Delta Lithium Limited (ASX: DLI) (“Delta” or the “Company”) is pleased to provide the outcomes of the Scoping
Study for the Mt Ida Lithium Project ("Scoping Study" or "the Study"). This Scoping Study is based upon a JORC
compliant Mineral Resource Estimate announced by the Company on 13 November 20251. This announcement
contains a concise overview of the Study outcomes followed by a technical summary.
Highlights:
• Mt Ida Lithium Mineral Resource Estimate ("MRE")2
:
14.8 Mt @ 1.21% Li2O, 170 ppm Ta2O5 and 0.42% Rb2O
• Assumes construction of a 1Mtpa ‘Whole Ore Flotation’ (WOF) lithium concentrator onsite at Mt Ida
with recovery to three products:
Spodumene Concentrate (SC5.5%)
Lepidolite Concentrate (LC3.0% Li2O, 1.8% Rb2O)
Tantalum Concentrate (Ta2O5 5%)
• The Scoping Study is supported by 73% Measured & Indicated Resources, with 83% Indicated
material during the initial 5 years.
• Potential for further upfront capital cost reduction and operational synergies with Ballard Mining
Limited (ASX:BM1) under the existing Mineral Rights Agreement.
• After initial Open Pit Mining at Sister Sam and Timoni the operation transitions to underground
capitalising on three separate high-grade, continuous orebodies that remain open at depth – Sister
Sam, Timoni and Sparrow.
• Process flowsheet is optimised for spodumene and lepidolite with an overall lithium recovery of
approximately 73% and a front-end tantalum recovery of 55%.
• Lepidolite concentrate contains rubidium, with a recovery of approximately 60% which improves the
economics and robustness of the Mt Ida Lithium Project that hosts one of the largest and highest-
grade publicly released rubidium oxide (Rb2O) MRE1
worldwide.
• Mt Ida is fully permitted for both open pit and underground mining.
Cautionary Statement
The Scoping Study referred to in this announcement has been undertaken to evaluate the opportunity available
to Delta to mine the lithium, tantalum and rubidium resource at its 100% owned Mt Ida Project. It is a preliminary
technical and economic study of the potential viability of the Mt Ida Project and has been prepared to an accuracy
of +/- 40%. The Study is based on low level technical and economic assessments that are not sufficient to support
the estimation of Ore Reserves.
2
Refer to the Company's ASX announcement titled “Mt Ida Lithium and Rubidium MRE” dated 13 November 2025.
2
ASX ANNOUNCEMENT
17 November 2026
While each of the modifying factors contained in the Australasian Code for Reporting of Exploration Results,
Mineral Resources and Ore Reserves ("JORC Code") were considered and applied, there is no certainty of
eventual conversion to Ore Reserves or that the production target itself will be realised. The stated production
target is based on the Company’s current expectations of future results or events and should not be solely relied
upon by investors when making investment decisions. Further exploration and evaluation work and appropriate
studies are required before Delta will be able to estimate any Ore Reserves or to provide any assurance of an
economic development case.
The production target and forecast financial information derived from the production target generated by the
Scoping Study is based upon Measured, Indicated and Inferred Mineral Resource category material. An Inferred
Mineral Resource has a lower level of confidence than a Measured and Indicated Mineral Resource and there is
no certainty that further exploration work will result in the conversion of the Inferred mineralisation into an
Indicated or Measured Mineral Resource or that the production target itself will be realised.
This announcement and the Scoping Study have been prepared in compliance with the JORC Code and the
ASX Listing Rules and with reference to ASX guidance on reporting scoping studies and ASIC Regulatory Guide
170. All material assumptions on which the forecast financial information is based have been made on
reasonable grounds and is contained within this announcement. The Company believes that it has a reasonable
basis for providing the forward-looking statements and forecast financial information. These include assumptions
about the availability of funding. While Delta considers all the material assumptions to be based on reasonable
grounds, there is no certainty that they will prove to be correct or that the range of outcomes indicated by the
Scoping Study will be achieved.
To achieve the range of outcomes indicated in the Scoping Study, further funding will likely be required and will
be determined by the strategic approach taken to progress the operation. Investors should note that there is no
certainty that Delta will be able to raise that amount of funding when needed. It is also likely that such funding
may only be available on terms that may be dilutive to or otherwise affect the value of Delta’s existing shares. It
is also possible that Delta could pursue other ‘value realisation’ strategies such as a sale, partial sale or joint
venture of the project. If it does, this could materially reduce Delta’s proportionate ownership of the Mt Ida Project.
Given the uncertainties involved, investors should not make any investment decisions based solely on the results
of the Scoping Study.
Commenting on the Mt Ida Scoping Study, Managing Director, James Croser said;
“The Scoping Study demonstrates that Mt Ida has real potential to be a highly profitable and long-life lithium
mine, with valuable tantalum and rubidium co-located within Mt Ida’s lithium orebodies, and only modest additions
to the WOF process flowsheet required to bring them to concentrate. The Delta Board is pleased with these initial
outcomes and continues to support the ongoing work programs at Mt Ida.
“Several value-adding activities will follow, including resource definition drilling, continued optimisation of the
process flowsheet to reduce capital and operating costs and building upon work earlier this year on downstream
recovery of rubidium and lithium carbonate from the lepidolite concentrate, with a firm view to maximising project
potential for shareholders.
Now that the scope of a potential lithium mine at Mt Ida has been outlined, Delta is well positioned to engage
positively with industry partners on shared outcomes.”
3
ASX ANNOUNCEMENT
17 November 2026
Executive Summary
Delta’s 100% owned Mt Ida Lithium Project is a well-advanced lithium development project located 100km
northwest of Menzies in the Eastern Goldfields Province of Western Australia.
Mt Ida lithium resource drilling commenced in 2021 and following several MRE updates for both lithium and gold,
the Company demerged the gold assets into Ballard Mining Limited (ASX: BM1) ("Ballard") and listed Ballard on
the ASX in July 2025.
The Mt Ida Lithium Scoping Study has been completed following a comprehensive review of the Mt Ida lithium
resources. The review covered the mining of three main lithium bearing pegmatites (Sister Sam, Timoni and
Sparrow), mine design, mine plan optimisation and schedule costing, WOF processing plant testwork,
optimisation and cost estimates, and various other project workflow studies, undertaken both internally and by
independent consultants.
The Study estimates a production target of approximately 8.5Mt at an average grade of 1.09% Li2O over a period
of 11 years across the Sister Sam, Timoni and Sparrow pegamites. There is a low level of geological confidence
associated with Inferred Mineral Resources and there is no certainty that further exploration work will result in
the determination of Indicated Mineral Resources or that the production target itself will be realised.
At the Mt Ida Lithium Project the Company plans to develop, and the Study assumes construction of, a 1 Mtpa
"Whole Ore Flotation" lithium concentrator onsite with recovery to three products containing lithium, rubidium
and tantalum of approximately 65kt per annume of spodumene concentrate (SC 5.5%), 110kt per annum of
lepidolite concentrate (LC 3.0% Li2O, 1.8% Rb2O) and 1.7kt per annum of tantalum concentrate (Ta2O5 5%).
The initial Sister Sam open pit is scheduled to deliver first production tonnes within 1 month of commencement
of mining. The Study mine plan is based on the commncement of open pits then transitioning to underground
mining. The underground mining capitalises on three different high-grade, steeply dipping and continuous ore
bodies named Sister Sam, Timoni and Sparrow.
The test work for Mt Ida has identified a suitable process flowsheet that provides satisfactory recoveries. The
overall recovery of lithium is expected to be 73%. Spodumene concentrate contirbutes 38% of lithium recovery
and lepidolite concentrate contributes 35% of lithium recovery. The recovery of tantalum is 55%. The lepidolite
concentrate contains rubidium, with a recovery of approximately 60%, which improves the economics and
robustness of the Mt Ida Project that hosts one of the largest and highest grade publicly released rubidium oxide
(Rb2O) MRE in the world.
Due to the proximity of the gold resources (gold rights are 100% owned by Ballard) to the Sister Sam and Timoni
lithium resources, the mining of the lithium resource can be easily coordinated along with the mining of the gold
resource, separately and with minimal interruption. The Scoping Study has prioritised production of lithium, has
not included potential synergies with Ballard's gold activities and does not detract from the long-term value of the
Lithium Project.
The Study demonstrates a robust operation with a potential mine life of approximately 11 years and future
optimisation potential. On this basis, the Company intends to proceed with further project development work.
Next Steps
Progress feasibility workflows towards the reporting of a maiden Ore Reserve.
Further optimisation of the process flow sheet to reduce operating and capital costs.
Investigate downstream processing options to maximise value from refined products.
4
ASX ANNOUNCEMENT
17 November 2026
More informed engagement regarding concentrate offtake options.
Key Outcomes of Scoping Study
The key outcomes of the Study are summarised in Table 1.
Table 1 - Study Summary
Key Metrics1
Units Amount
Life of mine ("LOM") including construction period Years 11
Annual production throughput Mtpa 1
Tonnes processed Mt 8.5
Average feed grade lithium % 1.09
Average feed grade rubidium % 0.38
Average feed grade tantalum ppm 181
Spodumene Concentrate (SC 5.5%) kt 640
Lepidolite Concentrate (LC 3.0%, 1.8% Rb2O) kt 1,080
Tantalum Concentrate (5.0% Ta2O5) kt 17
Total rubidium (Rb2O) contained in lepidolite concentrate kt 19
Financial Outcome (Post Tax)
Free Cash flow $M 1,415
Discount rate % 8
NPV $M 748
IRR % 33
Payback Period Years 4.3
Note:
1. There is a low level of geological confidence associated with Inferred Mineral Resources and there is no certainty
that further exploration work will result in the determination of Indicated Mineral Resources or that the production target
itself will be realised.
Given the uncertainties involved, investors should not make any investment decisions based solely on the results
of the Scoping Study.
Key Assumptions
The Study was based on the recovery, operating and capital cost assumptions in Table 2. Delta has concluded
that it has a reasonable basis for using these assumptions and providing the forecast financial information and
production targets included in this announcement.
Long-term lithium commodity price forecasts (from 2027 until 2042) were sourced from Benchmark Minerals
Intelligence (BMI), a leading independent, global research house that specialises in modelling structural changes
5
ASX ANNOUNCEMENT
17 November 2026
within the resources sector. BMI provided the detailed supply, demand and price models which were used as
the basis for Study price forecasts. Forecasts from BMI were sourced in September 2026.
Most Western governments classify rubidium as a critical mineral because of its strategic importance to advanced
technologies and the risk of supply chain disruptions. This has created a pricing premium for rubidium produced
from secure Western jurisdictions. For this assessment, demand is assumed to double by 2034 as the United
States and its allies seek to diversify critical mineral supply chains away from China. Despite broad recognition
of the need for increased critical mineral supply, there have been few significant discoveries in which rubidium
can be economically recovered as a co-product, raising concerns over the industry's ability to meet future
demand growth.
Given the Project's location within a Western jurisdiction and its forecast sustainability credentials, Delta
considers there to be potential for favourable future offtake pricing. This view is supported by the strategic nature
of rubidium and its potential application in oil and gas drilling fluids and defence-related technologies.
Accordingly, a rubidium co-product credit has been applied to lepidolite revenue based on the adopted pricing
assumptions and attributing a conservative 5% payability of the current rubidium carbonate price.
The physical, technical, marketing and cost assumptions for the Study are assessed to have a level of accuracy
of +/- 40%, in line with industry standard scoping level accuracy. All currencies are in Australian dollars (A$), and
all figures are in real 2026 terms, unless otherwise specified.
The Project is modelled unleveraged in 100% terms. Net Present Value ("NPV") and Internal Rate of Return
("IRR") are modelled from the assumed Final Investment Decision ("FID") date and exclude any residual value
beyond the modelled life and any exploration upside, hence, they are not considered representative of the full
value of the asset. The cost required to progress to FID has not been included in the financial model.
Table 2 – Study key metrics
Key Metrics Units Amount
Recovery
Global Lithium recovery % 73
Tantalum recovery % 55
Rubidium recovery to LC3.0 concentrate % 60
Operating Costs
Mining A$/t mined 116
Processing & Tailings A$/t processed 41
Site General & Administration A$/t processed 22
Transport A$/t concentrate 227
Unit operating costs * US$/t concentrate 756
Capital Costs
6
ASX ANNOUNCEMENT
17 November 2026
Key Metrics Units Amount
Mining $M 98
Processing Plant $M 228
Tailings Storage Facility $M 10
Paste Plant $M 23
Non-Process Infrastructure $M 60
Contingency $M 64
Pre-Production Capital $M 483
*Unit operating cost (excluding royalties) includes mining, processing and tailings, haulage, port charges, and site-based general and
administration costs. It is calculated on a total of spodumene and lepidolite concentrate produced.
This Scoping Study at Mt Ida utilises the substantial body of study work that has been conducted since Delta’s
acquisition of the Project in 2021. The Scoping Study and related assumptions were developed and supported
by independent consultants in conjunction with Delta’s Competent Person. The Mineral Resource underpinning
the Scoping Study has been prepared by Competent Persons in accordance with the requirements in the JORC
Code.
Further detailed information on the Scoping Study is provided at the end of this announcement.
ENDS
Release authorised by the Board of Delta Lithium Limited.
For further information, please contact:
Delta Lithium
James Croser, Managing Director
Peter Gilford, CFO & Company Secretary
+61 8 6109 0104
info@deltalithium.com.au
About Delta
Delta Lithium Ltd (ASX: DLI) is an exploration and development company focused on bringing high-quality, lithium-bearing
pegmatite deposits, located in Western Australia, into production. With current global JORC compliant Mineral Resources of
36.5Mt@1.0% Li2O, strong balance sheet and an experienced team driving the exploration and development workstreams, Delta
is diligently advancing its Projects.
The Mt Ida Project has coincident gold and lithium orebodies and holds a critical advantage over other developers with existing
Mining Leases and an approved Mining Proposal. Delta is pursuing a development pathway to unlock maximum value for
shareholders. Delta spun out its gold assets into Ballard on 14th July 2025 and retains a 30% equity stake in that company (post
capital raise by Ballard 19 October 2026).
Delta also holds the highly prospective Yinnetharra Lithium Project, with exciting lithium discoveries at the Malinda and Jamesons
prospects. The Company is currently conducting exploration activities at Yinnetharra with fieldwork continuing in 2026 across its
large tenure package, testing additional targets and aiming to build on the current JORC Mineral Resource.
For further information about Delta and its Projects, visit www.deltalithium.com.au
7
ASX ANNOUNCEMENT
17 November 2026
Competent Person's Statement
The information in this announcement that relates to geology and exploration is based on information compiled and reviewed by
Olaf Frederickson, who is a full-time employee of Delta and a Registered Member of the AIG. Olaf Frederickson has sufficient
experience that is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is
undertaking to qualify as a ‘Competent Person’ as defined in the JORC Code.
The information in this report which relates to Mineral Resources for the Sister Sam, Timoni and Sparrow deposits at the Mt Ida
Lithium Project was based upon the work undertaken by Susan Havlin who is an employee of Snowden Optiro. The information in
this announcement that relates to the estimation and reporting of Mineral Resources at the Mt Ida Project was first reported in
announcements of 13 November 2025. Ms Havlin is a Member and Chartered Professional of the Australasian Institute of Mining
and Metallurgy and have sufficient experience relevant to the style of mineralisation, the type of deposit under consideration and to
the activity undertaken to qualify as Competent Persons as defined in the JORC Code. Susan Havlin consents to the inclusion of
the information in this announcement in the form and context in which it appears.
Reporting of the Mineral Resources Estimate complies with the recommended guidelines of the JORC Code and is therefore
suitable for public reporting.
The information in this announcement that relates to the metallurgy and processing is based on, and fairly represents, information
and supporting documents compiled by Robert Simmons employed as Manager, Project Development by Sedgman and who is a
Member of the Australasian Institute of Mining and Metallurgy. Robert Simmons is a Competent Person as defined by the JORC
Code, having more than five years’ experience that is relevant to the style of mineralisation and type of deposit. Robert Simmons
consents to the inclusion in this announcement of the matters based on their information in the form and context in which it appears.
The information in this announcement that relates to the Scoping Study estimation and reporting is based on, and fairly represents,
information and supporting documents compiled by Tom Joseph employed as Study Manager/Principal Mining Engineer by Delta
and is a Member of the Australasian Institute of Mining and Metallurgy. Tom Joseph is a Competent Person as defined by the JORC
Code, having more than five years’ experience that is relevant to the style of mineralisation and type of deposit. Tom Joseph
consents to the inclusion in this announcement of the matters based on their information in the form and context in which it appears.
The announcement references the Mineral Resource which was first reported in the announcements of 13 November 2025.
The Scoping Study and Mineral Resources underpinning the production target have been prepared by competent persons in
accordance with the JORC Code.
Past exploration results and Mineral Resource Estimates reported in this announcement have been previously prepared and
disclosed by Delta in accordance with the JORC Code. The Company confirms that it is not aware of any new information or data
that materially affects the information included in these market announcements. The Company confirms that the form and content
in which the Competent Person's findings are presented here have not been materially modified from the original market
announcement, and all material assumptions and technical parameters underpinning Mineral Resource Estimates in the relevant
market announcement continue to apply and have not materially changed. Refer to www.deltalithium.com.au for details on past
exploration results and Mineral Resource Estimates.
Disclaimer
This announcement may include forward-looking and aspirational statements. These statements are based on Delta management’s
expectations and beliefs concerning future events as of the time of the release of this announcement. Forward-looking and
aspirational statements are necessarily subject to risks, uncertainties and other factors, some of which are outside the control of
Delta, which could cause actual results to differ materially from such statements. Delta makes no undertaking to subsequently
update or revise the forward looking or aspirational statements made in this release to reflect events or circumstances after the
date of this announcement, except as required by applicable laws and the ASX Listing Rules.
Refer to www.deltalithium.com.au for past ASX announcements.
8
ASX ANNOUNCEMENT
17 November 2026
Mt Ida Scoping Study Summary
1. Introduction
The Mt Ida Lithium Project ("the Project") is located approximately 100km northwest of Menzies, and
approximately 220km by road from Kalgoorlie in Western Australia’s Eastern Goldfields Region as shown in
Figure 1.
Road access to the Project is via the Menzies Northwest Road, followed by Mt Ida Road. The first 65km road
leaving Menzies to site is a sealed road, with the remainder of the road (35km) to site being an unsealed road of
good quality.
There is an existing airstrip that is currently in operation and supporting a neighbouring gold mine. Other
infrastructure required to construct, support and maintain the Mt Ida Lithium Project would be built as part of the
Project’s development.
Figure 1 - Location of Delta's Lithium Projects in Western Australia
9
ASX ANNOUNCEMENT
17 November 2026
2. History
No historic open pit or underground mining for lithium is known to have been carried out within the proposed
Sister Sam open pit mining footprint and underground mine area. Historic underground gold mining voids to
240m below surface are located further than 300m to the west and north of the proposed Sister Sam open pit,
but do not interfere with current mine designs. The drilling history at the Mt Ida Lithium deposit within the resource
area is summarised in Table 3.
Company Year Drill Type
No. of
drillholes
Metres
drilled
Hamill 2002 RC 5 1,204
IGL
2003 RC 3 640
2004 RC 1 258
La Mancha 2006 DD 1 298
OBM 2020 RCD 1 382
Delta
Lithium
2021
RC 36 6,483
RCD 2 796
2022
RC 7 1,514
RCD 62 23,100
DD 27 4,088
2023
RC 632 62,812
RCD 147 61,360
DD 100 17,904
2024
RC 111 16,599
RCD 26 11,978
2025
RC 99 12,941
RCD 10 2,208
DD 1 396
Total 1,271 224,961
Table 3 - Drilling history at the Mt Ida Lithium Project - within the resource area.
The previous ASX releases related to Mt Ida Lithium Project is listed below in the chronological order.
• “Yinnetharra and Mt Ida Exploration Update” on 30 September 2026.
• “Exploration Update & High-Grade Fluorite” on 11 May 2026.
• “Mt Ida Downstream Metallurgy Testwork Results” on 31 March 2026.
• “Lithium Exploration Update” on 23 January 2026.
• “Mt Ida Lithium and Rubidium MRE” on 13 November 2025.
• “Yinnetharra & Mt Ida Project Updates” on 02 October 2025.
• “Delta confirms Gold Spin-out” on 15 May 2025.
• “Mt Ida Exploration Update” on 14 November 2024.
• “Yinnetharra and Mt Ida Exploration Update” on 10 November 2023.
• “Approval of Mt Ida Mining Proposal” on 3 November 2023.
10
ASX ANNOUNCEMENT
17 November 2026
• “Mt Ida Lithium MRE Clarification” on 6 October 2023.
• “Mt Ida Drilling Update” on 08 August 2023.
• “More exciting Drill results from Yinnetharra and Mt Ida” on 14 June 2023.
• “Maiden Lithium Mineral Resource Estimate at Mt Ida” on 19 October 2022.
3. Study Parameters
For the purpose of the Scoping Study (“Study”), the Project is comprised of mining three main lithium bearing
pegmatites (Sister Sam, Timoni and Sparrow) for processing into three concentrate products, spodumene
concentrate (SC5.5), a lepidolite concentrate (LC3.0, and 1.8% Rb2O) and a tantalum concentrate (5.0% Ta2O5).
The central case assumed for the Study assumes export of products via Geraldton Port.
The Scoping Study is based on the following key parameters:
• JORC Compliant Mineral Resource Estimate as announced to the ASX on 13th
November 2025 titled “Mt
Ida Lithium and Rubidium MRE”.
• A combination of open pit and underground mining methods.
• Project implementation and operation by a Delta owners’ team.
• Open pit and underground mining being undertaken by specialist mining contractors.
• Processing plant onsite produces concentrate products, and the concentrates will be transported offsite
under concentrate purchase agreement with third party purchasers.
• The Study assumes trucking from site of concentrate products for export via the Geraldton Port.
• Tailings from ore processing at Mt Ida will be stored onsite in a tailings storage facility in the form of
Integrated Waste Landform (IWL) and utilised for underground stope backfill.
4. Tenure
All tenure is owned and managed by Mt Ida Lithium Pty Ltd, a wholly owned subsidiary of Delta Lithium Ltd
("Delta" or "the Company"). The tenure is in good standing with the Department of Mines, Petroleum and
Exploration with respect to statutory requirements of the Mining Act 1978 (WA) and all necessary access
agreements are in place.
The Mt Ida Project comprises of the following tenements:
• Eight granted Mining Leases (M29/02, M29/94, M29/165, M29/422, M29/429, M29/444, M29/458,
M29/459).
• Twelve granted Exploration Licenses (E29/640, E29/771, E29/944, E29/964, E29/1238, E29/1239,
E29/1240, E29/1288, E29/1292, E29/1293, E29/1262, E29/1309).
• Seven granted Prospecting Licenses (P29/2666, P29/2667, P29/2668, P29/2669, P29/2719, P29/2720,
P29/2721).
• Four granted Miscellaneous Licenses (L29/166, L29/171, L29/186, L29/229) and one granted
Miscellaneous License (for the purpose of groundwater search) (L29/177).
• L29/229 is jointly owned (50/50) by Mt Ida Lithium Pty Ltd and Mt Ida AU Pty Ltd (a wholly owned
subsidiary of Ballard Mining Limited (ASX: BM1) ("Ballard")) and is for the purpose of a bore field and
associated access. The bore field is within the Raeside Paleochannel, approximately 40km north of the
Project.
11
ASX ANNOUNCEMENT
17 November 2026
The Project area is 364 km2. The principal land uses of the tenement areas are mining and pastoral. Tenements
overlay the pastoral leases of Perinvale Station and Riverina Station. Zenith Australia Holdings owns both
pastoral stations. Other land uses include recreational prospecting, transport and tourism. Numerous small,
abandoned mine workings and open shafts are evident throughout the area. An access agreement is in place
with the Zenith Australia Holdings. There is also an access agreement in place with Aurenne Group for use of
the airstrip, located approximately 8 km south of the Mt Ida Project.
The Project area has been subject to previous exploration and mining operational activity.
No Native Title claim exists over the tenements. Heritage assessments have been undertaken with no heritage
sites identified and heritage clearance received.
The tenure is subject to a Gold Mineral Rights Agreement whereby Ballard has rights to gold and precious metals.
Delta maintains rights to all other resources contained within the tenure including but not limited to, lithium,
tantalum and rubidium.
5. Permitting and Approvals
The Project has received approvals to undertake the following mining activities:
• Mining Proposal and Mine Closure Plan approval for commencement of operations for open pit and
underground mining.
• Works approval for a mobile crushing and screening plant.
• Native Vegetation Clearing Permit approval to allow clearing of up to 338ha.
• 5C licence for 3.7GL for tenements M29/2 and M29/165, M29/444.
The mining approvals accommodate open pit mining, construction of an integrated waste landform,
establishment of topsoil stockpiles, construction and operation of a ROM pad, and mining support infrastructure
including an expansion to camp facilities, access roads, laydown, workshop, turkeys’ nest, groundwater
abstraction bores, interconnecting roads and explosives magazine. Approval workflows will continue to update
where necessary based off recommednations and regulatory requirements. Delta is unaware of other significant
factors or risks that may affect access, title, or the right or ability to work on the mining property.
6. Geology
The Mt Ida Lithium Project is in the northern-most part of the Ularring greenstone belt which represents the
western-most subdivision of the regionally extensive Noresman-Wiluna belt. The Ularring Greenstone Belt
comprises an extensive sequence of mafic and ultramafic rocks with interbedded (volcanogenic) sediments and
felsic to intermediate volcanics. The geology is structurally complex, including cross cutting and belt-parallel
regional shear zones, intrusive porphyries, Proterozoic dykes and basal ultramafic contacts. In the Mt Ida area,
the greenstone sequence is folded into a southerly plunging antiform - the Kurrajong Anticline. The later stage
Copperfield Granite at the core of the anticline is interpreted as a source for the observed lithium-caesium-
tantalum (LCT) pegmatites.
Sister Sam comprises three northwest, moderately dipping (-40°) pegmatites, which have been drilled over a
strike length of 1,000m and to a vertical depth of around 830m. The three pegm