTS
CANACCORD METALS & MINING
CALIFORNIA
NOOSA MINING INVESTOR
CONFERENCE
DIGGERS AND DEALERS KALGOORLIE
GASCOYNE RESOURCE CONNECT
RIU SYDNEY RESOURCES
SOUTH-WEST CONNECT BUSSELTON
121 MINING DUBAI
www.deltalithium.com.au
https://www.linkedin.com/company/90421928/admin/dashboard/
Premium Locations
Hardrock Lithium Capital of the World
Our Team
Results driven with proven hardrock lithium experience
Yinnetharra
Maiden JORC Lithium resource 25.7Mt @ 1.0% Li2O
Tier one potential with Dominant Landholding under-explored
New Discovery at Jameson
“WE ARE THE DIFFERENCE”
Mt Ida
JORC Lithium resource 14.6 Mt @ 1.2% Li2O
JORC Gold resource 6.6Mt @ 3.5g/t Au for 752koz
Mining Approval granted
Major Shareholders
Proven hardrock lithium partners
Upcoming Catalysts
Exploration results incoming and JORC resource updates
Mining and metallurgy studies progressing
Bluesky upside via Gold
DELTA LITHIUM | AGM PRESENTATION NOVEMBER 2024
20
GROUP MINERAL RESOURCE ESTIMATES
Lithium Mineral Resource Estimates
Mt Ida Gold Mineral Resource Estimate
Delta Lithium Group Mineral Resource Estimate
Resource
Category
Cut-off
grade
Grade
Li2O
Grade
(Mt)
(%Li2O)
(Kt)
(Ta2O5 ppm)
-
-
-
-
6.7
1.0
65
51
19.0
1.0
181
67
Total Resource
25.7
1.0
246
62
Measured
-
-
-
-
Indicated
7.8
1.3
104
224
6.8
1.1
76
154
14.6
1.2
180
191
Total Measured
-
-
-
-
Total Indicated
14.5
1.2
169
144
Total Inferred
25.8
1.0
257
Total
40.4
1.1
426
Measured
Mt Ida
Ta2O5
Li2O
Tonnes
(%Li2O)
Yinnetharra
Indicated
Indicated
Inferred
Inferred
Total Resource
0.5
0.5
Cut off
Open cut Au
0.5 g/t
0.0 g/t Au
Cut off
Underground
1.5 g/t Au
Deposit
Inferred
Total
Tonnes
Grade
Ounces
Tonnes
Grade
Ounces
Tonnes
Grade
Ounces
(000s)
g/t Au
(000s)
(000s)
g/t Au
(000s)
(000s)
g/t Au
(000s)
Baldock
1,345
4.9
209.0
1,512
3.2
158
2,857
4.0
367
Kestrel
-
-
-
570
1.6
29
570
1.6
29
Golden Vale
-
-
-
496
1.7
27
496
1.7
27
Mt Ida Tailings
-
-
-
500
0.5
8
500
0.5
8
Baldock
180
5.8
33.0
1,780
4.8
274
1,960
4.9
307
Kestrel
-
-
-
220
1.9
14
220
1.9
14
Golden Vale
-
-
-
-
-
-
-
-
-
500
0.5
8
500
0.5
8
Mt Ida Tailings
Baldock
1,525
4.9
242.0
3,292
4.1
432
4,817
4.4
674
Kestrel
-
-
-
790
1.7
43
790
1.7
43
90
Golden Vale
-
-
-
496
1.7
27
496
1.7
27
109
Total
1,525
4.9
242.0
5,078
3.1
510
6,603
3.5
752
All
Notes:
Tonnages and grades have been rounded to reflect the relative uncertainty of the estimate.
Inconsistencies in the totals are due to rounding.
Refer to ASX announcement 27 December 2023 “Yinnetharra Lithium Project Maiden Mineral Resource Estimate”
Refer to announcement 3 October 2023 “Mt Ida Lithium Project Mineral Resource Estimate upgrade”
DELTA LITHIUM | AGM PRESENTATION NOVEMBER 2024
Refer to ASX Announcement 28 Jun 2024 “Major Upgrade to Mt Ida Gold Resource”
21
IMPORTANT NOTICES AND DISCLAIMER
Disclaimer
You must read the following notices before reading or making any use of this document or any
information contained in this document. By continuing to read, use or otherwise act on this document,
you agree to be bound by the following terms and conditions, including any modifications to them.
This presentation (Presentation) has been prepared by Delta Lithium Limited (ACN 107 244 039) (ASX:DLI)
(the Company or Delta).
Summary information
This Presentation contains summary information about the Company and its activities current as at the date of
release. The information in this Presentation is of a general nature and does not purport to be complete nor
does it contain all information which a prospective investor may require in evaluating a possible investment in
the Company or that would be required in a prospectus or product disclosure statement prepared in accordance
with the requirements of the Corporations Act. The historical information in this Presentation is, or is based on,
information that has been released to the ASX. This Presentation should be read in conjunction with the
Company's other periodic and continuous disclosure announcements lodged with the ASX, which are available
at www.asx.com.au. The information in this Presentation remains subject to change without notice.
Any market and industry data that may be used in connection with this Presentation may have been obtained
from research, surveys or studies conducted by third parties, including industry or general publications. None of
the Company, its representatives or advisers have independently verified that market or industry data provided
by third parties or industry or general publications.
Not an offer
This Presentation is not an offer or invitation to acquire securities or any other financial products and is not a
prospectus, product disclosure statement or other offering document under Australian law (and will not be
lodged with ASIC) or any other law. This Presentation is for information purposes only and is not an invitation or
offer of securities for subscription, purchase or sale in any jurisdiction. This Presentation is not and should not
be considered an offer or an invitation to acquire securities or any other financial products and does not and will
not form any part of any contract for the acquisition of securities.
Not financial product advice
This Presentation does not constitute financial product or investment advice or any recommendation to acquire
securities or accounting, legal or tax advice. It has been prepared without taking into account the objectives,
financial or tax situation or needs of individuals. Before making an investment decision, prospective investors
should consider the appropriateness of the information having regard to their own objectives, financial and tax
situation and needs and obtain legal and taxation advice appropriate to their jurisdiction. Delta is not licensed to
provide financial product advice in respect of the securities or any other financial products.
DELTA LITHIUM | AGM PRESENTATION NOVEMBER 2024
Investment risk
An investment in securities is subject to investment and other known and unknown risks, some of which are
beyond the control of Delta including loss of income and principal invested. The Company does not guarantee
any particular rate of return or performance or any particular tax treatment.
Effect of rounding
A number of figures, amounts, percentages, estimates and calculations of value in this Presentation are subject
to the effect of rounding.
Past performance
Investors should note that past performance and any pro forma financial information given in this Presentation is
given for illustrative purposes only and should not be relied on as (and is not) an indication of Delta’s views on
its future financial performance or condition. Prospective investors should note that past performance, including
past share price performance, of Delta cannot be relied on as an indicator of (and provides no guidance as to)
future performance including future share price performance. The historical information in relation to Delta
included in this Presentation is, or is based on, information that has previously been released to the market.
Forward-looking Statements and aspirational targets
Some statements in this Presentation regarding estimates or future events are forward-looking statements. They
include indications of, and guidance on, future matters. Forward-looking statements include, but are not limited
to, statements preceded by words such as “planned”, “expected”, “projected”, “estimated”, “may”, “scheduled”,
“intends”, “anticipates”, “believes”, “potential”, “could”, “nominal”, “conceptual” and similar expressions. Forwardlooking statements, opinions and estimates included in this Presentation are based on assumptions and
contingencies which are subject to change without notice, as are statements about market and industry trends,
which are based on interpretations of current market conditions.
Forward-looking statements are provided as a general guide only and should not be relied on as a guarantee of
future performance. Forward-looking statements may be affected by a range of variables and risks that could
cause actual results to differ from anticipated results and may cause Delta’s actual performance and results
(and other forward-looking statements) to materially differ from any projections of future performance or results
expressed or implied by such forward-looking statements. Readers should not place undue reliance on such
forward-looking information. There can be no assurance that forward-looking statements will prove to be correct
This Presentation may include aspirational targets. These targets are based on management’s expectations and
beliefs concerning future events as of the time of the release of this Presentation. Targets are necessarily
subject to risks, uncertainties and other factors, some of which are outside the control of Delta that could cause
actual results to differ materially from such statements.
22
IMPORTANT NOTICES AND DISCLAIMER
Competent Person Statement
JORC and Listing Rules Compliance Statement
Information in this Presentation that relates to exploration results is based upon work undertaken by Mr. Shane
Murray, a Competent Person who is a Member of the Australasian Institute of Geoscience (AIG). Mr. Murray has
sufficient experience that is relevant to the style of mineralisation and type of deposit under consideration and to
the activity which he is undertaking to qualify as a ‘Competent Person’ as defined in the 2012 Edition of the
‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’ (JORC Code).
Mr. Murray is an employee of Delta and consents to the inclusion in this Presentation of the matters based on
his information in the form and context in which it appears.
Past Exploration Results and Mineral Resource estimates reported in this Presentation have been previously
prepared and disclosed by Delta in accordance with the JORC Code. The information in this Presentation that
relates to:
•
exploration results are extracted from Delta's ASX announcements of:
a)
b)
c)
d)
e)
f)
g)
h)
i)
j)
k)
l)
19 October 2022 and entitled “Maiden Lithium Mineral Resource Estimate at Mt Ida“, and for which
the consent of the Competent Person, Mr Matthew Boyes, was obtained;
25 January 2023 entitled "Best intercept to date at Mt Ida Lithium Project", and for which the
consent of the Competent Person, Mr Charles Hughes, was obtained;
27 February 2023 entitled "Yinnetharra results confirm extensive near surface strike", and for which
the consent of the Competent Person, Mr Charles Hughes, was obtained;
3 April 2023 entitled "Scale of the Yinnetharra Project continues to grow", and for which the consent
of the Competent Person, Mr Charles Hughes, was obtained;
24 April 2023 entitled "NEW MT IDA DISCOVERY 90 METRES AT 0.95% Li2O", and for which the
consent of the Competent Person, Mr Charles Hughes, was obtained;
8 May 2023 entitled "Further shallow thick high-grade Lithium from Yinnetharra", and for which the
consent of the Competent Person, Mr Charles Hughes, was obtained;
8 August 2023 entitled "Drilling update for Mt Ida Lithium", and for which the consent of the
Competent Person, Mr Charles Hughes, was obtained;
21 August 2023 entitled “Excellent Yinnetharra Initial Metallurgical Results and Drilling Update” and
for which the consent of the Competent Person, Mr Charles Hughes, was obtained,
4 September 2023 entitled “High grade gold results offer complementary cashflow opportunity at Mt
Ida” and for which the consent of the Competent Person, Mr Charles Hughes, was obtained, and
10 November 2023 entitled “Yinnetharra and Mt Ida Exploration Update” and for which the consent
of the Competent Person, Mr Charles Hughes, was obtained.
14 March 2024 entitled “Yinnetharra Exploration Update” and for which the consent of the
Competent Person, Mr Charles Hughes, was obtained.
22 April 2024 entitled “Company Update and First Jameson Result” and for which the consent of the
Competent Person, Mr Charles Hughes, was obtained.
DELTA LITHIUM | AGM PRESENTATION NOVEMBER 2024
• mineral resource estimates are extracted from Delta's ASX announcements of
a) 19 October 2022 and entitled “Maiden Lithium Mineral Resource Estimate at Mt Ida“, and for which the
consents of the Competent Persons, Ms Justine Tracey and Mrs Christine Standing, was obtained;
b) 3 October 2023 ASX announcement entitled “Mt Ida Lithium Project Mineral Resource Estimate upgrade”
and for which the consent of the Competent Persons, Ms Susan Havlin and Dr Andrew Scogings was
obtained;
c) 11 October 2023 ASX announcement entitled “Mt Ida Maiden Gold Mineral Resource Estimate” and for
which the consent of the Competent Persons, Ms Susan Havlin and Dr Andrew Scogings was obtained;
d) 27 December 2023 ASX announcement entitled “Yinnetharra Lithium Project Maiden Mineral Resource
Estimate” , and for which the consent of the Competent Persons, Ms Susan Havlin and Dr Andrew
Scogings was obtained.
e) 28 June 2024 ASX announcement entitled “Major Upgrade for Mt Ida Gold Resource” , and for which the
consent of the Competent Persons, Ms Susan Havlin and Dr Andrew Scogings was obtained.
The Company confirms that it is not aware of any new information or data that materially affects the information
included in these market announcements. The Company confirms that the form and content in which the
Competent Person’s findings are presented here have not been materially modified from the original market
announcements, and all material assumptions and technical parameters underpinning Mineral Resource
Estimates in the relevant market announcement continue to apply and have not materially changed. Refer to
www.deltalithium.com.au for details on past exploration results and Mineral Resource estimates.
JORC Code differs from reporting requirements in other countries
It is a requirement of the ASX Listing Rules that the reporting of ore reserves and mineral resources in Australia
comply with the JORC Code. Investors outside Australia should note that while ore reserve and mineral
resource estimates of the Company in this Presentation comply with the JORC Code, they may not comply with
the relevant guidelines in other countries and, in particular, do not comply with (i) National Instrument 43 101
(Standards of Disclosure for Mineral Projects) of the Canadian Securities Administrators or (ii) Item 1300 of
Regulation S-K, which governs disclosure of mineral reserves in registration statements filed with the US
Securities and Exchange Commission.
Information contained in this Presentation describing mineral deposits may not be comparable to similar
information made public by companies subject to the reporting and disclosure requirements of other countries.
You should not assume that quantities reported as “resources” in this Presentation will be converted to reserves
under the JORC Code or any other reporting regime or that Delta will be able to legally and economically extract
them.
23
Share your feedback
Discover