Half Year Accounts
Released
Released
Announcement PDF
DELTA LITHIUM LIMITED
ACN 107 244 039
Interim Financial Report
for the Half-Year Ended
31 December 2024
DELTA LITHIUM LIMITED
Interim Financial Report 31 December 2024
Table of Contents
Corporate Directory .............................................................................................2
Director’s Report ................................................................................................3
Auditors’ Independence Declaration ............................................................................. 16
Condensed Consolidated Statement of Profit or Loss and Other Comprehensive Income ............................... 17
Condensed Consolidated Statement of Financial Position .......................................................... 18
Condensed Consolidated Statement of Changes in Equity .......................................................... 19
Condensed Consolidated Statement of Cash Flows ................................................................ 20
Directors’ Declaration ......................................................................................... 34
Independent Auditor’s Review Report ........................................................................... 35
1
DELTA LITHIUM LIMITED
Interim Financial Report 31 December 2024
Corporate Directory
Directors
Nader El Sayed (Non-Executive Chairman)
James Croser (Managing Director)
Tim Manners (Non-Executive Director)
Steve Kovac (Non-Executive Director)
Joshua Thurlow (Non-Executive Director)
Company Secretary
Peter Gilford
Registered Office and Principal Place of
Business
Level 2, 18 Richardson Street
West Perth WA 6005
Tel: +61 8 6109 0104
Auditors
KPMG
235 St George's Terrace
Perth WA 6000 Australia
Solicitors
Thomson Geer
Level 29, Central Park
152-158 St Georges Tce
Perth WA 6000
Share Registry
Computershare Investor Services Pty Ltd
Level 17, 221 St Georges Terrace
Perth WA 6000
Australian Telephone: 1300 850 505
International Telephone: +61 3 9415 4000
www.computershare.com.au
Securities Exchange Listing
Delta Lithium Limited shares are listed on the
Australian Securities Exchange (ASX)
ASX Code: DLI
Website
www.deltalithium.com.au
Email
Info@deltalithium.com.au
2
DELTA LITHIUM LIMITED
Interim Financial Report 31 December 2024
Director’s Report
The Directors hereby present their Interim Financial Report on Delta Lithium Limited (ASX: DLI) (the ‘Company’ or ‘Delta’)
and its subsidiaries for the half-year ended 31 December 2024.
DIRECTORS
Except as otherwise stated below, the following persons were Directors of Delta Lithium Limited during the whole of the halfyear and up to the date of this Report as follows:
Director
Nader El Sayed1
Chris Ellison
James Croser2
Tim Manners
Steve Kovac
Joshua Thurlow
Title
Non-Executive Chairman
Non-Executive Chairman
Managing Director
Non-Executive Director
Non-Executive Director
Non-Executive Director
Appointment Date
25 November 2024
12 September 2023
4 December 2020
1 March 2022
2 August 2023
12 September 2023
Resignation Date
25 November 2024
-
1Appointed 1 March 2021 as Non-Executive Director, transitioned to Non-Executive Chairman on 25 November 2024
2Appointed 13 September 2023 as Managing Director, after serving as Non-Executive Director from 4 December 2020.
COMPANY SECRETARY
Mr Peter Gilford has acted as the Company Secretary during the entire period.
Review of Operations
Delta continued to progress key developmental workstreams
throughout the second half of CY2024 at both the Mt Ida and
Yinnetharra Projects.
During the half the Company focused on exploration work on
expanding the existing gold resource at Mt Ida. Delta
commenced a four-stage gold exploration program in
November consisting of approximately 35-40,000m drill metres
including both RC and diamond drilling at the Baldock Deposit.
Concurrent to exploration, the Company continued to progress
studies on a Mt Ida gold standalone Processing Plant with
permitting applications for a Processing Plant and a Tailings
Storage Facility to be submitted in 2025.
Delta also appointed Bell Potter Securities to undertake a
Strategic Review which determined the most value-accretive
development pathway forward for the Mt Ida Project would be
for the Company to continue advancing the Project towards
genuine standalone scale.
At Yinnetharra, exploration was focused on the completion of
the resource definition program for Malinda and diamond drill
programs to collect representative bulk samples for
metallurgical testwork. Results have continued to demonstrate
strong lithium intercepts from the M1, M36 and M47
pegmatites, which form the bulk of the Mineral Resource
Estimate (MRE).
A metallurgical test work program to a Definitive Feasibility Study (DFS) level of detail was approved by the Delta Board in late
September to target the M1 pegmatite orebody, which hosts the majority of the Mineral Resource at Malinda. This test work,
including a 4-tonne pilot plant test on the M1 material, was ongoing throughout the December Quarter with results released to
the ASX subsequent to the end of the reporting period. The M1 metallurgical results indicated high grade spodumene
concentrates could be produced at a high recovery rate with very low impurities through a Whole-of-Ore Flotation processing
path.
The Delta team has progressed critical workstreams throughout the second half of 2024 through the rapid progression of drilling
and permitting at the Mt Ida Project and ongoing exploration success at the Malinda Prospect within the Yinnetharra Lithium
3
DELTA LITHIUM LIMITED
Interim Financial Report 31 December 2024
project. Importantly, Delta remains committed to the prudent management of capital. The sale of the Eureka Project to Javelin
Minerals for $1.5M in cash, $1.5M in scrip and up to $1.0M contingent consideration, successfully monetized a non-core asset
and maintained exposure for Delta shareholders through an ongoing equity position.
Corporate Strategy
Delta’s strategy is focused on growing confidence and reducing risk at both the Mt Ida and Yinnetharra Projects. The focus of
a four-stage gold exploration program at Mt Ida competitively positions the Company at a time when gold is reaching all-time
highs and Mt Ida has significant potential of further upside as geological confidence increases. The Company has also continued
to build on its existing knowledge of Yinnetharra with the primary focus of increasing the lithium resource confidence at
Malinda. In addition, the Company also successfully identified the emergence of contiguous tantalum at Malinda which is under
consideration for a secondary source of revenue requiring modest flowsheet additions.
Looking forward, the Company is focused on three main objectives:
•
•
•
Update the Yinnetharra Lithium MRE and undertake negotiations and approvals regarding Mining Lease approvals at
Malinda
Continue gold exploration at Mt Ida to grow the MRE in size and confidence, advance metallurgical and geotechnical
studies and progress with feasibility work for a standalone gold processing plant
Growth via exploration and a disciplined approach to acquisition opportunities
Yinnetharra Lithium Project
The Yinnetharra Lithium Project located in the Gascoyne Lithium Province of Western Australia and sits within a tenement
package covering an area of 1,769km2. A maiden MRE was released in December 2023 of 25.7Mt @ 1% Li2O. Farm-In Joint
Venture Agreements have expanded the prospective stratigraphy to over 80km in length.
The Company completed its drill campaign at Malinda with assays subsequently released to the ASX on 21 January 2025.
Metallurgical and geotechnical studies on the M1 are ongoing and are designed to support a Maiden Ore Reserve in conjunction
with the next Mineral Resource Estimate update at Malinda, which will incorporate recent drilling designed to upgrade the
Inferred component to an Indicated category.
4
DELTA LITHIUM LIMITED
Interim Financial Report 31 December 2024
Figure 1: Yinnetharra regional prospects
The combined Inferred and Indicated Mineral Resource Estimate were measured as:
25.7 Mt @ 1.0% Li2O (at a 0.5% Li2O cut off)
26% of the MRE in higher confidence Indicated category: 6.7Mt @ 1.0 Li2O% as shown in the table below.
Yinnetharra Lithium December 2023
Resource category
Cut-off
grade
(Li2O%)
Tonnes
(Mt)
-
Grade
(% Li2O)
-
Total Indicated
6.7
Total Inferred
19.0
Total Measured
Notes:
Ta2O5
Li2O
Grade
Li2O
(Kt)
-
(ppm Ta2O5)
1.0
65
51
1.0
181
67
Total
25.7
1.0
246
62
Tonnages and grades have been rounded to reflect the relative uncertainty of the estimate. Inconsistencies in
the totals are due to rounding.
Table 1: Yinnetharra JORC Resource
5
DELTA LITHIUM LIMITED
Interim Financial Report 31 December 2024
•
Highlights from resource definition at Malinda during the half year include:
o 25m @ 2.84% Li2O from 148m in YRRD050 at M36
o 124m @ 1.1% Li2O from 11m in YDPT005 at M1 (metallurgical hole – not true width)
o 46m @ 1.1% Li2O from 203m in YDGT002 at M1
o 78m @ 0.8% Li2O from 105m in YRRD668 at M47
including 22m @ 1.4% Li2O from 160m
o 22.6m @ 2.16% Li2O from 310m in YRRD126 at M36
o 32.4m @ 1.01% Li2O from 50m in YDPT012 at M47
o 32m @ 0.93% Li2O from 280m in YDRD066 at M1
o 15m @ 1.5% Li2O from 19m in YDRD716 at M69
o 22m @ 1.13% Li2O from 24m in YDRD717 at M69
•
Final assays from Jamesons first program show continuation of strong spodumene mineralisation at depth
o 10m @ 2.2% Li2O from 113m in JREX030A
HoleID
YDPT005
YDPT006
YDRD050
YRRD668
YDRD052
YRRD690
YDPT004
YDGT002
YRRD671
YDRD056
YDPT001
YDPT006
YRRD640
YRRD663A
YRRD577
YDPT002
JREX030A
YRRD618
YRRD690A
YDRD053
YRRD678A
YRRD679
YRRD588
YRRD660
YRRD634
YRRD633A
From m To m
Length m Li2O pct Ta2O5 ppm Fe2O3%
11.0
135.1
124.1
1.1
50.8
2.6
119
217
108
0.7
54.8
2.7
148
173
25
2.8
111.2
2.5
105
183
78
0.8
217.3
3.2
80.6
117.0
36.4
1.5
54.3
0.8
62
105
43
1.2
68.1
1.1
82.7
154.2
71.5
0.7
63.9
0.7
203.0
248.6
45.6
1.1
63.1
0.8
202.1
237.4
35.3
1.18
77
1.53
148.5
191.0
42.5
1.0
58.9
0.5
23.8
52.5
28.6
1.3
70.6
0.9
119
161
42
0.8
38.1
1.6
202
219
17
1.85
116
2.94
149
178
29
1.0
76.9
2.5
170
197
27
1.0
23.2
0.9
37.3
61.1
23.8
1.1
76.5
1.2
113
123
10.0
2.2
55.7
1.1
152.5
170.6
18.1
1.0
58.9
1.2
32
59
27
0.7
47.3
2.5
89
100
11
1.3
26.3
0.7
186
195
9.0
1.5
25.4
0.8
89.0
101.3
12.3
1.1
45.1
4.9
86
99
13
1.0
55.4
1.0
39
59
20
0.7
242.4
1.1
171
184
13
1.0
53.1
3.9
150
159
9
1.3
46.1
4.2
Yinnetharra Project Development
Environmental baseline studies have progressed at Yinnetharra including flora and fauna, materials characterisation, surface
and groundwater studies. These studies were ongoing throughout the December Quarter and Delta will provide an update on
the likely permitting route in the March Quarter of 2025 once collaboration with the relevant Government Agencies is
undertaken.
6
DELTA LITHIUM LIMITED
Interim Financial Report 31 December 2024
A metallurgical test work program to a DFS level of detail was approved by the Delta Board late in the September Quarter to
target the M1 pegmatite orebody, which hosts the majority of the Mineral Resource Estimate at Malinda. This test work,
including a 4-tonne pilot plant test on the M1, was ongoing throughout the December Quarter with results released to the ASX
on 21 January (refer ASX Announcement titled ‘Yinnetharra Metallurgy and Exploration Update’). A summary of the results is
shown in Table 2.
Figure 2: Operating the spodumene circuit
7
DELTA LITHIUM LIMITED
Interim Financial Report 31 December 2024
Grades
Units
Batch
Locked Cycle
Pilot Plant
Feed Grade
%Li2O
1.0
1.0
1.0
Concentrate Grade
%Li2O
6.0
5.5
5.7
Deslime Losses
%, Li2O
3.9
3.9
4.2
Mags Losses
%, Li2O
3.4
3.4
2.8
Mica Prefloat Losses
%, Li2O
6.4
9.9
6.1
Spodumene Float Losses
%, Li2O
4.6
6.5
17.7
Global Recovery
%, Li2O
81.8
76.4
69.2
Recovery Breakdown
Table 2: High level testwork results
The testwork program was used to develop the required processing flowsheet for the M1 ore body as shown in Figure 6.
Geotechnical studies on the M1 Open Pit to a DFS level of detail, and M1 Underground to a PFS level of detail has also been
ongoing throughout the December Quarter and is expected to be completed in the March Quarter of 2025.
The metallurgy and geotechnical studies on the M1 are designed to support a Maiden Reserve in conjunction with the next
Resource update at Malinda which will incorporate recent drilling designed to upgrade the Inferred component to an Indicated
category.
8
DELTA LITHIUM LIMITED
Interim Financial Report 31 December 2024
Figure 3: Malinda processing flowsheet
Approvals and Project Development
Subsequent to the end of the reporting period, heritage surveys recorded several Aboriginal Sites in prospective areas which
are expected to require detailed follow up prior to exploration drilling in the vicinity.
The Mining Lease application was submitted for the Malinda Mining Area and Native Title negotiations have commenced.
Environmental permitting will continue to advance, and Delta will provide an update on the likely permitting route once
meetings with Regulators have been held in the March Quarter.
Mt Ida Project
The Mt Ida Project is located approximately 100km northwest of Menzies, and approximately 225km by road from Kalgoorlie in
Western Australia’s prolific Eastern Goldfields mining region. The Project area resides on granted mining leases and is approved
for open pit and underground mining at Baldock, which hosts the majority of the high-grade gold Mineral Resource at Mt Ida.
9
DELTA LITHIUM LIMITED
Interim Financial Report 31 December 2024
Mt Ida Resource Growth
Delta advanced multiple key workstreams throughout the half-year which included the commencement of a $5-6M exploration
drilling program, with a target to grow the current gold resource beyond 1 million ounces for genuine standalone scale. This is
the first program that is primarily targeting the gold resources since Delta’s acquisition of the project in 2021. The majority of
previous drilling undertaken at Mt Ida has been focused on LCT mineralisation, however gold lodes at Baldock were variously
intercepted by this drilling due to their spatial relationship with the pegmatites.
The Company is undertaking a four-stage drill program consisting of approximately 35-40,000 drill metres including both RC
and diamond drilling at Baldock, then regional RC drilling across the wider Mt Ida tenure including Kestrel and Golden Vale
(See Figure 4). Stages 1 and 2 are complete, and Stages 3 and 4 are underway. Stage 2 has targeted further extending the
existing JORC resources at Baldock and Kestrel while Stage 3 is focusing on deeper high-grade chutes at Baldock via diamond
drilling from RC pre-collars.
One reverse circulation (RC) rig and one diamond drill (DD) rig were operating at the project carrying out the resource
extensional and exploration programs.
The first batch of assays from Stage 1 were received in January. Drilling to date has demonstrated continuity and confirmed
the extension of mineralisation beyond the current MRE, both along strike and at depth. In particular, recent results following
up on historical drilling have confirmed shallow, high-grade mineralisation to the South of Baldock.
Subsequent to the end of the reporting period, Delta received further assays from Stage 2 and 3 drilling. The highlights of
which are as follows;
•
•
•
•
•
•
3m @ 18.2 g/t Au from 283m in IDRD364
6m @ 13.4 g/t Au from 91m in IDRD389
o Including 3m @ 25.1g/t Au from 92m
1.2m @ 10.1g/t Au from 410.5m in IDRD333
7m @ 2.9 g/t Au from 17m in IDRD368
2m @ 4.9 g/t Au from 38m in IDRD362A
1m @ 7.1 g/t Au from 128m in IDRD39
The RC rig has commenced Stage 4 to complete first pass drilling programs across the highest priority regional prospects, all
of which are within a 12km radius of the Baldock hub. These initial programs will aim to delineate further resources from five
regional prospects across the Mt Ida tenure with many other prospects to be tested in future. Current planned programs are
anticipated to be completed by early CY25 which will be followed by an updated gold Mineral Resource Estimate for the Mt Ida
Project.
10
DELTA LITHIUM LIMITED
Interim Financial Report 31 December 2024
Figure 4: Plan showing the potential Baldock mining hub, surrounding JORC Resources
and planned regional drilling
Mt Ida Project Development
Delta continued to progress a standalone processing option such that Delta’s own development plans can be assessed against
the outcome of the Strategic Review. Contemporaneously with the Resource Growth program as outlined above, Delta is
preparing the necessary applications for a Processing Plant and Tails Storage Facility at Mt Ida. Delta is awaiting the Tails
Characterisation test work results which are expected early in the March Quarter which will allow the permitting applications
(Works Approval and update to Mining Proposal and Mine Closure Plan) to be submitted to the relevant state authorities being
DWER and DEMIRS.
11
DELTA LITHIUM LIMITED
Interim Financial Report 31 December 2024
Mt Ida Strategic Review
In September 2024 Delta appointed Bell Potter Securities as financial advisor to conduct a formal strategic review of the gold
opportunity at Mt Ida and determine how best to monetise the asset. The decision was in line with Delta’s stated strategy to
maintain a principal focus on its lithium assets contained at Mt Ida and the Yinnetharra Project in the Gascoyne region.
The Strategic Review indicated that the most value accretive development pathway is for Delta to continue advancing the
Project towards genuine standalone scale.
Subsequent to the end of the reporting period, the Company placed the Mt Ida gold assets into Mt Ida AU Pty Ltd, a whollyowned subsidiary of Delta Lithium which was incorporated for this express purpose.
Pending receipt of all results from the ongoing drill program, Delta will continue gold exploration at Mt Ida to grow the MRE in
size and confidence, advance metallurgical and geotechnical studies and progress with feasibility work for a standalone
processing plant. While this development work continues, the Company maintains all optionality with regard to the gold assets
at Mt Ida.
Primary modifying factors (Geotechnical, Metallurgy) are being advanced to DFS level while GR Engineering have been
contracted to carry out processing plant design and cost studies. These studies are running in conjunction with the submission
of the Works Approval, which is planned within the coming months.
Table 3: Mineral Resource Estimate for Mt Ida Gold Project.
Mt Ida Gold Mineral Resource Estimate
Indicated
Cut off
Deposit
Inferred
Total
Tonnes
Grade
Ounces
Tonnes
Grade
Ounces
Tonnes
Grade
Ounces
(000s)
g/t Au
(000s)
(000s)
g/t Au
(000s)
(000s)
g/t Au
(000s)
Baldock
Open cut Au 0.5
Kestrel
g/t
Golden Vale
1,345
4.9
209
1,512
3.2
158
2,857
4.0
367
-
-
-
570
1.6
29
570
1.6
29
-
-
-
496
1.7
27
496
1.7
27
0.0 g/t Au Cut off Mt Ida Tailings
-
-
-
500
0.5
8
500
0.5
8
Baldock
Underground 1.5
Kestrel
g/t Au
Golden Vale
180
5.8
33
1,780
4.8
274
1,960
4.9
307
-
-
-
220
1.9
14
220
1.9
14
-
-
-
-
-
-
-
-
-
500
0.5
8
500
0.5
8
Mt Ida Tailings
All
Baldock
1,525
4.9
242
3,292
4.1
432
4,817
4.4
674
Kestrel
-
-
-
790
1.7
43
790
1.7
43
Golden Vale
-
-
-
496
1.7
27
496
1.7
27
1,525
4.9
242
5,078
3.1
510
6,603
3.5
752
Total
12
DELTA LITHIUM LIMITED
Interim Financial Report 31 December 2024
Table 4: Mineral Resource Estimate for Mt Ida Lithium Project.
Mt Ida Lithium September 2023
Cut-off
Resource category
Li2O
Ta2O5
grade
Tonnes
Grade
Li2O
Grade
(Li2O%)
(Mt)
(% Li2O)
(Kt)
(Ta2O5 ppm)
-
-
-
-
1.3
1.0
14
189
1.2
0.9
11
144
Total Resource
2.5
1.0
25
167
Measured
-
-
-
-
1.5
1.2
18
206
1.3
1.1
14
156
Total Resource
2.7
1.2
32
183
Measured
-
-
-
-
5.0
1.4
72
238
4.3
1.2
50
156
9.3
1.3
123
200
-
-
-
-
Measured
Indicated
Sparrow
Inferred
0.55
Indicated
Timoni
Inferred
0.55
Indicated
Sister Sam
Inferred
Total Resource
Total Measured
0.55
Total Indicated
7.8
1.3
104
224
Total Inferred
6.8
1.1
76
154
Total
14.6
1.2
180
191
Notes:
Tonnages and grades have been rounded to reflect the relative uncertainty of the estimate. Inconsistencies in the totals are due to rounding.
Eureka Gold Project
The Eureka gold project is roughly 50km north of Kalgoorlie. Delta disposed of the non-core Eureka project to Javelin Minerals
for $1.5M cash consideration, $1.5M in Javelin shares and up to $1M contingent/deferred consideration subject to
recommencement of mining operations or achieving a Mineral Resource Estimate in excess of 200,000ozs at a cut-off grade of
0.5g/t.
Corporate
Fundraising
During the quarter ended 31 December 2024 there was $782,662.50 received for the exercise of 3,134,650 unlisted $0.25
options. 10,100,460 options expired unexercised during the quarter.
There were 2,600,000 performance rights issued and 2,098,750 performance rights cancelled.
2024 Annual General Meeting
The 2024 AGM was held on 27 November 2024. All resolutions in the Notice of AGM were passed on a poll.
Asset Disposal
Delta disposed of the non-core Eureka gold project to Javelin Minerals for $1.5M cash consideration, $1.5M in Javelin shares
and up to $1M contingent/deferred consideration subject to recommencement of mining operations or achieving a resource in
excess of 200,000ozs at a cut-off grade of 0.5g/t.
Board and Management
In November Mr Nader El Sayed was appointed to the role of Chair of the Board following the resignation of Mr Chris Ellison.
Mr Shane Murray was promoted to the role of Exploration Superintendent in October following the resignation of Charles Hughes
as Chief Geologist in the previous quarter.
13
DELTA LITHIUM LIMITED
Interim Financial Report 31 December 2024
Competent Persons Statement
Information in this Announcement that relates to exploration results is based upon work undertaken by Mr. Shane Murray, a
Competent Person who is a Member of the Australasian Institute of Geoscientists (AIG). Mr. Murray has sufficient experience
that is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is
undertaking to qualify as a ‘Competent Person’ as defined in the 2012 Edition of the ‘Australasian Code for Reporting of
Exploration Results, Mineral Resources and Ore Reserves’ (JORC Code). Mr. Murray is an employee of Delta Lithium Limited
and consents to the inclusion in this announcement of the matters based on his information in the form and context in which
it appears. Refer to www.deltalithium.com.au for past ASX announcements.
Past Exploration results and Mineral Resource Estimates reported in this announcement have been previously prepared and
disclosed by Delta in accordance with JORC 2012. The Company confirms that it is not aware of any new information or data
that materially affects the information included in these market announcements. The Company confirms that the form and
content in which the Competent Person's findings are presented here have not been materially modified from the original
market announcement, and all material assumptions and technical parameters underpinning Mineral Resource Estimates in
the relevant market announcement continue to apply and have not materially changed. Refer to www.deltalithium.com.au
for details on past exploration results and Mineral Resource Estimates.
Forward looking statements
This document may contain “forward-looking statements” and other forward-looking information based on the Group’s
expectations, estimates and projections as of the date on which the statements were made. This forward-looking information
includes, among other things, statements with respect to the Group’s business strategy, plan, development, objectives,
performance, outlook, growth, cash flow, projections, targets and expectations, Mineral Resources and results of exploration.
Generally, this forward-looking information can be identified by the use of forward-looking terminology such as ‘outlook’,
‘anticipate’, ‘project’, ‘target’, ‘likely’,’ believe’, ’estimate’, ‘expect’, ’intend’, ’may’, ’would’, ’could’,’ should’,
’scheduled’, ’will’, ’plan’, ’forecast’, ’evolve’ and similar expressions. Persons reading this document are cautioned that such
statements are only predictions, and that the Group’s actual future results or performance may be materially different.
Forward-looking information is subject to known and unknown risks, uncertainties and other factors that may cause the
Group’s actual results, level of activity, performance or achievements to be materially different from those expressed or
implied by such forward-looking information. Forward-looking information is developed based on assumptions about such
risks, uncertainties and other factors, including but not limited to general business, economic, competitive, political and
social uncertainties; the actual results of current exploration activities; conclusions of economic evaluations; changes in
project parameters as plans continue to be refined; future commodity prices; possible variations of ore grade or recovery
rates; failure of plant, equipment or processes to operate as anticipated; accident, labour disputes and other risks of the
mining industry; and delays in obtaining governmental approvals or financing or in the completion of development or
construction activities. This list is not exhaustive of the factors that may affect our forward-looking information. These and
other factors should be considered carefully and readers should not place reliance on such forward-looking information.
Recipients of this document must make their own investigations and inquiries regarding all assumptions, risks, uncertainties
and contingencies which may affect the future operations of the Group and the Group’s securities. The Group disclaims any
intent or obligations to or revise any forward-looking statements whether as a result of new information, estimates, or
options, future events or results or otherwise, unless required to do so by law.
CONVERTIBLE SECURITIES
Options
At the date of this report, unissued shares of the Group under option are:
Number of Securities
Exercise Price
1,000,000
$0.77
Number Vested &
Exercisable
1,000,000
Expiry Date
26 Jul 2025
3,000,000
$0.25
3,000,000
21 Sep 2025
5,000,000
$0.85
5,000,000
30 Sep 2025
3,000,000
$0.40
3,000,000
26 Nov 2027
12,000,000
12,000,000
14
DELTA LITHIUM LIMITED
Interim Financial Report 31 December 2024
Performance Rights
At the date of this report, unissued shares of the Group pursuant to performance rights issued to incentivise its directors,
employees and other vendors are:
325,000
16-Aug-23
Number Vested &
Exercisable
-
825,000
22-Dec-22
-
Number of Securities
Grant Date
Expiry Date
16-Aug-27
23-Jan-28
1,500,000
27-Apr-23
-
8-May-28
1,000,000
12-Jun-23
-
13-Jun-28
200,000
28-Aug-23
-
3-Nov-25
8,347,500
15-Jul-24
-
16-Jul-29
2,600,000
27-Nov-24
-
26-Nov-29
14,797,500
-
FINANCIAL REVIEW
Losses from ordinary activities after income tax
Cents per share for losses attributable to the ordinary equity holders of the company
31-Dec-24
$
(165,740)
(0.02)
31-Dec-23
$
(1,685,170)
(0.31)
The Company had cash and cash equivalents of $70,713,336 on hand as at 31 December 2024 (30 June 2024: $86,686,146).
SUBSEQUENT EVENTS
There were no subsequent events that required adjustment to or disclosure in the interim financial report.
AUDITORS’ INDEPENDENCE DECLARATION
A copy of the auditor’s independence declaration as required under section 307C of the Corporations Act 2001 is set out on
page 16.
This report is signed in accordance with a resolution of the Board of Directors.
James Croser
Managing Director
Dated 10 March 2025
15
Lead Auditor’s Independence Declaration under
Section 307C of the Corporations Act 2001
To the Directors of Delta Lithium Limited
I declare that, to the best of my knowledge and belief, in relation to the review of Delta Lithium Limited
for the half-year ended 31 December 2024 there have been:
KPMG
i.
no contraventions of the auditor independence requirements as set out in the Corporations
Act 2001 in relation to the review; and
ii.
no contraventions of any applicable code of professional conduct in relation to the review.
Glenn Brooks
Partner
Perth
10 March 2025
KPMG, an Australian partnership and a member firm of the KPMG global organisation of independent member firms affiliated
with KPMG International Limited, a private English company limited by guarantee. All rights reserved. The KPMG name and
logo are trademarks used under license by the independent member firms of the KPMG global organisation. Liability limited by
a scheme approved under Professional Standards Legislation.
DELTA LITHIUM LIMITED
Interim Financial Report 31 December 2024
Condensed Consolidated Statement of Profit or Loss and Other Comprehensive Income
For the half-year ended 31 December 2024
Notes
31-Dec-24
31-Dec-23
$
$
Income
Other income
6
1,298,842
1,250,281
Net fair value gain/(loss) on financial assets
8
146,260
(268,040)
1,445,102
982,241
(1,592,857)
(2,490,288)
Corporate & administrative expenses
(616,668)
(1,438,005)
Public relations & marketing expenses
(116,237)
(384,567)
(494,536)
564,268
Net (loss) on disposal
(64,881)
-
Exploration expenditure expenses
(106,417)
-
-
(500,408)
(156,447)
(124,105)
Total expenditure
(3,148,043)
(4,373,105)
Operating loss
(1,702,941)
(3,390,864)
Finance income
1,843,636
1,781,572
Finance costs
(46,922)
(75,878)
1,796,714
1,705,694
93,773
(1,685,170)
-
-
93,773
(1,685,170)
(259,513)
-
Other comprehensive income
-
-
Other comprehensive (loss) net of tax
Share your feedback