Yinnetharra & Mt Ida Project Updates
Released
Released
Announcement PDF
ASX ANNOUNCEMENT
2 October 2025
Yinnetharra & Mt Ida Project Updates
Highlights:
Yinnetharra
• The Yinnetharra Lithium Project is an exploration project covering more than 3,100km2
within the
Gascoyne Lithium Province of Western Australia
• The current Yinnetharra Lithium and Tantalum Project Mineral Resource Estimate1
(MRE) is:
ο 21.9Mt @ 1.0% Li2O (at 0.5% Li2O cut-off)
ο 39.4Mt @ 102ppm Ta2O5 (at 65ppm Ta2O5 cut-off)
• Detailed ground mapping and geochemical sampling at Yinnetharra through 2025 has already
identified six (6) priority regional exploration targets, including multiple targets on newly
acquired tenure
• Heritage Surveys have been completed and earthworks have been prepared
• Phase 1 Reverse Circulation (RC) program will focus on extending the high-grade Jameson
Prospect and its current MRE of 0.8Mt @ 1.66% Li2O
• High resolution Drone Magnetic Survey completed over priority prospects to expand and define
drill targets
• Reverse Circulation (RC) drill rig is mobilising to Yinnetharra this week to commence drilling
Mt Ida
• Mt Ida is an advanced lithium and tantalum project with a current MRE of:
o 14.6Mt @ 1.2% Li2O and 198ppm Ta2O5 (at 0.55% Li2O cut-off)
• Following the successful spin-out of Delta’s Gold rights2
, infill gold drilling conducted by Ballard
Mining (ASX: BM1) at Mt Ida has intercepted notable Lithium intervals that were drilled obliquely,
including;
o 37m @ 2.05% Li2O from 217m in DFS399 (Sister Sam)
o 17m @ 1.47% Li2O from 144m in IDRD381 (Sister Sam)
o 23m @ 1.04% Li2O from 212m in DFS066B (Timoni)
• As at 30 September 2025, Delta’s cash balance was $56.8M and additional ASX-listed investments
based on closing prices on 1 October of circa $100M3
.
Delta Lithium Limited (ASX: DLI) (“Delta” or “the Company”) is pleased to provide an exploration update
across its 100% owned Yinnetharra and Mt Ida Lithium Projects. The Company has mobilised an RC rig up
to the Yinnetharra Project to test up to six (6) high priority regional targets adjacent to Jameson (MRE 0.8Mt
@ 1.66% Li2O) and extending south then east toward Malinda along the 20km of prospective Leake Springs
metasediment unit. Program of Work (POW) approval has been received, heritage clearance surveying
completed and earthworks for track and sump construction largely completed. Drilling will commence this
1 Yinnetharra Lithium and Tantalum MRE Update released to the ASX 31st
March 2025
2 Results of Meeting released to the ASX 30th
June 2025
3 Shares in listed investments include 156M BM1 (subject to escrow), 5M UVA and 500M JAV (subject to escrow)
2
ASX ANNOUNCEMENT
2 October 2025
week to systematically test these high priority prospects which have been developed throughout 2025 via
extensive “boots on the ground” exploration across existing and newly acquired tenure.
Commenting on the project, Delta Lithium Managing Director, James Croser said;
“It’s great to be drilling at Yinnetharra again, testing around Jameson and greenfields targets generated by
the team during the year. There are several strong geochemical anomolies stretching south from Jameson
along the Leake Springs unit back to Malinda, which are fully mapped, permitted and ready to drill. Each
extra resource tonne we find at Yinnetharra continually improves the prospect of a positive FID once lithium
prices reach an economic and meaningful position.
“At Mt Ida, we continue to generate further upside potential, with new lithium hits resulting from some recent
Ballard drilling, including one of the best holes drilled into Sister Sam – 37m @ 2%Li2O – and a new LCT
pegmatite discovered in the Sister Sam footwall. If that is not compelling enough, further reinforcing our
belief in the high critical minerals value at Mt Ida in addition to the high-grade Lithium and Tantalum, there
is a strong case to pursue potential for co-product revenue from high-grade Rubidium which is strongly
correlated within the current MRE wireframes.
“It has been a strategic and measured year so far for Delta Lithium, with corporate activities conducted to
strengthen the Company’s project status and financial position taking precedence over lithium exploration.
But with the success of Ballard Mining’s ASX listing now confirmed, it is now an exciting time for Delta to
continue pursuing the significant potential value of our lithium assets.”
Yinnetharra Lithium Project
The Yinnetharra project is in the Gascoyne region of Western Australia targeting lithium mineralisation.
Delta Lithium has ~3,000km2
of project tenure 100% owned and as Farm-in Joint Ventures. A MRE update
for Yinnetharra was released in March 2025 of 21.9 Mt @ 1% Li2O and 75ppm Ta2O5 and an additional
17.5Mt @ 136ppm Ta2O5. Farm-In Joint Venture Agreements and acquisitions have expanded the
prospective stratigraphy to over 80km in length of the Leakes Springs metasediment package. Substantial
groundwork has been completed by the geological team with greater than 25 prospects identified and many
areas left to explore – see Figure 1.
3
ASX ANNOUNCEMENT
2 October 2025
Figure 1: Yinnetharra Project Tenure with identified Lithium Prospects
Lithium resources at Malinda are present in three main pegmatites: the M1, M36 and M47, with smaller
resources at M42, M20, M67 and M69. Mineralisation extends from surface to a depth of greater than 300m.
The recent MRE update has now classified 74% of the Resource as Indicated underpinning future studies
and project development pathways – See Figure 2.
The Malinda Project is well advanced with DFS-level metallurgy and geotechnical studies4
completed and
the mining lease application has been submitted. The investigation of various mining scenarios are well
advanced, while the regional tenure presents significant upside for additional resource tonnes.
4 Yinnetharra Operational & Metallurgical test work update released to the ASX 21st
January 2025
4
ASX ANNOUNCEMENT
2 October 2025
Figure 2: View to Malinda MRE Classification
5
ASX ANNOUNCEMENT
2 October 2025
Jameson
Jameson represents a high priority target in relation to exploration and resource growth. The current
Jameson MRE of 0.8Mt @ 1.66% Li2O is open down plunge and will be tested during this program. The
area is structurally complex with several deformational and folding events. Structural analysis undertaken
has improved understanding of the paragenesis and subsequent mineralisation which is hosted in these
structural traps.
The detailed structural review identified the F2 fold hinges and later stage faults as priority targets for future
exploration. The current surface data correlates with this thesis, suggesting Lithium-enriched fluids have
mobilised through these potential structural trap zones – See Figure 3) The majority of this Phase 1 drilling
program is targeting these fold hinges, limbs and faults which possess elevated discrete surface anomalies
and represent compelling targets. These targets have never been drill tested and have an identical structural
setting to the J1 pegmatite.
Figure 3: Plan View to Jameson with planned drilling
6
ASX ANNOUNCEMENT
2 October 2025
Yinnetharra Regional Exploration
As part of the regional campaign, exploration work has continued across the 3000km2
Project and JV tenure.
The team have been conducting systematic surface exploration across prospective areas and generated
over 25 prospects (Figure 1) with many areas not yet explored. This greenfields geological work comprised
of detailed mapping, rock chip and auger sampling as well as a high-resolution drone magnetic survey (EM).
The EM survey was completed in September and flown at 25m spacings and 20m vertical height to produce
a high-resolution map which will aid with structural interpretations and target generation. The culmination of
these greenfields geological workstreams has resulted in six priority drill targets that will be the focus of the
Phase 1 drill program, all of which are hosted in the Leake Springs Metamorphics unit which is also the
preferential host of Jameson and Malinda deposits – see Figure 4.
Figure 4: Plan View to Yinnetharra MRE’s and drill targets for current exploration programs
7
ASX ANNOUNCEMENT
2 October 2025
Mason’s Prospect is a 500m long target characterised by enriched Lithium, Caesium, Tantalum (LCT)
pegmatites located 3km along strike from Jamesons within the same host rocks. The first phase of drilling
will target these northwest trending pegmatites at depth and along the defined strike.
Yamazaki Prospect represents a compelling exploration target sitting just 8km from Jameson and 12km
from Malinda along the margin of the continuous Leake Springs unit. It hosts a 4km long Lithium surface
geochemical anomaly that has never been drilled – See Figure 5. First pass drilling will focus on the primary
Lithium anomalies while Phase 2 and 3 drilling have been planned pending successful results.
Figure 5: Plan View to Yamazaki prospect showing surface anomalism
8
ASX ANNOUNCEMENT
2 October 2025
East Calypso Prospect is one of the highest ranked targets beyond Jameson. This prospect sits immediately
adjacent to the Thirty-Three suites Granite within the Leak Springs which is a mirror image of the geological
setting at the Malinda deposit. Contrary to the general LCT models, the 21.1Mt @ 1% Li2O at Malinda is
located only a few hundred metres away from the apparent source Granite which is identical to East Calypso
to the South. East Calypso is also strengthened by the same host rocks and consistently high Lithium /
Caesium levels in the surface dataset, while Caesium is generally very immobile and does not travel far
from the source – see Figure 6. These E-W trending pegmatites will be tested thoroughly during this current
program.
Figure 6: Plan Views to East Calypso with surface data showing Lithium & Caesium anomalism
North Talisker and Caribou both represent strong targets with each hosting consistent LCT signatures and
rock chips as high as 822ppm Ta2O5. North Talisker has never been drilled while only 13 holes were
completed at Caribou South last year with follow up work identified at that time.
9
ASX ANNOUNCEMENT
2 October 2025
Approvals and Project Development
A Mining Lease application M09/185 has been submitted for the Malinda Mining Area (Figure 7) and Native
Title negotiations are ongoing.
Environmental permitting has advanced with all flora and fauna field surveys now completed, and technical
reports being finalised. No new or introduced environmental risks have been identified from the most recent
field surveys.
The approvals and permitting strategy remain on track, with the submissions to regulators planned for
completion in Q4 2025.
Figure 7: Plan View to submitted Mining Lease application.
10
ASX ANNOUNCEMENT
2 October 2025
Delta is advancing the water exploration program at Yinnetharra via Passive Seismic surveying, which has
been completed across the target terrain and successfully mapped out the paleochannel bedrock in these
locations – see Figure 8. Probe holes will be completed during the upcoming drill program to confirm the
location of the modelled thalweg, that being the deepest and most productive part of a paleochannel system.
This confirmatory drilling will allow for the precise planning of water production bore drilling and construction
to follow. The Water Development workstream serves to identify a reliable subsurface water source
supporting Projects’ mining and processing requirements for feasibility, planning and approvals purposes.
Water is a crucial aspect of mine feasibility and water investigations are ongoing and in parallel with current
exploration activities.
Figure 8: View to Passive Seismic Survey Results mapping paleochannels
11
ASX ANNOUNCEMENT
2 October 2025
Mt Ida Update
During recent and ongoing gold-focused drilling at Mt Ida by Ballard Mining (ASX:BM1), LCT pegmatites
have been intercepted multiple times due to the spatial nature of both the pegmatites and the gold lodes
proximal to the Copperfield granite – see table 1 below for significant intervals. Ballard has all gold mineral
rights at Mt Ida. Under the operation of the current Mineral Rights Agreement with Ballard, Delta is provided
with free supply of the intercepted pegmatite drill returns from Ballard’s drilling, with additional lithium-suite
assaying simple to progress at Delta’s cost when desired. This has the effect of very low cost resource
drilling that has added confidence, extending specific areas of Delta’s LCT models including the interception
of a new blind pegmatite discovery in the footwall of Sister Sam – see Figure 9. This new pegmatite
demonstrates good width and identical mineralogy to the nearby Sister Sam resource, including elevated
tantalum and rubidium assays, and will be followed up further in future drill programs. Numerous additional
pegmatites have been intercepted by the current gold drilling and are currently in the lab awaiting assay.
Figure 9: 20m Sister Sam Cross section illustrating recent significant results returned from Gold drilling including the identification
of a new pegmatite in the footwall.
12
ASX ANNOUNCEMENT
2 October 2025
HoleID From To Length Li2O % Ta2O5 ppm Rb2O % Location
DFS060 44 50 6 1.97 195 0.12 Timoni Resource Extension
DFS063 47 64 17 0.44 209 0.25 Timoni
DFS066B 67 92 25 0.82 140 0.41 Timoni
and 121 144 23 1.04 68 0.51 Timoni
DFS399 217 254 37 2.05 254 0.71 Sister Sam
IDRD333 310 320 10 0.82 239 0.58 New Pegmatite Discovery
IDRD362A 261 279 18 1.05 147 0.42 Timoni
IDRD381 144 161 17 1.47 209 0.62 Sister Sam
Table 1: List of Significant Intervals Intercepted during Gold resource drilling (drillhole orientations were designed to intercept the
gold lodes, not pegmatites meaning these intervals do not represent true width)
These new lithium results and a new pegmatite discovery are extremely encouraging for the Mt Ida Lithium
Project and confirm the high potential of discovering further resources at depth and along strike of the
existing Lithium MRE with future drilling.
Furthermore, a thorough review of the Mt Ida database has confirmed that the Mt Ida LCT pegmatite system
also hosts high-grade rubidium, coincident and seemingly correlated with the existing high-grade lithium
and tantalum mineralised zones. Very high-grade rubidium intercepts have been assayed, for example up
to 5m @ 1.79% Rb2O as in hole GCS0013. Table 2 below includes a small selection of many significant
rubidium intercepts contained within the existing Mt Ida LCT pegmatites. The rubidium is completely
contained within the existing MRE, potentially adding significant value as a co-product to the lithia
production at the Mt Ida Project, by reporting to the mica pre-float concentration part of the existing Mt Ida
WOF flowsheet design. As a result, this new data will be incorporated into a MRE update for Mt Ida (inclusive
of Rb), which Delta aims to complete in the December Quarter.
HoleID From To Length Li2O % Ta2O5 ppm Rb2O %
IDRD162 275.96 318 42.04 1.77 382 0.71
IDRD077W2 385.1 443.03 57.93 1.37 187 0.55
IDRD077 398.31 436.58 38.27 1.20 146 0.56
IDRD178 353 390.93 37.93 1.26 204 0.54
DFS399 217 254 37 2.05 254 0.71
IDRD229W1 676 740.96 64.96 1.1 122 0.46
SSRD058 574.85 603.58 28.73 1.6 112 0.51
IDRD041 142.92 169 26.08 1 65 0.51
GCS0077 63 89 21 1 203 0.35
GCS0013 55 60 5 0.84 44 1.79
Table 2: List of Significant Rubidium Intercepts contained within current Mt Ida MRE as previously released
13
ASX ANNOUNCEMENT
2 October 2025
Next Steps
Yinnetharra
• Complete Priority Regional drilling at Yinnetharra
• Complete Phase 2 and follow up drilling at Yinnetharra
• Continued regional exploration of recently acquired Minerals 260 tenure
• Continue to advance project development and approvals work programs
Mount Ida
• Update MRE in December Quarter to incorporate new data inclusive Rubidium
• Further investigate Rubidium metallurgy in the Mt Ida flowsheet
Release authorised by the Managing Director on behalf of the Board of Delta Lithium Limited.
For further information, please contact:
Delta Lithium Investor/Media Enquiries
James Croser, Managing Director Sodali & Co
Peter Gilford, CFO & Company Secretary Russell Quinn +61 403 322 097
+61 8 6109 0104
info@deltalithium.com.au
About Delta Lithium
Delta Lithium (ASX: DLI) is an exploration and development company focused on bringing high-quality, lithium-bearing pegmatite deposits, located
in Western Australia, into production. With current global JORC compliant resources of 36.5Mt@1.0% Li2O, strong balance sheet and an
experienced team driving the exploration and development workstreams, Delta Lithium is rapidly advancing its Projects.
The Mt Ida Project has coincident gold and lithium orebodies and holds a critical advantage over other developers with existing Mining Leases and
an approved Mining Proposal. Delta Lithium is pursuing a development pathway to unlock maximum value for shareholders. Delta has recently spun
out its gold assets into Ballard mining on 14th
July 2025 and retains a 46% equity stake in this company.
Delta Lithium also holds the highly prospective Yinnetharra Lithium Project, with exciting lithium discoveries at the Malinda and Jamesons prospects.
The Company is currently conducting exploration activities at Yinnetharra with fieldwork commenced for 2025 across our large tenure package,
testing additional targets and aiming to build on the Maiden Resource at Malinda.
Competent Person's Statement
Information in this Announcement that relates to exploration results is based upon work undertaken by Mr. Shane Murray, a Competent Person
who is a Member of the Australasian Institute of Geoscientists (AIG). Mr. Murray has sufficient experience that is relevant to the style of
mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a ‘Competent Person’ as defined in
the 2012 Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’ (JORC Code). Mr. Murray
is an employee of Delta Lithium Limited and consents to the inclusion in this announcement of the matters based on his information in the form and
context in which it appears.
Refer to www.deltalithium.com.au for past ASX announcements.
Past Exploration results and Mineral Resource Estimates reported in this announcement have been previously prepared and disclosed by Delta
Lithium in accordance with JORC 2012. The Company confirms that it is not aware of any new information or data that materially affects the
information included in these market announcements. The Company confirms that the form and content in which the Competent Person's findings
are presented here have not been materially modified from the original market announcement, and all material assumptions and technical
parameters underpinning Mineral Resource Estimates in the relevant market announcement continue to apply and have not materially changed.
Refer to www.deltalithium.com.au for details on past exploration results and Mineral Resource Estimates.
Disclaimer
This release may include forward-looking and aspirational statements. These statements are based on Delta Lithium management’s expectations
and beliefs concerning future events as of the time of the release of this announcement. Forward-looking and aspirational statements are necessarily
subject to risks, uncertainties and other factors, some of which are outside the control of Delta Lithium, which could cause actual results to differ
materially from such statements. Delta Lithium makes no undertaking to subsequently update or revise the forward looking or aspirational statements
made in this release to reflect events or circumstances after the date of this release, except as required by applicable laws and the ASX Listing
Refer to www.deltalithium.com.au for past ASX announcements.
14
ASX ANNOUNCEMENT
2 October 2025
Appendix 1 A – Lithium Assay Results from recent Mt Ida Drilling Information
Appendix 1 B - Recent collar information from gold drilling that contained economic lithium
HOLEID DEPTH EAST NORTH RL AZIMUTH DIP
DFS047 160 253287 6778573 476.311 50.99 -59.97
DFS060 135 253272 6778642 471.099 56.58 -60.14
DFS062 192 253247.3 6778625 472.323 55.28 -59.43
DFS063 216 253236.9 6778616 472.52 55.88 -60.37
DFS066B 255.9 253192.9 6778613 471.317 55.42 -62.07
DFS399 387.1 253353.7 6778098 474.746 56.11 -60.86
IDRD325 462 253419 6778001 476 55.56 -61.21
IDRD327 378 253451.6 6777943 476.18 54.93 -60.39
IDRD333 450 253369.3 6777995 475.719 61.66 -62.06
IDRD354 252 252901.3 6778643 472.067 34.8 -67.3
IDRD362A 312 252785 6778641 473.579 59.78 -56.14
IDRD381 247.3 253475.1 6778176 474.664 61.25 -62.58
HoleID From To Length Li2O % Ta2O5 ppm Fe2O3 % Rb2O %
DFS047 147 155 8 0.42 172 2.45 0.35
DFS060 44 50 6 1.97 195 0.83 0.12
DFS062 44 50 6 0.96 270 0.89 0.08
DFS063 47 64 17 0.44 209 3.00 0.25
and 118 122 4 1.35 37 1.13 0.12
DFS066B 67 92 25 0.82 140 1.77 0.41
and 121 144 23 1.04 68 0.47 0.51
DFS399 217 254 37 2.05 254 0.31 0.71
IDRD325 304 307 3 0.38 171 2.76 0.27
IDRD327 269 275 6 0.9 322 1.11 0.12
IDRD333 310 320 10 0.82 239 0.73 0.58
IDRD354 135 138 3 1.11 231 3.06 0.41
and 182 197 15 0.72 343 1.43 0.31
IDRD362A 261 279 18 1.05 147 2.32 0.42
IDRD381 144 161 17 1.47 209 0.53 0.67
15
ASX ANNOUNCEMENT
2 October 2025
Appendix 2 A - Lithium MRE Group summary table
Delta Lithium Group Mineral Resource estimate (Li₂O only)
Resource category
Cut-off
grade
(Li₂O%)
Li₂O Ta₂O₅
Tonnes
(Mt)
Grade
(% Li₂O)
Li₂O
(Kt)
Grade
(Ta₂O₅ ppm)
Yinnetharra
Measured
0.5
- - - -
Indicated 16.1 1.0 158 77
Inferred 5.8 0.9 54 69
Total Resource 21.9 1.0 212 75
Mt Ida
Measured
0.5
- - - -
Indicated 7.8 1.3 104 224
Inferred 6.8 1.1 76 154
Total Resource 14.6 1.2 180 191
Total Measured - - - -
Total Indicated 23.9 1.1 262 125
Total Inferred 12.6 1.0 130 115
Total 36.5 1.1 392 121
16
ASX ANNOUNCEMENT
2 October 2025
Appendix 2 B - Yinnetharra Tantalum Only MRE
Yinnetharra Tantalum Only Resource March 2025
Area
Resource
category
Cut-off
grade
(Ta2O5ppm)
Tonnes (Mt) Li2O% Li2O (Kt) Ta2O5 ppm Ta2O5 (Kt)
MT1
Measured
65
- - - - -
Indicated 3.7 0.1 3 82 0.3
Inferred 0.6 0.0 0 94 0.1
Total Resource 4.3 0.1 4 84 0.4
MT20
Measured
65
- - - - -
Indicated - - - - -
Inferred 0.2 0.1 0 115 0.0
Total Resource 0.2 0.1 0 115 0.0
MT36
Measured
65
- - - - -
Indicated 4.3 0.1 5 123 0.5
Inferred 0.6 0.1 1 106 0.1
Total Resource 4.9 0.1 5 121 0.6
MT42
Measured
65
- - - - -
Indicated 0.3 0.2 1 175 0.1
Inferred 2.5 0.1 2 208 0.5
Total Resource 2.8 0.1 3 204 0.6
MT47
Measured
65
- - - - -
Indicated 2.1 0.1 3 186 0.4
Inferred 0.5 0.1 0 257 0.1
Total Resource 2.5 0.1 3 199 0.5
MT67
Measured
65
- - - - -
Indicated - - - - -
Inferred 0.6 0.2 1 113 0.1
Total Resource 0.6 0.2 1 113 0.1
MT69
Measured
65
- - - - -
Indicated - - - - -
Inferred 1.6 0.1 2 105 0.2
Total Resource 1.6 0.1 2 105 0.2
MT70
Measured
65
- - - - -
Indicated - - - - -
Inferred 0.7 0.1 1 161 0.1
Total Resource 0.7 0.1 1 161 0.1
Total Measured - - - -
Total Indicated 10.4 0.1 12 122 1.3
Total Inferred 7.1 0.1 7 156 1.1
Total 17.5 0.1 19 136 2.4
17
ASX ANNOUNCEMENT
2 October 2025
Appendix 3 – Yinnetharra JORC Tables
JORC Code, 2012 Edition
Table 1; Section 1: Sampling Techniques and Data Yinnetharra – (Exploration & Metallurgical)
Criteria Explanation Commentary
Sampling
techniques
Nature and quality of sampling (e.g. cut
channels, random chips, or specific
specialised industry standard
measurement tools appropriate to the
minerals under investigation, such as
down hole gamma sondes, or handheld
XRF instruments, etc). These examples
should not be taken as limiting the
broad meaning of sampling. Include
reference to measures taken to ensure
sample representivity and the
appropriate calibration of any
measurement tools or systems used.
Aspects of the determination of
mineralisation that are Material to the
Public Report. In cases where ‘industry
standard’ work has been done this
would be relatively simple (e.g. ‘reverse
circulation drilling was used to obtain 1
m samples from which 3 kg was
pulverised to produce a 30 g charge for
fire assay’). In other cases more
explanation may be required, such as
where there is coarse gold that has
inherent sampling problems. Unusual
commodities or mineralisation types
(e.g. submarine nodules) may warrant
disclosure of detailed information
• Diamond (DD) and reverse circulation (RC)
drilling has been carried out by Delta Lithium at
the Yinnetharra project, encompassing the
Malinda and Jameson prospects
• RC samples are collected from a static cone
splitter mounted directly below the cyclone on
the rig
• DD sampling is carried out to
lithological/alteration domains with lengths
between 0.3-1.1m
• Limited historic data has been supplied, reverse
circulation (RC) drilling and semi-quantative
XRD analysis have been completed at the
project. Historic drilling referenced has been
carried out by Segue Resources and
Electrostate
• Historic sampling of RC drilling has been carried
out via a static cone splitter mounted beneath a
cyclone return system to produce a
representative sample, or via scoop
• These methods of sampling are considered to be
appropriate for this style of exploration
Drilling techniques Drill type (e.g. core, reverse circulation,
open-hole hammer, rotary air blast,
auger, Bangka, sonic, etc) and details
(e.g. core diameter, triple or standard
tube, depth of diamond tails, face-
sampling bit or other type, whether core
is oriented and if so, by what method,
etc).
• Diamond drilling has been carried out by
Frontline Drilling utilising a Sandvik DE880 truck
mounted multipurpose rig and is HQ or NQ
diameter, or PQ for metallurgical drilling.
• Other dedicated metallurgy holes were drilled
perpendicular mainly utilising HQ2 core which
was then half cored.
• RC drilling has carried out by Frontline Drilling
using a Schramm 850 rig.
• Current RC drilling is being carried out using a
track mounted Schramm rig by Strike Drilling
• Some RC precollars have been completed,
diamond tails average up to 225m depth
• Historic RC drilling was completed using a T450
drill rig with external booster and auxiliary air
unit, or unspecified methods utilising a 133mm
face sampling bit
• It is assumed industry standard drilling methods
and equipment were utilised for all drilling
Drill sample
recovery
Method of recording and assessing
core and chip sample recoveries and
results assessed. Measures taken to
maximise sample recovery and ensure
representative nature of the samples.
Whether a relationship exists between
sample recovery and grade and
whether sample bias may have
occurred due to preferential loss/gain of
fine/coarse material.
• Sample condition is recorded for every RC drill
metre including noting the presence of water or
minimal sample return, inspections of rigs are
carried out daily
• Recovery on diamond core is recorded by
measuring the core metre by metre
• Poor recoveries were occasionally encountered
in near surface drilling of the pegmatite due to
the weathered nature
• Historic RC recoveries were visually estimated
on the rig, bulk reject sample from the splitter
was retained on site in green bags for use in
weighing and calculating drill recoveries at a
later date if required
• Sample weights were recorded by the laboratory
18
ASX ANNOUNCEMENT
2 October 2025
Criteria Explanation Commentary
Logging Whether core and chip samples have
been geologically and geotechnically
logged to a level of detail to support
appropriate Mineral Resource
estimation, mining studies and
metallurgical studies. Whether logging
is qualitative or quantitative in nature.
Core (or costean, channel, etc)
photography. The total length and
percentage of the relevant intersections
logged.
• Quantitative and qualitative geological logging of
drillholes adheres to company policy and
includes lithology, mineralogy, alteration, veining
and weathering
• Diamond core (including metallurgical core) and
RC chip logging records lithology, mineralogy,
alteration, weathering, veining, RQD, SG and
structural data
• All diamond drillholes and RC chip trays are
photographed in full
• A complete quantitative and qualitative logging
suite was supplied for historic drilling including
lithology, alteration, mineralogy, veining and
weathering
• Additional TIMA analysis was completed on
pulps and core to log mineralogical abundances
throughout selected samples.
• No historic chip photography has been supplied
• Logging is of a level suitable to support Mineral
resource estimates and subsequent mining
studies
Sub-sampling
techniques and
sample
preparation
If core, whether cut or sawn and
whether quarter, half or all core taken.
If non-core, whether riffled, tube
sampled, rotary split, etc and whether
sampled wet or dry. For all sample
types, the nature, quality and
appropriateness of the sample
preparation technique.
Quality control procedures adopted for
all sub-sampling stages to maximise
representivity of samples.
Measures taken to ensure that the
sampling is representative of the in situ
material collected, including for
instance results for field
duplicate/second-half sampling.
Whether sample sizes are appropriate
to the grain size of the material being
sampled.
• DD sampling is undertaken by
lithological/alteration domain to a maximum of
1.1m and a minimum of 0.3m. Core is cut in half
with one half sent to the lab and one half
retained in the core tray. Metallurgical drilling
was often quarter core sampled to retain
maximum material for testwork
• Occasional wet RC samples are encountered,
extra cleaning of the splitter is carried out
afterward
• RC and core samples have been analysed for Li
suite elements by ALS Laboratories, Samples
are crushed and pulverised to 85% passing 75
microns for peroxide fusion digest followed by
ICPOES or ICPMS determination
• Historic RC sampling methods included single
metre static cone split from the rig or via scoop
from the green bags, field duplicates were
inserted at a rate of 1:20 within the pegmatite
zones
• Historic
Share your feedback
Discover