JAV: to acquire brownfields Eureka Gold Mine near Kalgoorlie
Released
Released
Announcement PDF
ASX Announcement
25 October 2024
Javelin agrees to acquire Eureka
Gold Mine near Kalgoorlie
Eureka already hosts a JORC Mineral Resource Estimate of 112,000oz Au, with
mineralisation open along strike and at depth
Highlights
• Javelin to acquire Eureka Gold Mine from Delta Lithium Limited (ASX: DLI) for upfront
consideration of $3m in cash and shares, plus $1m in deferred consideration shares
• The deal will deliver Javelin its second brownfields exploration project in WA’s Eastern
Goldfields, close to existing infrastructure including mills with production capacity
• Eureka historical drill intercepts to be followed up in Q1 2025 drill program include
4m @ 134.52g/t Au, 3m @ 48.75 g/t Au and 4m at 32.08g/t Au
• Javelin has secured $3m in firm commitments with Shaw and Partners to fund the
Eureka acquisition and the Eureka exploration programs to commence in Q1 2025
• Current JORC Mineral Resource Estimate at Eureka stands at 2.45Mt at 1.42 g/t Au
totalling 112,000oz. All resources are hosted on granted historic mining leases.
• Major gold deposits such as Paddington (>4Moz) are hosted within the same
greenstone lithological sequence only 20km south-east of Eureka
• Structural setting similar to Zoroastrian deposit (530Koz) at Bardoc Gold - 1.4km to the
east of Eureka Gold Deposit
• Javelin is set to start drilling at its Coogee Gold project near Kalgoorlie in this quarter
Javelin Minerals Limited (ASX: JAV) (Javelin) is pleased to advise that it has agreed to acquire 100% of the
Eureka Gold Project (Eureka Gold Project or the Project) in WA from Delta Lithium Limited (ASX: DLI) (Delta)
for upfront consideration of $1.5 million cash and $1.5m worth of Javelin shares to be escrowed for 12 months,
and deferred consideration of $1.0m worth of Javelin shares vesting on Eureka Gold Project milestones being
achieved, subject to Javelin shareholder approval.
Eureka is located 54km north-north-west of Kalgoorlie in the heart of the State’s greenstone belt. It sits 20km
north-north-west of the world-famous Paddington gold mine and near several producing mines.
Page 1
ASX Announcement
25 October 2024
The Eureka Gold Project has a JORC Mineral Resource Estimate of 112,000oz at 1.42g/t at a cut-off grade of
0.5g/t. This includes an Indicated Mineral Resource Estimate of 62,000oz. The Project acquisition comprises
four mining licences M24/0584, M24/0585, M24/0586 and M24/0189, one miscellaneous licence L24/0234
and the three prospecting licences P24/5116, P24/5549 and P24/5548 (the Tenements).
Eureka was mined in the early 1990’s and then subject to tribute mining in 2018. The majority of the gold
resource is currently hosted on granted mining leases in the immediate vicinity of the Eureka open pit, along
strike and down-dip. The mineralisation is hosted within several steeply dipping sheared zones dipping at
approximately 75 degrees to the east.
Resource drilling in 2021 by Delta (formerly TNT Mines Ltd) (ASX Announcement 28 July 2021: New Gold
Lode at Eureka, ASX Announcement 7 October 2021: Eureka North Exploration Results Include High Grade
Gold) led to the establishment of a new lode to the north of the pit. The successful drilling campaign
confirmed additional mineralisation in addition to historical results in the ASX release including:
-
4m @ 134.52g/t Au from 53m from drillhole ERC39, and
4m at 32.08g/t Au from 104m from Drillhole WRRC106.
Drilling to the south of the pit extended the known mineralisation with additional high grade results including:
-
6m at 13.88g/t from 38m, including 2m at 31.95g/t from drillhole WRRC0121.
Subsequent extensional drilling in 2021 by Delta (formerly Red Dirt Metals Ltd) at Eureka North resulted in
more significant results (ASX Announcement 7 October 2021: Eureka North Exploration Results Including High
Grade Gold). Significant assays returned include:
-
3m @ 48.75 g/t Au from 129m in WRRC0135
4m @ 11.2 g/t Au from 32m in WRRC0136 (within 4m composite), and
1m @ 5.97 g/t Au from 108m in WRRC0127
Under the terms of the acquisition, Javelin will acquire from Delta 100% of the issued capital in Warriedar
Mining Pty Ltd (Warriedar), a wholly owned subsidiary of Delta which owns 100% of the Eureka Project, for
the following total acquisition consideration payable to Delta at settlement:
•
•
•
$1,500,000 in cash (from the proceeds of the $3m capital raising);
$1,500,000 worth of Shares, being 500,000,000 fully paid ordinary shares in Javelin (Shares), at a
deemed issue price of $0.003 per Share, subject to shareholder approval. These shall be subject to 12
months voluntary escrow from their date of issue; and
$1,000,000 worth of deferred consideration Shares at a deemed issue price equal to the 10-day volume
weighted average price (VWAP) of Shares as traded on the ASX up to and including the day prior to the
relevant vesting date, subject to shareholder approval. The deferred consideration shares will vest upon
the achievement of the earlier of:
1. the recommencement of mining operations on one or more of the Tenements; or
2. Javelin increasing the JORC compliant Inferred Mineral Resource across the Tenements to
>200,000oz at a 0.5% g/t cut off, provided that the relevant milestone has been satisfied
within the earlier of 3 years of settlement of the acquisition and 15 December 2027.
Delta will also have the right to appoint a representative to the Board of Javelin upon settlement of the
acquisition.
Page 2
ASX Announcement
25 October 2024
The Eureka acquisition will deliver Javelin its second brownfields exploration project in WA’s Eastern
Goldfields. The Company already owns the Coogee Project, where it is set to commence drilling this quarter.
The Coogee Project is located next to the rich St Ives Goldfield and has a JORC Resource of 126,685oz of
gold and 4,133 tonnes of contained copper (ASX Announcement 26 August 2024: 158% Increase in Coogee
Gold MRE) (Appendix 2).
Javelin Executive Chairman Brett Mitchell said: “Eureka is an outstanding acquisition opportunity which has
become available only because Delta is focussed on a wider Lithium strategy.
The Project meets our strategy perfectly. It has an established resource with further known mineralisation
which remains open at depth and along strike. And like Coogee, it has been exposed to virtually no modern
exploration.
Javelin now has two compelling brownfields exploration projects on mining leases, 50km either side of
Kalgoorlie with immense exploration upside, giving us huge opportunities to create value for shareholders
with further exploration”.
Figure 1 – Aerial Photo showing the open cut Eureka Gold Pit looking east
Background on the Eureka Gold Project
The Eureka Gold Project tenements are located in the Eastern Goldfields of WA, 54 km north-north-west of
Kalgoorlie and is accessed via the Goldfields Highway, Figure 2.
The region is considered prospective for gold mineralisation and contains a number of historical mines and
mineral occurrences. The Project is situated in a highly fertile greenstone belt with numerous gold deposits
and abundant gold occurrences nearby.
Page 3
ASX Announcement
25 October 2024
The Eureka gold deposit was first discovered in the 1890s, with historical underground mining worked until
1940. Historical information sources noted that gold mineralisation is associated with shearing and quartz
veining within easterly dipping oxidised fine grained mafic rocks. Recorded production from 1897 up to 1940
totalled 809 tonnes averaging 27.8 g/t Au. From 1985 to 1988, mining of the Eureka open pit included 220,000
tonnes at 4.5 g/t Au for 32,000oz by West Coast Holdings Limited. Development to test for underground
mineralisation potential at Eureka was started in mid-1996. In 2018, Tyranna Resources Limited also mined
50,600 tonnes of ore grading 3.16 g/t Au producing 5,374oz of gold.
Figure 2 – Location Map showing the Eureka Project area with nearby Gold Mines and major infrastructure
Page 4
ASX Announcement
25 October 2024
Geology and Prospectivity
Regionally, the Eureka gold deposit occurs on the eastern limb of the major south-east plunging GoongarrieMt. Pleasant Anticline. The eastern limb consists predominantly of north-north-west trending mafic and
ultramafic lithologies. This zone consists of multiple shear zones occurring within intercalated felsic, mafic
and ultramafic lithologies in the vicinity of the synformal axis. The Eureka gold deposit is located within the
Bardoc Tectonic Zone which hosts the Paddington and Bardoc gold deposits.
Gold mineralisation at Eureka occurs as a number of lens-shaped ore shoots up to 10m wide within the shear
zone. The gold is hosted in quartz veins and quartz stringers within the altered mafic host rocks. The
mineralisation at Eureka is hosted within basalts and is contained with a zone of shearing and foliation with
quartz veining containing quartz, carbonate and low amounts of sulphides with some visible gold has a
variable thickness of up to 20 metres. Mineralisation has been exploited in a 120m deep, 300m long open pit
that was developed on a number of lens-shaped shoots up to 10 metre wide within an intensely sheared
zone approximately 30 metres wide. The mineralisation is sub-vertically dipping and strikes in a north south
orientation with several offsets and splays forming the main structure.
Footwall Shale
Unit
Narrow Quartz
Vein Hosted
Shear Zone
Historical
Underground
Adit
Figure 3 - Eureka Open Pit – Recent view of Open Pit workings, looking south (Cube, June 2021)
Page 5
ASX Announcement
25 October 2024
Eureka Gold Project Mineral Resource Estimate
The existing Eureka Gold Project Mineral Resource Estimate (MRE) stands at 2.45Mt at 1.42 g/t Au totalling
112,000 ounces of gold. Table 1 shows the Eureka Mineral Resource Estimate as of June 2021 based on
tonnes and grades (also refer to Appendix 3 – Summary of JORC Table 1 and Listing Rule 5.8.1).
Table 1: Eureka Gold Deposit Mineral Resource Estimate by Classification as of June 2021
(at a 0.5 g/t Au cut-off)
Classification
Tonnage
t
Grade
Contained Metal
Indicated
1,269,000
1.53
62,000
Inferred
1,183,000
1.3
50,000
Total
2,452,000
1.42
112,000
g/t Au
(Oz Gold)
Exploration Potential
Strike potential north of the pit
Some 750m of strike north of the pit remain inadequately tested, which will be the focus of the planned
Eureka exploration drilling program in early 2025. The previous exploration may have been ineffective as
most of the drillholes were terminated at shallow depths thus not penetrating the zone of near-surface
leaching. The drill traverses were restrictive in coverage and potentially have missed the best target zones.
Significant RC drilling results immediate north of the pit include:
•
•
•
•
•
ERC39:
4m @ 135 g/t Au from 53m
WRRC0106: 4m @ 32.6 g/t Au from 104m, including 1m @ 116 g/t Au from 104m
WRRC0019: 4m @ 11 g/t Au from 42m, including 2m @ 19.2 g/t from 43m
WRRC0135: 3m @ 48.75 g/t Au from 129m
WRRC0136: 4m @ 11.2 g/t Au from 32m
The full results are set out in Appendix 1.
Strike potential south of the pit
At surface, the main host structure strikes over the western boundary of the leases some 330m south of the
pit. Due to the east dip of the host structure, the 200m strike length seen at surface extends at depth beneath
the tenement.
Significant RC drilling results immediate south of the pit include:
•
•
•
•
WRRC0001: 13m @ 2.22 g/t Au from 51m
WRRC0121: 6m @ 13.88 g/t Au from 38m
WRRC0081: 13m @ 2.13 g/t Au from 110m, 9m @ 3.15 g/t Au from 127m, including 3m @ 7.9 g/t Au
from 131m
WRRC0082: 3m @ 8.59 g/t Au from 74m
The full results are set out in Appendix 1.
Strike potential for parallel structures extends some 4,400m south of the pit. This zone remains poorly tested
with all the drilling concentrating around the Eureka Pit.
Page 6
ASX Announcement
25 October 2024
Figure 4 – Drillhole Collars Position in relation to the open Eureka Pit
Page 7
ASX Announcement
25 October 2024
Potential at depth beneath the underground resource
The mineralised veins have been drilled over 180 vertical metres below the bottom of the current pit. Deeper
drilling is suggested to test the continuation of the subvertical east dipping gold mineralised zone. The
northern zone along with the bottom of the pit remain open.
Figure 5 – Long Section showing significant gold intersection south and north of the Eureka Pit (Cube, June 2021)
Firm Commitments Received for $3m Share Placement
The Company is pleased to advise that via lead manager and bookrunner Shaw and Partners it has received firm
commitments for $3m via a two-tranche placement, from institutional and sophisticated investors at $0.0025 per
Share (Placement). The Shares under the Placement will be issued as follows:
-
Tranche 1: 900,000,000 Shares at an issue price of $0.0025 per Share, to raise up to $2,250,000 utilising
available placement capacity under ASX listing rule 7.1 (482,315,382 Shares) and 7.1A (417,684,618
Shares), will be issued on or about 1 November 2024; and
Page 8
ASX Announcement
25 October 2024
-
Tranche 2: 300,000,000 Shares at an issue price of $0.0025 per Share to raise up to $750,000 will be
subject to shareholder approval at the Company’s Annual General Meeting to be held in November 2024
(AGM).
The Placement participants will also receive a 1:2 option excercisable $0.004 expiring 2 years from the date of
grant (Option).
Fees of 5% of the amount raised under the Placement and 100,000,000 Options are payable to Shaw and Partners
on the Placement. There is no retainer or right of first refusal contained in Shaw and Partners lead manager
mandate.
Pareto Capital Pty Ltd will receive a fee of $30,000 (to be settled in shares post AGM) and 50,000,000 Options for
the provision of corporate advisory services associated with the transaction.
All Options related to the capital raising will be issued subject to shareholder approval at the AGM.
Key Terms of the Eureka Gold Project Acquistion
The Company has agreed to acquire 100% of the issued capital of Warriedar, and the Eureka Gold Project on the
terms as set out below.
Consideration
Subject to the satisfaction of the conditions precedent, the total consideration to be payable by the Company to
Delta for the acquisition is:
a) $1,500,000 cash;
b) 500,000,000 Shares, being $1,500,000 worth of Shares, at a deemed issue price of $0.003, which shall be
subject to 12 months voluntary escrow from their date of issue (Settlement Shares); and
c) $1,000,000 worth of Shares at a deemed issue price equal to the 10-day VWAP up to and including the day
prior to the relevant vesting date below (Deferred Consideration Shares), vesting upon the achievement of the
earlier of:
(A)
recommencement of mining operations on one or more of the Tenements; or
(B)
Javelin increasing the JORC compliant Inferred Mineral Resource acrosst the Tenements to >200,000
oz at a 0.5% g/t cut off, provided that the relevant milestone has been satisfied within the earlier of 3
years from settlement of the acquisition and 15 December 2027.
In the event that the 10-day VWAP in respect of the Deferred Consideration Shares calculated in accordance with
paragraph (c) above is less than $0.003 per Share at the relevant time, Javelin has agreed to (at its election):
(A)
seek refreshed shareholder approval for the issue of up to $1,000,000 worth of Shares to Delta (or its
nominee/s) at a deemed issue price equal to the 10-day VWAP up to and including the day prior to the
relevant vesting date above; or
(B)
pay the $1,000,000 in cash to Delta (or its nominee/s) into its nominated bank account.
Page 9
ASX Announcement
25 October 2024
Javelin will issue the Deferred Consideration Shares within 7 business days of achievement of the relevant
milestone being achieved or if a refreshed shareholder approval is required (contemplated above), the
Company will either:
(A)
pay the $1,000,000 in cash to Delta (or its nominee/s) into its nominated bank account within 2
business days of the relevant milestone attaching to the Deferred Consideration Shares being
achieved; or
(B)
issue the Deferred Consideration Shares to Delta (or its nominee/s) within 7 business days of the
refreshed shareholder approval being obtained or, should any such resolution(s) not be passed by the
requisite majority of shareholders, pay the $1,000,000 in cash to Delta (or its nominee/s) within 2
business days of such shareholder meeting.
Any such refreshed shareholder approval must be sought, and the relevant shareholder meeting convened and
held by the Company, as soon as practicable and within 3 months of the relevant milestone attaching to the
Deferred Consideration Shares being achieved.
The Company will seek shareholder approval for the issue of the Settlement Shares and Deferred Consideration
Shares at its upcoming AGM.
Conditions Precedent
The acquisition is subject to and conditional upon satisfaction of the following conditions (Conditions Precedent):
a) the Company completing a capital raising to raise a minimum of $2,500,000 (before costs) pursuant to a
placement of Shares to sophisticated and professional investors; and
b) the Company obtaining any and all Shareholder approvals required to undertake the issue of both the
Settlement Shares and Deferred Shares (assuming compliance with the requirements of the ASX waiver dated
9 October 2024) for the purposes of Listing Rule 7.1.
The Conditions Precedent must be satisfied on or before 5.00pm (WST) on the date that is 3 months after the date
of execution of the agreement.
Board changes – Delta right to appoint a Director
Under the terms of the agreement, Delta will have the right to nominate a director of Delta to the board of Javelin,
with effect from settlement of the acquisition.
This ASX announcement has been authorised for release by the Board of Javelin Minerals Limited.
-ENDSFor further information, please contact:
Brett Mitchell
Executive Chairman
Javelin Minerals Limited
info@javelinminerals.com.au
Paul Armstrong
Investor Relations Consultant
Read Corporate
paul@readcorporate.com.au
Page 10
ASX Announcement
25 October 2024
Competent Persons Statement
The information in this report that relates to Exploration Results is based on information compiled by Pedro Kastellorizos. Mr. Kastellorizos is the
Non-Executive Director of Javelin Minerals Limited and is a Member of the AusIMM of whom have sufficient experience relevant to the styles of
mineralisation under consideration and to the activity being reported to qualify as a Competent Person as defined in the 2012 Edition of the
Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves. Mr. Kastellorizos has verified the data disclosed in this
release and consent to the inclusion in this release of the matters based on the information in the form and context in which it appears. Mr
Kastellorizos has reviewed all relevant data for the aircore drilling program and reported the results accordingly.
The information in this announcement that relates to estimation and reporting of Mineral Resource at the Eureka Project Is based on information
compiled by Mr Brian Fitzpatrick. Mr Fitzpatrick is a member of the Australasian Institute of Mining and Metallurgy and has sufficient experience
which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a
Competent Person (CP) as defined in the 2012 Edition of the Australian Code for Reporting of Exploration Results, Mineral Resources and Ore
Reserves (the JORC Code). Mr Fitzpatrick is a full time employee of Cube Consulting Pty Ltd , which specialises in mineral resource estimation,
evaluation and exploration. Neither Mr Fitzpatrick nor Cube Consulting Pty Ltd holds any interest in Javelin Minerals, its related parties, or in any of
the mineral properties that are the subject of this announcement. Mr Fitzpatrick consented to the inclusion of the information in the original
announcements of TNT Mines in which it appears and all technical statements based on his information in the form and context in which it appears.
The information in this report / ASX release that relates to Exploration Results, Exploration Targets and Mineral Resources at Coogee is based on
information compiled and reviewed by Mr. Alfred Gillman, Director of independent consulting firm, Odessa Resource Pty Ltd. Mr. Gillman, a Fellow
and Chartered Professional of the Australasian Institute of Mining and Metallurgy (the AusIMM) and has sufficient experience relevant to the styles of
mineralisation under consideration and to the activity being reported to qualify as a Competent Person as defined in the 2012 Edition of the
Australasian Code for Reporting of Exploration Results, Exploration Targets and Mineral Resources. Mr Gillman is a full-time employee of Odessa
Resource Pty Ltd, who specialises in mineral resource estimation, evaluation, and exploration. Neither Mr Gillam nor Odessa Resource Pty Ltd holds
any interest in Javelin Minerals Limited, its related parties, or in any of the mineral properties that are the subject of this announcement. Mr Gillman
consents to the inclusion in this report / ASX release of the matters based on information in the form and context in which it appears. Additionally,
Mr Gillman confirms that the entity is not aware of any new information or data that materially affects the information contained in the ASX releases
referred to in this report.
Javelin Minerals Limited confirms that it is not aware of any new information or data that materially affects the information included in the original
ASX announcements and that all material assumptions and technical parameters underpinning Exploration Results, Exploration Targets and Mineral
Resources included in the original ASX announcements continue to apply and have no materially changed, and the forma and context in which the
relevant competent person’s findings are presented in this report have not been materially modified from the original ASX announcements.
Forward Statement
This news release contains “forward-looking information” within the meaning of applicable securities laws. Generally, any statements that are not
historical facts may contain forward-looking information, and forward looking information can be identified by the use of forward-looking terminology
such as “plans”, “expects” or “does not expect”, “is expected”, “budget” “scheduled”, “estimates”, “forecasts”, “intends”, “anticipates” or “does
not anticipate”, or “believes”, or variations of such words and phrases or indicates that certain actions, events or results “may”, “could”, “would”,
“might” or “will be” taken, “occur” or “be achieved.” Forward-looking information is based on certain factors and assumptions management believes
to be reasonable at the time such statements are made, including but not limited to, continued exploration activities, commodity prices, the
estimation of initial and sustaining capital requirements, the estimation of labour costs, the estimation of mineral reserves and resources,
assumptions with respect to currency fluctuations, the timing and amount of future exploration and development expenditures, receipt of required
regulatory approvals, the availability of necessary financing for the project, permitting and such other assumptions and factors as set out herein.
Forward-looking information is subject to known and unknown risks, uncertainties and other factors that may cause the actual results, level of
activity, performance or achievements of the Company to be materially different from those expressed or implied by such forward-looking
information, including but not limited to: risks related to changes in commodity prices; sources and cost of power and water for the Project; the
estimation of initial capital requirements; the lack of historical operations; the estimation of labour costs; general global markets and economic
conditions; risks associated with exploration of mineral deposits; the estimation of initial targeted mineral resource tonnage and grade for the project;
risks associated with uninsurable risks arising during the course of exploration; risks associated with currency fluctuations; environmental risks;
competition faced in securing experienced personnel; access to adequate infrastructure to support exploration activities; risks associated with
changes in the mining regulatory regime governing the Company and the Project; completion of the environmental assessment process; risks related
to regulatory and permitting delays; risks related to potential conflicts of interest; the reliance on key personnel; financing, capitalisation and liquidity
risks including the risk that the financing necessary to fund continued exploration and development activities at the project may not be available on
satisfactory terms, or at all; the risk of potential dilution through the issuance of additional common shares of the Company; the risk of litigation.
Although the Company has attempted to identify important factors that cause results not to be as anticipated, estimated or intended, there can be
no assurance that such forward-looking information will prove to be accurate, as actual results and future events could differ materially from those
anticipated in such information. Accordingly, readers should not place undue reliance on forward-looking information. Forward looking information
is made as of the date of this announcement and the Company does not undertake to update or revise any forward-looking information this is
included herein, except in accordance with applicable securities laws.
Page 11
ASX Announcement
25 October 2024
References
Hodgins, J. - Combined Annual Technical Report, Eureka Gold Project M24/189, M24/584, M24/585 and M24/586, 1 January 2017 to 31
December 2017. Combined Report C42-005. Central Iron Ore Ltd.
Revell, N - Combined Annual Technical Report, Eureka Gold Project M24/189, M24/584, M24/585 and M24/586, 1 January 2018 to 31
December 2018. Combined Report C42-005. Tyranna Resources Ltd.
Wilford J.W., Craig M.A., Tapley I. J. and Mauger A.J., 1998. Regolith-Landform Mapping and its Implications for Exploration over the Half
Moon Lake region, Gawler Craton, South Australia. CRC LEME Restricted Report 92R / E&M Report 542C. 91 pp. (Unpublished).
For further information, please refer to previous ASX announcements
(ASX:DLI – Formerly ASX:RDT and ASX:TNT):
ASX Announcement 21 October 2021: Eureka North Exploration Results Including High Grade Gold
ASX Announcement 24 June 2021: TNT Mines drilling increases Eureka Resource to 112,000 oz gold
ASX Announcement 15 June 2021: Eureka Auger Programme delineates extensive Gold Anomaly
ASX Announcement 15 February 2021: Investor Presentation – Eureka and Warriedar Gold Projects
ASX Announcement 9 February 2021: Strong initial Gold Results Delivered from Eureka South
ASX Announcement 23 October 2010: TNT acquires Historical Western Australian Gold Projects
ASX Announcement 7 October 2010: Eureka North Exploration Results
(ASX: JAV)
ASX Announcement: 26 August 2024: 158% Increase in Coogee Gold MRE
This Announcement contains no new information on existing Javelin Projects.
Page 12
ASX Announcement
25 October 2024
PROFORMA CAPITAL STRUCTURE
Pre Eureka acquisition
and Placement
Placement and Eureka
acquisition
4,276,846,180
1,700,000,000
5,976,846,180
Unlisted Options ($0.004 exp
30/11/2026)
154,300,007
750,000,000
754,300,007
Listed Options (JAVOA) – 31Dec-2028 – $0.002
2,813,422,931
-
2,813,422,931
Listed Options (JAVO) – 31Dec-2024 – $0.03
376,000,004
-
376,000,0004
Performance Rights
400,000,000
-
-
Shares
Post Placement and
Eureka acquisition
Page 13
ASX Announcement
25 October 2024
APPENDIX 1 - Significant Drilling Intercept Table Cut-off grade of 0.5 g/t Gold allowing for 2m internal dilution
All co-ordinates in GDA94/ MGA Zone 51
Drillhole Id
From (m)
To (m)
Drill Interval (m)
Au g/t
ERC01
ERC02
ERC02
ERC02
ERC04
ERC04
ERC05
ERC05
ERC05
ERC06
ERC06
ERC06
ERC07
ERC07
ERC08
ERC08
ERC08
ERC10
ERC10
ERC10
ERC11
ERC11
ERC11
ERC12
ERC12
ERC12
ERC15
ERC15
ERC15
ERC15
ERC16
ERC16
ERC17
ERC18
ERC18
ERC20
ERC20
ERC20
ERC21
ERC22
ERC23
ERC23
ERC24
ERC25
ERC25
ERC25
ERC26
90
122
131
139
30
58
102
105
114
36
60
89
59
91
144
148
164
43
54
72
56
58
70
47
57
59
4
16
27
36
40
45
78
36
60
130
135
140
162
146
20
53
69
50
59
72
41
101
127
132
140
34
62
104
113
118
40
72
92
60
96
146
155
165
51
59
79
57
67
79
52
58
60
15
22
32
41
44
52
83
39
71
133
136
141
167
150
21
54
70
52
63
73
46
11
5
1
1
4
4
2
8
4
4
12
3
1
5
2
7
1
8
5
7
1
9
9
5
1
1
11
6
5
5
4
7
5
3
11
3
1
1
5
4
1
1
1
2
4
1
5
2.445
2.808
8.580
3.290
1.158
5.773
6.830
3.303
0.810
4.168
7.875
2.793
1.850
1.248
1.485
2.479
2.750
1.008
1.262
1.539
1.190
1.563
1.864
1.860
1.140
0.790
3.938
1.273
0.632
1.438
1.468
2.079
2.402
1.377
5.508
1.160
1.900
0.590
0.968
1.685
2.230
1.510
1.750
5.110
0.840
17.000
1.060
Page 14
ASX Announcement
25 October 2024
Drillhole Id
ERC62
ERC62
ERC62
From (m)
57
62
69
To (m)
58
63
72
Drill Interval (m)
1
1
3
Au g/t
1.830
0.520
1.123
ERC39
ERC39
ERC39
ERC62
ERC62
ERC63
ERC64
ERC64
ERC65
ERC65
ERC66
ERC66
ERC67
ERC67
ERC68
ERC69
ERC69
ERC69
ERC70
ERC70
ERC72
ERC72
ERC72
ERC72
ERC73
ERC73
ERC74
ERC74
ERC74
ERC74
WRRC0001
WRRC0001
WRRC0002
WRRC0002
WRRC0002
WRRC0003
WRRC0003
WRRC0003
WRRC0004
WRRC0004
WRRC0005
WRRC0005
WRRC0008
WRRC0008
WRRC0008
WRRC0009
WRRC0009
23
27
53
75
86
80
221
233
74
85
53
67
63
72
46
72
90
116
7
21
10
30
37
40
32
59
50
66
85
125
51
75
3
13
51
65
78
102
75
78
6
9
148
232
240
4
9
24
28
57
76
89
81
224
234
76
86
55
70
65
77
49
73
102
118
13
23
11
33
38
46
35
63
58
69
86
126
64
79
6
14
52
66
79
107
76
79
7
10
156
233
241
7
12
1
1
4
1
3
1
3
1
2
1
2
3
2
5
3
1
12
2
6
2
1
3
1
6
3
4
8
3
1
1
13
4
3
1
1
1
1
5
1
1
1
1
8
1
1
3
3
0.970
0.650
134.520
3.130
3.463
1.550
3.503
0.730
2.455
0.6
Share your feedback
Discover