Investor Presentation - Resources Rising Stars
Released
Released
Announcement PDF
Fast-tracking development
of our West Australian
lithium assets
Resources Rising Stars, Gold Coast
David Flanagan
Executive Chairman
16 – 17 May 2023
ASX: DLI
Disclaimer and Competent Persons Statement
Disclaimer
This presentation by its nature contains summarised information. See Delta Lithium's’ other periodic and continuous disclosure announcements lodged with the Australian Securities Exchange,
which are available at www.asx.com.au for more information.
Within this presentation there may be certain forward-looking statements, opinions and estimates. These are based on assumptions and contingencies which are subject to change without notice
and are not guarantees of future performance. Delta Lithium assumes no obligation to update such information. Recipients of this document are cautioned to not place undue reliance on such
forward-looking statements.
To the extent permitted by law, Delta Lithium and its officers, employees, related bodies corporate and agents disclaim all liability, direct, indirect or consequential for any loss or damage suffered by
a recipient or other persons arising out of, or in connection with, any use or reliance on this presentation or information.
This presentation may include aspirational targets. These targets are based on management’s expectations and beliefs concerning future events as of the time of the release of this presentation.
Targets are necessarily subject to risks, uncertainties and other factors, some of which are outside the control of Delta Lithium that could cause actual results to differ materially from such
statements. Delta Lithium makes no undertaking to subsequently update or revise the forward-looking statements made in this release to reflect events or circumstances after the date of this
presentation.
Competent Persons Statements
Exploration information in this Announcement is based upon work undertaken by Mr. Charles Hughes who is a Member of the Australasian Institute of Mining and Metallurgy (AUSIMM). Mr. Hughes
has sufficient experience that is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a ‘Competent Person’ as
defined in the 2012 Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’ (JORC Code). Mr. Hughes is an employee of Delta Lithium Limited
and consents to the inclusion in the report of the matters based on their information in the form and context in which it appears.
Mineral Resource Estimates reported in this announcement have been previously prepared and disclosed by Delta Lithium in accordance with JORC 2012 on 19 October 2022 to the ASX markets
platform. The Company confirms that it is not aware of any new information or data that materially affects the information included in this market announcement. The Company confirms that the
form and content in which the Competent Person's findings are presented here have not been materially modified from the original market announcement, and all material assumptions and technical
parameters underpinning Mineral Resource Estimates in the relevant market announcement continue to apply and have not materially changed. Refer to www.deltalithium.com.au for past ASX
announcements.
Authorised for release by Executive Chairman, David Flanagan.
Corporate Overview
Delta Lithium is focused on
rapidly advancing the Mt Ida
Lithium Project towards
production, whilst
conducting an aggressive
exploration programme at
the highly prospective
Yinnetharra Lithium Project.
Corporate Snapshot
Market Cap
Cash
$245m (at $0.55)
~$52m (as at 31 Mar)
Shares on Issue
Options
446.0m
47.9m
Performance Rights
Major Shareholders
30.2m
Top 20
(inc 12.1% held
by Warratah
Capital Advisors)
ABN: 67 107 244 039
ASX: DLI
deltalithium.com.au
46%
WA Lithium Projects
Mt Ida Lithium Project
- Growth
• First year of lithium exploration delivered a 12.7Mt resource, 6 new
priority targets
• Fantastic result from infill drilling at the Sister Sam pegmatite
highlights great scope for resource expansion;
• IDRD077W2: 49.5 metres at 1.45% Li2O from 387.5 metres
including1;
o 12.2 metres at 1.95% Li2O from 389.1 metres,
o 5.5 metres at 2.00% Li2O from 405.6 metres, and
o 5.7 metres at 1.90% Li2O from 418.3 metres.
•
Fantastic result from extensional drilling at IDRD229W1
intercepted substantial new mineralisation - 90.1 metres at 0.95%
Li2O outside existing resources from 650.8m at the BFB target.2
The intercept includes;
o 56.1metres at 1.1% from 674.0 metres;
o 7.7 metres at 1.57 from 658.5 metres; and
o 22.4 metres at 1.52% from 703.2 metres.
• Multiple regional Air-Core (“AC") lithium anomalies present priority
follow up targets as well as the Gap & Little Sister
• Drilling program well underway – 6 rigs, 200+ holes for a combined
60,000 metres
1.
2.
Refer to ASX announcement dated 25 January 2023
Refer to ASX announcement dated 24 April 2023.
Mt Ida Lithium Project
“Exceptional results outside existing resource”
Mt Ida Lithium Project
“Significant intercepts at
Sister Sam & Timoni deposits”
Delta and Mid West Ports Authority (MWPA)
are currently working to finalise a
cooperation
agreement
that
will
accommodate the potential export of both
DSO and concentrate products, which would
likely be from berth 4 pictured to the left.
Yinnetharra Lithium Project
- Overview
•
One of the most exciting Lithium exploration
projects in Australia
•
The Yinnetharra Lithium Project covers a very
large area of 575km2 within the Gascoyne region
of Western Australia
•
The Malinda Prospect located within the
Yinnetharra Lithium Project is the current focus of
exploration activities and hosts >50 mapped
pegmatites
•
Delta Lithium are rapidly advancing the project to
realise its true potential in alignment with the
Company’s ‘speed to market’ narrative
•
90,000 metres and over 400 drill holes underway
to target a globally significant project in 2023
•
Since acquisition in September 2022, Delta
Lithium has completed ~150 drill holes for more
than 32,000m at Yinnetharra and are ramping up
drilling to 20,000m per month
Yinnetharra
Lithium Project
-growing
footprint
Yinnetharra Lithium Project
- Malinda Prospect
• M47 and M36 pegmatites have been specifically targeted
due to previous results.
• Exciting early shallow and wide initial intercepts into M47
and M36 pegmatite at Yinnetharra1:
o YNEX004: 35.2m @ 1.00% Li2O from 5m
o YNEX003: 28.9m @ 1.11% Li2O from 121m
o YNEX005: 8.5m @ 1.12% Li2O from 4m
• Excellent intercepts from drilling so far into the M1 pegmatite
at Yinnetharra1;
o YNRD005: 55.6m @ 1.12% Li2O from 94m
o YNRD028: 17m @ 1.12% Li2O from 61m
o YRRD011: 20m @ 1.29% Li2O from 28m
o YNRD007: 14.9m @ 1.12% Li2O from 61.2m
o MARC011: 17m @ 1.13% Li2O from 82m
o YRRD009: 15m @ 1.28% Li2O from 99m
• Extensional drilling on-going at M1 pegmatite
• M1 is mineralised from surface with widths of greater than
50m has been intercepted over 650m of strike
• M1 is open in all directions
1. Refer to ASX announcement dated 27 February 2023, 3 April 2023 and 8 May 2023
Yinnetharra Lithium Project
- Malinda Prospect (M1 Long Section)
Yinnetharra Lithium Project
- Malinda Prospect
Yinnetharra Lithium Project
- Malinda Prospect
• Preliminary Metallurgical
testwork underway for
Yinnetharra
• Coarse spodumene drilled
at YNRD005 from the M1
pegmatite 124.74 –
133.85m 19.1m @ 1.80%
Li2O.
Refer to ASX announcement dated 20
January 2023 for further information.
Yinnetharra Lithium Project
- Jamesons Prospect
• 20km to the west of the Malinda Prospect.
• Discovered as part of first pass regional mapping
• more than 20 pegmatites mapped at the Jamesons
Prospect with only very limited sampling completed to date.
• Assays received of the rockchip sample confirmed a result
of 4.2% Li2O and the lithium mineral is spodumene.1
• Emphasises the potential of the project!
1. Refer to ASX announcement 14 April 2023.
Our Business Partners
Geographic and raw material market shares - 2016, 2022, 2030
Source: UBS and internal analysis
Appendices – Mineral Resources
Li2O
Resource Category
Cut-off
grade
(Li2O%)
Indicated
Inferred
Total
0.55
Ta2O5
Tonnes
(Mt)
Grade
(Li2O%)
Li2O
(Kt)
Grade
(Ta2O5 ppm)
3.3
1.4
45
246
9.3
1.1
102
193
12.7
1.2
148
207
Refer ASX release titled “Mt Ida Maiden Lithium Resource 12.7Mt at 1.2% Li20, 19 October 2022.
Board of Directors
David Flanagan
James Croser
Tim Manners
Nader El Sayed
Executive Chairman
Non-Executive Director
Non-Executive Director
Non-Executive Director
Key Management Personnel
Jeremy Sinclair
Daniel Taylor
Charles Hughes
Daniel Kendall
Chief Operating Officer
Chief Marketing Officer
Chief Geologist
Chief Financial Officer and Company Secretary
Share your feedback
Discover