Mt Ida Drilling Update
Released
Released
Announcement PDF
ASX ANNOUNCEMENT
8 August 2023
Drilling update for Mt Ida Lithium
Highlights:
•
The Mt Ida Lithium Project in the Goldfields region of Western Australia, remains on track for
approval to mine later this year.
o
o
•
Granted Mining Lease, heritage and Mining Proposal submitted with objective to potentially
commence a DSO Lithium mining operation before Christmas 2023
Newly reported drilling results include:
o
27m @ 1.3% Li2O from 848m in IDRD245
o
20.9m @ 1.4% Li2O from 675.4 m in IDRD036N2
o
o
•
Initial Maiden Resource Estimate of 12.7Mt @ 1.2% Li2O reported in October 2022 1
21.2m @ 0.5% Li2O from 561.1m in SPRD045
17.8m @ 1% Li2O from 477.9m in SPRD041N2
5 Rigs demobilised leaving 3 rigs continuing with exploration, engineering, metallurgy and hydrology
holes, whilst the Resource Update is prepared.
Delta Lithium Limited (ASX:DLI) (“Delta” or the “Company”), is pleased to announce an update for
activities at both its 100% owned Lithium Projects at the Mt Ida Lithium Project in the Goldfields region of
Western Australia.
Resource drilling is slowing down at Mt Ida in preparation for a Mineral Resource Update scheduled for
September 2023. Exploration drilling is ongoing with complete results for the western portion of the granite
expected soon. Three drill rigs will remain at Mt Ida undertaking exploration, sterilisation, engineering,
metallurgy and hydrology drilling.
Commenting on the results Executive Chairman, David Flanagan said;
“This is now bringing us towards the end of the resource drilling to support a new mining operation from Q4
2023. Mt Ida is the only lithium project in the current Western Australian mines department currently under
consideration. It is going to be the next lithium mine in WA.
The team have worked unbelievably hard and I am so proud of them all. Very few mining companies have
achieved so much with so few.
A true speed to market strategy requires running multiple tasks in parallel accross mining, marketing,
approvals, process engineering and exploration. Its not just moving quickly its about being attentive,
responsive and making lots of decisions.
That means our shareholders get the best opportunity for exposure to the highest possible pricing”
To date the Company has completed 471 holes for 97,965 metres (within calendar year 2023) at Mt Ida.
This announcement relates to results received from 28 Diamond Drill holes (DD). A further 40 holes from
the Mt Ida Project are in the process of being assayed with results due in batches throughout the next few
months.
1
ASX Announcement 19 October 2022 and Appendix 1
ASX ANNOUNCEMENT
8 August 2023
Figure 1: Mt Ida Plan showing tenements, resource outlines
Infill results from Mt Ida further demonstrate quality Lithium intercepts from the Mt Ida Project.
An aggressive program of infill and extensional drilling is coming to a close at Mt Ida. Much of the drilling
has been designed to upgrade the resource from inferred to indicated classification.
Results received from Sister Sam and Timoni continue to demonstrate consistent high-grade lithium
mineralisation. These results are progressively increasing confidence in the mining plans that are under
development in advance of the final granting of the Mining Proposal that has been submitted to the Western
Australian Department of Mines, Industry Regulation and Safety (DMIRS).
ASX ANNOUNCEMENT
8 August 2023
Figure 2: Detailed plan view of Sister Sam and Timoni and Sparrow showing latest results from infill drilling.
Release authorised by the Executive Chairman on behalf of the Board of Delta Lithium Limited.
For further information, please contact:
Delta Lithium
David Flanagan, Chairman
+61 8 6109 0104
info@deltalithium.com.au
Investor/Media Enquiries
Citadel-MAGNUS
Michael Weir +61 402 347 032
Jono van Hazel +61 411 564 969
ASX ANNOUNCEMENT
8 August 2023
About Delta Lithium
Delta Lithium (ASX: DLI) is an exploration and development company focused on bringing high-quality, lithium-bearing
pegmatite deposits, located in Western Australia, into production. With a strong balance sheet and an experienced
team driving the exploration and development workstreams, Delta Lithium is rapidly advancing its Mt Ida Lithium Project
towards production. The Mt Ida Lithium Project holds a critical advantage over other lithium developers with existing
Mining Leases in place. To capitalise on the prevailing buoyant lithium market, Delta Lithium is pursuing a rapid
development pathway to unlock maximum value for shareholders.
Delta Lithium also holds the highly prospective Yinnetharra Lithium Project that is already showing signs of becoming
one of Australia’s most exciting lithium regions. The Company is currently undergoing an extensive 400 drill hole
campaign to be completed throughout 2023.
Competent Person's Statement
Information in this Announcement that relates to exploration results is based upon work undertaken by Mr. Charles
Hughes, a Competent Person who is a Member of the Australasian Institute of Mining and Metallurgy (AUSIMM). Mr.
Hughes has sufficient experience that is relevant to the style of mineralisation and type of deposit under consideration
and to the activity which he is undertaking to qualify as a ‘Competent Person’ as defined in the 2012 Edition of the
‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’ (JORC Code). Mr.
Hughes is an employee of Delta Lithium Limited and consents to the inclusion in this announcement of the matters
based on his information in the form and context in which it appears.
Refer to www.deltalitjium.com.au for past ASX announcements.
Past Exploration results and Mineral Resource Estimates reported in this announcement have been previously
prepared and disclosed by Delta Lithium in accordance with JORC 2012. The Company confirms that it is not aware
of any new information or data that materially affects the information included in these market announcements. The
Company confirms that the form and content in which the Competent Person's findings are presented here have not
been materially modified from the original market announcement, and all material assumptions and technical
parameters underpinning Mineral Resource Estimates in the relevant market announcement continue to apply and
have not materially changed. Refer to www.deltalithium.com.au for details on past exploration results and Mineral
Resource Estimates.
Disclaimer
This release may include forward-looking and aspirational statements. These statements are based on Delta Lithium
management’s expectations and beliefs concerning future events as of the time of the release of this announcement.
Forward-looking and aspirational statements are necessarily subject to risks, uncertainties and other factors, some of
which are outside the control of Delta Lithium, that could cause actual results to differ materially from such statements.
Delta Lithium makes no undertaking to subsequently update or revise the forward looking or aspirational statements
made in this release to reflect events or circumstances after the date of this release, except as required by applicable
laws and the ASX Listing Rules.
ASX ANNOUNCEMENT
8 August 2023
Appendix 1: Mineral Resource Estimate Table (Refer to ASX Announcement 19 October 2022).
Resource category
Total Measured
Total Indicated
Total Inferred
Total
Cut-off
grade
Li2O
Tonnes
(Li2O%)
(Mt)
0.55
0.55
0.55
3.3
9.3
12.7
Grade
(%
Li2O)
1.4
1.1
1.2
Li2O
(Kt)
46
102
148
Ta2O5
Grade
(Ta2O5
ppm)
246
193
207
Table 1: Newly reported assay results for the Mt Ida Project better than 3m @ 1% Li2O
HoleID
From
To
Width (m)
Li2O %
Ta2O5
ppm
Fe2O3 %
IDRD245
848.0
875.0
27.0
1.3
107.1
0.8
SPRD045
561.1
582.3
10.6
0.7
47.6
2.6
IDRD036N2
675.4
696.3
20.9
1.4
96.0
0.5
SPRD041N2
477.9
498.7
17.8
1.0
69.9
2.1
IDRD245N2
960.7
975.6
14.9
1.2
121.6
1.1
IDRD036N2
705.0
719.7
14.7
1.1
167.0
2.2
SPRD036N1
371.2
385.1
13.9
0.8
SPRD041
467.6
493.5
12.9
0.9
80.0
3.4
IDRD251
159.0
170.0
11.0
1.7
218.4
1.1
IDRD243
756.2
766.0
9.8
1.6
185.0
0.6
IDRD253
197.0
206.0
9.0
1.1
SPRD038
446.0
454.9
8.8
0.9
81.0
1.3
IDRD245N1
910.4
919.0
8.6
1.3
52.7
2.9
IDRD253
213.8
222.1
8.3
0.8
IDRD237
405.5
422.0
8.2
0.8
84.5
0.9
IDRD236
392.5
399.7
7.2
0.9
92.0
0.5
SPRD035
352.2
359.4
7.2
0.7
89.0
4.0
SPRD038
433.3
440.3
6.4
1.1
213.0
0.4
IDRD254
197.4
203.6
6.2
0.7
IDEX015
683.0
689.0
6.0
0.9
46.0
1.1
IDRD195
78.4
84.3
.0
1.8
250.0
0.4
ASX ANNOUNCEMENT
8 August 2023
IDRD036N2
733.0
738.4
5.4
1.0
119.0
2.1
SPRD036N1
345.0
349.0
4.0
0.8
SPRD041N1
464.0
493.2
3.8
1.8
61.0
2.0
IDRD036N4
694.4
707.3
3.3
1.4
96.2
7.4
IDRD036N4
721.0
724.3
3.3
1.4
203.6
1.6
SPRD039
418.6
424.8
6.1
1
107.4
0.7
IDRD252
161.0
164.0
3.0
1.4
251.6
1.3
Table 2: Drill hole details for newly reported holes at Mt Ida
HoleID
MGA_East
MGA_North
MGA_RL
Dip
MGA_Azi
Depth
IDEX015
252544
6779479
476
-53.67
162.3
748.1
IDRD036N2
252724
6778529
472
-50.89
102.29
802
IDRD036N4
252725.35
6778521.84
474.96
-53.38
99.97
789.9
IDRD195
253571.56
6778113.36
475.13
-60
64.57
102.7
IDRD236
252795
6778954
476
-60.64
155.43
442.23
IDRD237
252828
6779004
476
-60.36
151.74
468.5
IDRD243
252654
6779312
472
-50.68
150.77
774.6
IDRD245
252511
6778526
472
-51.02
86.8
931
IDRD245N1
252511
6778526
472
-56.31
97.37
996.9
IDRD245N2
252511
6778526
472
-51.02
86.8
1028.45
IDRD251
253436.46
6778116.81
475.12
-64.55
74.06
215
IDRD252
253446.23
6778240.15
473.97
-60.09
114.79
191
IDRD253
253019.55
6778822.12
471.02
-55.49
195.01
241.1
SPRD035
251624
6780792
459
-57.8
140.11
422
SPRD036N1
251585.14
6780764.19
460.33
-55.89
137.3
423.8
SPRD038
251564
6780882
459
-56.56
147.25
490
SPRD039
251500
6780854
459
-52.64
142
535.1
SPRD041
251459
6780905
459
-55.93
142.24
565.1
SPRD041N1
251459
6780905
459
-56.77
143.84
557.4
SPRD041N2
251459
6780905
459
-57.82
148.35
531.7
SPRD045
251353
6780963
459
-56.68
141.41
210
ASX ANNOUNCEMENT
8 August 2023
JORC Code, 2012 Edition
Table 1; Section 1: Sampling Techniques and Data Mt Ida
Criteria
Explanation
Sampling
techniques
Nature and quality of sampling (eg cut
channels, random chips, or specific
specialised industry standard measurement
tools appropriate to the minerals under
investigation, such as down hole gamma
sondes, or handheld XRF instruments, etc).
These examples should not be taken as
limiting the broad meaning of sampling.
Include reference to measures taken to
ensure sample representivity and the
appropriate calibration of any measurement
tools or systems used. Aspects of the
determination of mineralisation that are
Material to the Public Report. In cases where
‘industry standard’ work has been done this
would be relatively simple (eg ‘reverse
circulation drilling was used to obtain 1 m
samples from which 3 kg was pulverised to
produce a 30 g charge for fire assay’). In
other cases more explanation may be
required, such as where there is coarse gold
that has inherent sampling problems. Unusual
commodities or mineralisation types (eg
submarine nodules) may warrant disclosure
of detailed information
Drilling techniques
Drill type (eg core, reverse circulation, openhole hammer, rotary air blast, auger, Bangka,
sonic, etc) and details (eg core diameter,
triple or standard tube, depth of diamond tails,
face-sampling bit or other type, whether core
is oriented and if so, by what method, etc).
Commentary
•
•
•
•
•
•
These methods of sampling are considered to be
appropriate for this style of exploration
•
RC Drilling has been carried out by Orlando Drilling and
Frontline Drilling, RC drilling utilised an Explorac 220RC
rig with a 143 mm face sampling hammer bit, DD drilling
was completed by a truck mounted Sandvik DE820 and a
KWL 1500 and is HQ2 and NQ2 diameter. AC drilling was
carried out by Gyro Drilling and was competed to blade
refusal
Diamond tails average 200m depth
Historic drilling has been completed by various
companies including Kennedy Drilling, Wallis Drilling,
Ausdrill and unnamed contractors
Historic DD drilling was NQ sized core
It is assumed industry standard drilling methods and
equipment were utilised for all historic drilling
•
•
•
•
Drill sample
recovery
Method of recording and assessing core and
chip sample recoveries and results assessed.
Measures taken to maximise sample recovery
and ensure representative nature of the
samples. Whether a relationship exists
between sample recovery and grade and
whether sample bias may have occurred due
to preferential loss/gain of fine/coarse
material.
Sampling activities carried out by Delta Lithium at the Mt
Ida Project have included reverse circulation (RC), air
core (AC) and diamond (DD) drilling, and rock chip
sampling. Core sampling of one historic drillhole has also
been carried out, with assaying, petrological and XRD
analysis completed
RC samples were collected from a static cone splitter
mounted directly below the cyclone on the rig, AC
samples were collected using a spear from piles on the
ground into 2m composites or 1m bottom of hole
samples, DD sampling was carried out to
lithological/alteration domain with lengths between 0.31.1m
Limited historical data has been supplied, historic
sampling referenced has been carried out by Hammill
Resources, International Goldfields, La Mancha
Resources, Eastern Goldfields and Ora Banda Mining,
and has included rock chip sampling, and RC, DD and
rotary air blast (RAB) drilling
Sampling of historic RC has been carried out via riffle split
for 1m sampling, and scoop or spear sampling for 4m
composites, historic RAB drilling was sampled via spear
into 4m composites
Historic core has been cut and sampled to geological
intervals
•
•
•
Sample condition is recorded for every RC and AC drill
metre including noting the presence of water or minimal
sample return, inspections of rigs were carried out daily
Recovery on diamond core is recorded by measuring the
core metre by metre
Limited sample recovery and condition information has
been supplied or found for historic drilling
ASX ANNOUNCEMENT
8 August 2023
Criteria
Explanation
Logging
Whether core and chip samples have been
geologically and geotechnically logged to a
level of detail to support appropriate Mineral
Resource estimation, mining studies and
metallurgical studies. Whether logging is
qualitative or quantitative in nature. Core (or
costean, channel, etc) photography. The total
length and percentage of the relevant
intersections logged.
Commentary
•
•
•
•
•
•
•
Sub-sampling
techniques and
sample preparation
If core, whether cut or sawn and whether
quarter, half or all core taken.
If non-core, whether riffled, tube sampled,
rotary split, etc and whether sampled wet or
dry. For all sample types, the nature, quality
and appropriateness of the sample
preparation technique.
Quality control procedures adopted for all
sub-sampling stages to maximise
representivity of samples.
Measures taken to ensure that the sampling
is representative of the in situ material
collected, including for instance results for
field duplicate/second-half sampling. Whether
sample sizes are appropriate to the grain size
of the material being sampled.
•
•
•
•
•
•
•
•
•
•
•
Quantitative and qualitative geological logging of
drillholes adheres to company policy and includes
lithology, mineralogy, alteration, veining and weathering
Diamond core logging records lithology, mineralogy,
alteration, weathering, veining, RQD, SG and structural
data
All AC, RC chip trays and drill core are photographed in
full
A complete quantitative and qualitative logging suite was
supplied for historic drilling including lithology, alteration,
mineralogy, veining and weathering
It is unknown if all historic core was oriented, limited
geotechnical logging has been supplied
No historic core or chip photography has been supplied
Logging is of a level suitable to support Mineral resource
estimates and subsequent mining studies
DD sampling is undertaken by lithological/alteration
domain to a maximum of 1.1m and a minimum of 0.3m.
Core is cut in half with one half sent to the lab and one
half retained in the core tray
Occasional wet RC samples were encountered, extra
cleaning of the splitter was carried out afterward
RC, DD and AC chip samples have been analysed for Li
suite elements via ICPMS, and for Au by 50g fire assay
by ALS, Nagrom, NAL and SGS
Samples analysed by ALS, Nagrom, NAL and SGS were
dried, crushed and pulverised to 80% passing 75 microns
before undergoing a selected peroxide fusion digest or 4
acid digest with ICPMS finish or fire assay with ICPMS
finish
Historic core sampled by Delta Lithium was collected for
ICPMS analysis via selection from NQ half and quarter
core, and submitted to Nagrom
Semi-Quantitative XRD analysis was carried out by
Microanalysis Australia using a representative subsample that was lightly ground such that 90% was
passing 20 µm to eliminate preferred orientation
RC and AC duplicate field samples were carried out at a
rate of 1:20 and were sampled directly from the splitter on
the rig. These were submitted for the same assay
process as the primary samples and the laboratory are
unaware of such submissions
Historic chip sampling methods include single metre riffle
split and 4m composites that were either scoop or spear
sampled, while historic core was cut onsite and half core
sampled
Historic samples were analysed at LLAS, Genalysis and
unspecified laboratories
Historic Au analysis techniques generally included
crushing, splitting if required, and pulverisation, with aqua
regia or fire assay with AAS finish used to determine
concentration
Historic multielement analysis was carried with mixed
acid digest and ICP-MS determination
ASX ANNOUNCEMENT
8 August 2023
Criteria
Explanation
Quality of assay
data and laboratory
tests
The nature, quality and appropriateness of
the assaying and laboratory procedures used
and whether the technique is considered
partial or total. Nature of quality control
procedures adopted (eg standards, blanks,
duplicates, external laboratory checks) and
whether acceptable levels of accuracy (ie lack
of bias) and precision have been established.
For geophysical tools, spectrometers,
handheld XRF instruments, etc, the
parameters used in determining the analysis
including instrument make and model,
reading times, calibrations factors applied and
their derivation, etc.
Commentary
•
•
•
•
•
•
•
•
Verification of
sampling and
assaying
The verification of significant intersections by
either independent or alternative company
personnel. The use of twinned holes.
Documentation of primary data, data entry
procedures, data verification, data storage
(physical and electronic) protocols. Discuss
any adjustment to assay data
•
•
•
•
•
Location of data
points
Accuracy and quality of surveys used to
locate drill holes (collar and down-hole
surveys), trenches, mine workings and other
locations used in Mineral Resource
estimation. Specification of the grid system
used. Quality and adequacy of topographic
control
•
•
•
•
•
•
Data spacing and
distribution
Data spacing for reporting of Exploration
Results. Whether the data spacing and
distribution is sufficient to establish the
degree of geological and grade continuity
appropriate for the Mineral Resource and Ore
Reserve estimation procedure(s) and
classifications applied. Whether sample
compositing has been applied.
•
•
•
Samples have been analysed by external laboratories
utilising industry standard methods
The assay methods utilised by ALS, Nagrom, NAL and
SGS for RC chip, AC, rock chip and core sampling allow
for total dissolution of the sample where required
Standards and blanks are inserted at a rate of 1 in 20 in
RC, AC and DD sampling, All QAQC analyses were
within tolerance
No QAQC samples were submitted with rock chip
analysis
No standards were used by Delta Lithium in the historic
core ICP analysis or XRD quantification process. Internal
duplicate and repeat analyses were carried out as part of
the assay process by Nagrom, as well as internal
standard analysis
A standard mica phase was used for the XRD analysis. It
is possible that a lithium bearing mica such as lepidolite is
present. A subsequent analysis technique would be
required for confirmation
All historic samples are assumed to have been prepared
and assayed by industry standard techniques and
methods
Limited historic QAQC data has been supplied, industry
standard best practice is assumed
Significant intercepts have been reviewed by senior
personnel
No specific twinned holes have been completed, but
drilling has verified historic drilling intervals
Primary data is collected via excel templates and thirdparty logging software with inbuilt validation functions, the
data is forwarded to the Database administrator for entry
into a secure SQL database. Historic data was supplied in
various formats and has been validated as much as
practicable
No adjustments to assay data have been made other
than conversion from Li to Li2O and Ta to Ta2O5
Data entry, verification and storage protocols remain
unknown for historic operators
MGA94 zone 51 grid coordinate system is used
Current drilling collars have been pegged using a
handheld GPS unit, all collars will be surveyed upon
program completion by an independent third party
Downhole surveys are completed by the drilling
contractors using a true north seeking gyro instrument,
AC drillholes did not have downhole surveys carried out
Topography has been surveyed by recent operators.
Collar elevations are consistent with surrounding holes
and the natural surface elevation
Historic collars are recorded as being picked up by
DGPS, GPS or unknown methods and utilised the
MGA94 zone 51 coordinate system
Historic downhole surveys were completed by north
seeking gyro, Eastman single shot and multi shot
downhole camera
Drill hole spacing is variable throughout the program area
Spacing is considered appropriate for this style of
exploration
Sample compositing has not been applied
ASX ANNOUNCEMENT
8 August 2023
Criteria
Explanation
Orientation of data
in relation to
geological structure
Whether the orientation of sampling achieves
unbiased sampling of possible structures and
the extent to which this is known, considering
the deposit type. If the relationship between
the drilling orientation and the orientation of
key mineralised structures is considered to
have introduced a sampling bias, this should
be assessed and reported if material
•
Drill holes are orientated perpendicular to the regional
trend of the mineralisation previously drilled at the project;
drill hole orientation is not considered to have introduced
any bias to sampling techniques utilised
Sample security
The measures taken to ensure sample
security
•
•
Samples are prepared onsite under supervision of Red
Dirt Metals staff and transported by a third party directly
to the laboratory
Historic sample security measures are unknown
•
None carried out
Audits or reviews
The results of any audits or reviews of
sampling techniques and data.
Commentary
JORC Table 2; Section 2: Reporting of Exploration Results, Mt Ida
Criteria
Mineral tenement
and land tenure
status
Exploration done
by other parties
Commentary
Type, reference name/number, location and
ownership including agreements or material
issues with third parties such as joint ventures,
partnerships, overriding royalties, native title
interests, historical sites, wilderness or
national park and environmental settings. The
security of the tenure held at the time of
reporting along with any known impediments
to obtaining a licence to operate in the area
Acknowledgment and appraisal of exploration
by other parties.
•
•
•
•
•
Geology
Deposit type, geological setting and style of
mineralisation.
•
•
•
Drill hole
Information
A summary of all information material to the
understanding of the exploration results
including a tabulation of the following
information for all Material drill holes: easting
and northing of the drill hole collar elevation or
RL (Reduced Level – elevation above sea
level in metres) of the drill hole collar dip and
azimuth of the hole down hole length and
interception depth hole length. If the exclusion
of this information is justified on the basis that
the information is not Material and this
exclusion does not detract from the
understanding of the report, the Competent
Person should clearly explain why this is the
case.
•
Drilling and sampling activities have been carried on
M29/2, M29/165 and E29/640
The tenements are in good standing
There are no heritage issues
The area has a long history of gold and base metals
exploration and mining, with gold being discovered in the
district in the 1890s. Numerous generations of exploration
have been completed including activities such as drilling,
geophysics and geochemical sampling
Targeted Li assaying was first carried out in the early
2000s by La Mancha Resources and more recently,
lithium assays were completed by Ora Banda Mining
The Mt Ida project is located within the Eastern Goldfields
region of Western Australia within the Mt Ida/Ularring
greenstone belt
Locally the Kurrajong Antiform dominates the regional
structure at Mount Ida, a south-southeast trending, tight
isoclinal fold that plunges at a low angle to the south. The
Antiform is comprised of a layered greenstone sequence
of mafic and ultramafic rocks
Late stage granitoids and pegmatites intrude the
sequence
A list of the drill hole coordinates, orientations and metrics
are provided as an appended table
ASX ANNOUNCEMENT
8 August 2023
Criteria
Commentary
Data aggregation
methods
In reporting Exploration Results, weighting
averaging techniques, maximum and/or
minimum grade truncations (eg cutting of high
grades) and cut-off grades are usually Material
and should be stated. Where aggregate
intercepts incorporate short lengths of high
grade results and longer lengths of low grade
results, the procedure used for such
aggregation should be stated and some typical
examples of such aggregations should be
shown in detail. The assumptions used for any
reporting of metal equivalent values should be
clearly stated.
•
•
No metal equivalents are used
Significant intercepts are calculated with a cut-off grade of
0.3% Li2O
Relationship
between
mineralisation
widths and
intercept lengths
These relationships are particularly important
in the reporting of Exploration Results. If the
geometry of the mineralisation with respect to
the drill hole angle is known, its nature should
be reported. If it is not known and only the
down hole lengths are reported, there should
be a clear statement to this effect (eg ‘down
hole length, true width not known’).
•
The geometry of the mineralisation is roughly
perpendicular to the drilling.
Diagrams
Appropriate maps and sections (with scales)
and tabulations of intercepts should be
included for any significant discovery being
reported These should include, but not be
limited to a plan view of drill hole collar
locations and appropriate sectional views.
•
Figures are included in the announcement.
Balanced reporting
Where comprehensive reporting of all
Exploration Results is not practicable,
representative reporting of both low and high
grades and/or widths should be practiced to
avoid misleading reporting of Exploration
Results.
•
All drill collars, and significant intercepts have been
reported in the appendix
Other substantive
exploration data
Other exploration data, if meaningful and
material, should be reported including (but not
limited to): geological observations;
geophysical survey results; geochemical
survey results; bulk samples – size and
method of treatment; metallurgical test results;
bulk density, groundwater, geotechnical and
rock characteristics; potential deleterious or
contaminating substances.
•
None completed at this time
Further work
The nature and scale of planned further work
(eg tests for lateral extensions or depth
extensions or large-scale step-out drilling).
Diagrams clearly highlighting the areas of
possible extensions, including the main
geological interpretations and future drilling
areas, provided this information is not
commercially sensitive.
•
Drilling is continuing at Mt Ida with a 60,000m program
consisting of a mix of RC diamond and AC drilling
underway